| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 CrAccepted-AOC N A | ₹7.3 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹7.3 CrRejected-Finance | ₹7.3 Cr | L2 | Rejected-Finance NOT ADMITTED |
| 3 | L3₹7.5 CrRejected-Finance BELDEI GARAPUR SAHSON PHULPUR PRAYAGRAJ | PHULPUR | PRAYAGRAJ | UTTAR PRADESH | ₹7.5 Cr | L3 | Rejected-Finance NOT ADMITTED |
| 4 | L4₹7.6 CrRejected-Finance | ₹7.6 Cr | L4 | Rejected-Finance NOT ADMITTED |
| 5 | L5₹7.7 CrRejected-Finance | ₹7.7 Cr | L5 | Rejected-Finance NOT ADMITTED |
Tender Value
₹10.7 Cr
EMD Value
₹21.5 L
Closing Date
15 Dec 2025, 12:00 pmClosed
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
Widening and Strengthening of Gaurabadshahpur Rampur Naipura Kaboolpur Nathanpur Puliya (ODR) Road Chainage 0.000 to 8.170 in Dist Jaunpur
2025_CEUVZ_1081492_2
4848/SE Tender/jnp-gzp circle/25 Date-25-09-2025
Open Tender
Civil Works
365 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹21.5 L
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
22 Dec 2025
5 Dec 2025
15 Dec 2025
5 Dec 2025
15 Dec 2025
5 Dec 2025
5 Dec 2025
Amount
Clearing & grubbing road land including uprooting wild vegitations grass, bushes, scrubs, sapling & trees of girth upto 300 mm removal of stumps of such trees cut earlier and disposal of unserviseable materials and stacking of serviseable material to be used or octioned upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical specification Claise 201 (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Construction of Embankment with Material Deposited from Roadway Cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including all T&P, labour cess etc. but excluding G.S.T.)
Construction of Embankment with Material obtained from Right of way:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401(Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including cost of all material, T&P, Labour, all taxes and labour cess etc but Excluding G.S.T. )
Providing and applying primer coat with SS bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and laying dense (Grade-2) bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and laying bituminous concrete (Grade-2) with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Construction of un-reinforced, dowel jointed, plain cement concrete pavement (M35) over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Construction of sub grade and earthen shoulder with approved material obtained from Roadway Cutting with all lift, lead & transporting to site spreading to required slope and compacting to meet requirement of table 300.2(Including all material, T&P, labour cess etc. but excluding G.S.T.)
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance or 60 meters (200 feet) Including all material, T&P, labour cess etc. but excluding G.S.T.)
Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 meters (200feet) Including all material, T&P, labour cess etc. but excluding G.S.T.)
Bricks on edge pavement on patries/bed with bricks laid dry, joints filled with flush pointing including preparation of base to proper slope and its ramming, spreading a layer of 1cm (3/8”) depth of over the sub grade and including supply of all materials, lab our and T&P etc, required for proper completion of the work. SOR-663 & 576B Including all material, T&P, labour cess etc. but excluding G.S.T.)
Supply and filling of local sand in foundation and plinth including coast of sand, cartage upto site and placing in position ramming dressing and levelling required for proper completion of the work. Including all material, T&P, labour cess etc. but excluding G.S.T.)
Plain cement concrete 1 : 3 : 6 nomional mix in foundation with crushed stone aggregate 40 mm nomional size mechnically mix place in foundation and compacted by vibration including curring for 14 days. Including all material, T&P, labour cess etc. but excluding G.S.T.)
(PCC M-15) Plan Cement concrete (Abutment Foundation) with 4cm. gauge approved stone ballast, approve coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. Including all material, T&P, labour cess etc. but excluding G.S.T.)
Concrete with 4cm. gauge brick ballast, sand of 1.25 F.M. and cement in proportion of 1:4:8 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work. SOR No-275 (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Brick work in 1:3 cement and course sand mortar in foundation and plinth including all materials labour tools and plants etc. complete work. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
12mm thick plaster with cement mortar in proportion of 1:3 cement and sand of 1.25 F.M. over brick work minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper completion of the work. As Per SOR Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Including all material, T&P, labour cess etc. but excluding G.S.T.)
(M-30) R.C.C work for Slab with cement approved coarse sand and 2cm gauge approved dalla grit proportion as per job mix excluding supply of reiforcement and its bending but uncluding its fixing and binding the same with 24BWGGI binding wire complete in all respect. Including all material, T&P, labour cess etc. but excluding G.S.T.)
Mild Steel or iron in plan work such as reinforced concrete or reinforced brick work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bendd hools and authorized overlapping shall be measured up to floor level. Sl No-3 Sch Pwd-504 Including all material, T&P, labour cess etc. but excluding G.S.T.)
Provindig and fixing of weep holes with 100mm dia P.V.C. pipe including supply of all materials labour tools and plants etc. complete work. Including all material, T&P, labour cess etc. but excluding G.S.T.)
Plain Cement Concrete 1:3:6 nominal mix in Foundation with crust Brick Ballast 40mm nominal size mechnicaly mix, placed in foundation and compacted by vibration including curing for 14 days (With Brick bats) Excluding cost of Brick ballast (21.38@70%=14.96 Cum) Including all material, T&P, labour cess etc. but excluding G.S.T.)
Reinforced cement concrete in open foundation complete as per drawing and technical specifications (M-25) For Raft (Including all material, T&P, labour cess etc. but excluding G.S.T.)
M-150 brick work in 1:4 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. SOR No-305 (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Pointing with cement mortar (1:3) on brick work in substructure as per Technical Specification. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Widening of Hume pipe Culvert 2.50 Meter 450mm dia (B/S) (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Widening of Hume pipe Culvert 2.50 Meter 600mm dia (B/S) (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Widening of Hume pipe Culvert 2.50 Meter 900mm dia (B/S) (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Road Marking with hot applied Thermoplastic reflectorising Glass Beads on Butumunous Surface (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Supplying and Instalation of Delinators (road way indicators, hazard markers, object marker) 80-100cm, high above ground level, painted black and white in 15cm, wide strips, fitted with 80x100 mm rectangular or 75mm dia circular reflectorised panel at the top buried or pressed into the ground and conforming to IRC:79 and the drawing. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 mad of high intensity grade sheeting vide clause 801.3, fixed cover aluminium shting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x75 mm x6 mm firmly fixed to th ground by means of properly dsignd foundation with M-15 grade cment conc. 45 cm x 45 cm x 60 cm, 60 cm below ground lvel as per approved drawing. The retro-reflective sheeting shall be tested for 3 years out door weathering test in indian conditions as per IRC 67:2012 and proff of the same in the form of government report shall be uploded while quooating tender. 90cm high Octangon (On Village link roads- for Stop Sign Caution Board) (Including all material, T&P, labour cess etc. but excluding G.S.T.)
PART A Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024
1st year- maintainance cost 0% on Above Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
2nd year- maintainance cost 0.25% on Above Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
3rd year- maintainance cost 0.50 % on Above Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
4th year- maintainance cost 0.75% on Above Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
5th year- maintainance cost 1.00 % on Above Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
M/s D.K. Associate (BID ID -5745227)
M/s JAYSINGH (BID ID -5746953)
SHIVANG ASSOCIATES (BID ID -5740095)
ganga sagar singh (BID ID -5744471)
J.P.ENTERPRISES (BID ID -5737831)
M/S MAHENDRA KUMAR SINGH (BID ID -5745875)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.09 MB
SBD2.pdf
Additional Documents • 0.15 MB
5967.pdf
Additional Documents • 0.79 MB
BOQ_2018216.xls
BOQ • 0.27 MB
AdeundumGaurabadshapur.pdf
Tender Documents • 15.38 MB
SBD1.pdf
Additional Documents • 0.30 MB
Download all tender documents and submit your bid