Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical NETAJI SUBHAS PALLY DURGAPUR WEST BENGAL PIN 713201 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713201 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 38 4 NEW SANTOSHPUR 1ST LANE KOLKATA 700075 | KOLKATA | WEST BENGAL | 700075 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical BLOCK C 1ST FLOOR MEGHAMALLAR APPARTMENT 144 NARASINGHA DUTTA ROAD KADAMTALA HOWRAH WEST BENGAL 711101 | HOWRAH | WEST BENGAL | 711101 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical FLAT NO S 0202D SHREE APARTMENT URVASHI HOUSING COMPLEX CITY CENTRE DURGAPUR WEST BENGAL PIN 713216 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713216 | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹35,500
Closing Date
19 Sept 2026, 4:00 pmClosed
The GM Power and Project DPL
Office of The GM Power and Project DPPS DPL
Short shut down Maintenance work of BHEL ESP FAA 8X45M2 2X92150 2 of Unit 8 DPPS DPL
2026_DPL_1040654_1
WBDPL/PP/T/12011 (99)/19/2026 /2026/AHP EM/E/150 DATED 04.09.2026
Open Tender
Miscellaneous Works
Item Rate
Office of the GM Power and Project DPPS DPL
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹35,500
Conference Room Technical Building DPPS DPL
23 Sept 2026
5 Sept 2026
23 Sept 2026
5 Sept 2026
19 Sept 2026
8 Sept 2026
7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance work of BHEL ESP (FAA-8X45M2-2X92150-2) of Unit-8, DPPS, DPL | |||||
| 1.01 | LP Water Jet cleaning: Water jet washing of total ESP internal including all hoppers, collecting plates, emitting electrodes & other allied zones. At the time of water washing if any chokage is found in the hoppers, the same shall be cleared immediately. All arrangements including hose & LP pressurizing pumps for the job has to be arranged by the vendor. | 1 | LS | - | - |
| 1.02 | EERM system: checking & rectification of emitting rapping system of all the ESP fields thoroughly including housing bearing assembly (checking & replacement if needed); job includes replacement/repair & alignment of rapping shafts, plain type bearings, pin wheels, hammer assembly of all rapping system if required after checking of all ESP fields.(Max. 20% of total qty) | 20 | NOS | - | - |
| 1.03 | CERM system: : checking & rectification of collecting rapping system of all the ESP fields thoroughly; job includes replacement/repair & alignment of rapping shafts, bearings, pin wheels, hammer assembly of all rapping system if required after checking of all ESP fields. (Max. 20% of total qty) | 10 | NOS | - | - |
| 1.04 | Support insulator system: Replacement/Repair (Max 20% of total qty) & cleaning of insulator & heater (100% of total qty) | 50 | NOS | - | - |
| 1.05 | TR sets: The entire transformer rectifier set should be inspected thoroughly. Cleaning of the TR body, checking of oil level, top up if necessary, changing silica gel; OC & SC test of all 28 TR sets. | 32 | NOS | - | - |
| 1.06 | Shaft insulator system: Replacement/cleaning of shaft insulators & heaters | 32 | NOS | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_2555817.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .