Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BLOCK M PHASE 15TH FLOOR NEW ALIPUR MARKET COMPLEX KOLKATA WEST BENGAL INDIA 700053 | KOLKATA | WEST BENGAL | 700053 | Admitted-Finance |
| 2 | Admitted-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 1 PARSWADA POST SHAHAGANJ VILLAGE | INDORE | INDORE | MADHYA PRADESH | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
2 Aug 2021, 2:00 pmClosed
Dhananjay Gotamare / Rajesh Sangia
Toyo Technology Centre, Kanjurmarg East, Mumbai
DM PLANT, ETP PLANT AND ALLIED FACILITIES
2021_REFHQ_134032_1
IBCE-6373-C00-PJM-TEN-EPCC-13
Open Tender
Lump Sum TurnKey
Lump-sum
570 days
Barauni Refinery
Please refer Tender documents.
5 documents required · 5 mandatory
Exempted
New Delhi / Online VC
6 Sept 2021
7 Apr 2021
3 Aug 2021
7 Apr 2021
2 Aug 2021
17 May 2021
3 May 2021
Amount
The scope of work shall include Consistency Checks, HAZOP study, Process and Basic Engineering, Residual Process Engineering, Detailed Engineering including design, Project Management, site enabling jobs, Topography survey and Soil Investigation, underground scanning, Total Procurement (including but not limited to chemicals, catalysts, media, nutrient, microbes, solvents, special tools and tackles, pre-commissioning spares, commissioning spares, startup spares, mandatory spares, consumables), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling and Storage of all Equipment, Materials, items and other Construction Materials at site, Construction Management & Supervision, Construction and Installation (including Civil, Electrical and Instrumentation works) installation of Tie-in points of Piping, Instrumentation, Electrical, Testing, Insulation, Painting, First fill of chemicals, microbes, nutrients, solvents, media and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance which shall be obtained by OWNER), Mechanical Completion of Plant, Pre-commissioning, Commissioning, Start-up, Performance Guarantee Test Runs, Preparation of plant specific operating manuals, Training and other services, Operation and Maintenance for 5 Years for RO-DM-CPU system, Drinking Water System and Phenol cyanide treatment system, contract closure activities including Final invoice / billing and document hand over and handing over the entire Plant including spares with Final and “As Built” documentation to OWNER on single point responsibility basis (Lump Sum Turn Key – LSTK Basis), based on FEED Package provided by Toyo Engineering India Pvt. Ltd. (TOYO) of EPCC-13 Package for DM PLANT, ETP PLANT AND ALLIED FACILITIES for the “BARAUNI REFINERY CAPACITY EXPANSION to 9.0 MMTPA PROJECT”
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lump-sum Price for Supply Portion for completion of Scope of Work as per Bidding Document
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
ENGINEERING PRICE (DESIGN AND DETAILED ENGINEERING OF EPCC-13 AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT)
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
LUMPSUM PRICE FOR CONSTRUCTION PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [1 +2]
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Operation & Maintenance for DM PLANT, ETP PLANT AND ALLIED FACILITIES after commissioning
Monthly fixed O&M charges for First year after Commissioning
Monthly fixed O&M charges for Second year after Commissioning
Monthly fixed O&M charges for Third year after Commissioning
Monthly fixed O&M charges for Fourth year after Commissioning
Monthly fixed O&M charges for Fifth year after Commissioning
Description of Work / Item(s)
Amount
UTILITY GUARANTEES FOR EPCC–13 FOR DM PLANT, ETP PLANT AND ALLIED FACILITIES AS PER BIDDING DOCUMENT
GUARANTEED POWER CONSUMPTION FOR ROTATING & PACKAGE EQUIPMENT
GUARANTEED CHEMICAL CONSUMPTION (H2O2) FOR PHENOL CYANIDE TREATMENT FACILITY
Ion Exchange India Ltd
VA Tech Wabag Ltd
PARAMOUNT LIMITED
Ion Exchange India Ltd
VA Tech Wabag Ltd
PARAMOUNT LIMITED
Ion Exchange India Ltd
VA Tech Wabag Ltd
PARAMOUNT LIMITED
Ion Exchange India Ltd
LARSEN AND TOUBRO LIMITED
PARAMOUNT LIMITED
LARSEN AND TOUBRO LIMITED
VA Tech Wabag Ltd
Ion Exchange India Ltd
VA Tech Wabag Ltd
Ion Exchange India Ltd
LARSEN AND TOUBRO LIMITED
Bidder Name
PARAMOUNT LIMITED
VA Tech Wabag Ltd
Ion Exchange India Ltd
LARSEN AND TOUBRO LIMITED
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .