Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.1 L+₹1,240 (0.30%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹4.3 L+₹18,918 (4.60%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹5.0 L+₹88,935 (21.6%)Rejected-Finance | L4 | Rejected-Finance Rejected |
Tender Value
₹4.1 L
EMD Value
₹4,127
Closing Date
17 Dec 2024, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai
Replacing the Damaged Culvert Slab at Anaiyur Bus Stand in Ward -03
2024_MAWS_504154_1
E2/81/24-25
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,127
4 Feb 2025
27 Nov 2024
17 Dec 2024
27 Nov 2024
17 Dec 2024
27 Nov 2024
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and c
Supplying and filling in foundation and basement with filling Quarry Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification.
Cement-concrete 1.:4.:8 (one cement ,four aggregates. and. eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification (Building data Pg.No: 19 Sl.no:12) MDU-CORP-BUILDING DATA-P-28-SL No:10
Supplying, erecting, shuttering with necessary supports for plinth beam with all Cross bracing etc.,complete (RCC column footing plinth, beam and lintel sides) (Building data Pg.No: 26 SI.no 14(f)
Supplying and erecting Centering for sides and strutting for plain surface sush- in reinforced cement concrete Column boxing top and bottom slabs,side s1abs,sunshade with necessary facia with all cross bracing etc, complete in all floors of any hight [The retrived materials should be taken back by the contract] using steel plates {Bottom only}(Building data Pg.No: 26 Sl.no:14(a)
Supplying and erecting Centering for sides and strutting for plain surface sush- in reinforced cement concrete Column boxing top and bottom slabs,side s1abs,sunshade with necessary facia with all cross bracing etc, complete in all floors of any hight [The retrived materials should be taken back by the contract] using steel plates {vertical Sides only}(Building data Pg.No: 26 Sl.no:14(a)
Reinforced Cement concrete 1:11/2:3 (One cement.one and half sand and three aggregate)using 20mm machine crushed stotie jelly for all RCC items of work including vibrating charges and curing etc. complete (Building data Pg.No: 27 Sl.no:15)
Supplying fabricating and placing in position of (M.S. grills) for reinforced rate including cost of steel for all WOrks. The Rate to include cost of binding wire also (Building data Pg.No: 34 Sl.no:22)
Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Add GST 18%
M PUSHPARAJ (BID ID -1211707)
N NALLATHAMBI (BID ID -1212207)
R POONGAVANAM (BID ID -1211712)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .