Tender Value
₹55.6 L
EMD Value
₹1.1 L
Closing Date
27 Jul 2026, 5:30 pm
Dy. General Manager (Electrical)
DGM Elect Contract Division Teesta V Power Station Balutar Singtam Distt East Sikkim 737134
Repair and maintenance work in Basement Floor and Room no. 1 and 2 of VIP Guest House, Teesta V Power Station, Balutar Civil and Electrical works.
2026_NHPC_916006_1
NH/TSV/Cont/CC-359/NIT-1084
Open Tender
Civil Works
180 days
Teesta-V Power Station, Balutar
As per Tender Document
5 documents required · 5 mandatory
₹1,180
NHPC Limited
₹1.1 L
Yes
6 Jul 2026
6 Jul 2026
1 Aug 2026
6 Jul 2026
27 Jul 2026
6 Jul 2026
6 Jul 2026 - 16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead : Thickness above 10 mm up to 25 mm | - | sqm | - | - |
| 2 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead , For thickness of tiles 10 mm to 25 mm | - | sqm | - | - |
| 3 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | - | Each | - | - |
| 4 | Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead : 75 to 80 mm dia pipe | - | Rm | - | - |
| 5 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 1 | cum | - | - |
| 6 | Dismantling W.C. Pan of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in-Charge. | - | Each | - | - |
| 7 | Dismantling of flushing cistern of all types (C.I./ PVC/ Vitreous China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead. | - | Each | - | - |
| 8 | Dismantling 15 to 40 mm dia G.I. pipe including stacking of dismantled pipes (within 50 metres lead) as per direction of Engineer-in-Charge. (a) Internal Work- Exposed on wall | - | Rm | - | - |
| 9 | Disconnecting damaged overhead/terrace PVC water storage tank of any size from water supply line and removing from the terrace including shifting at ground level as per direction of Engineer-in-charge | - | Each | - | - |
| 10 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) | 1 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.89 MB
TDCC359.pdf
Tender Documents • 11.97 MB
SafetyManualaug2024.pdf
Additional Documents • 0.73 MB
BOQ_962656.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid