Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | -0.50% | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 LAdmitted-Finance | -0.25% | ₹2.9 L | L2 | Admitted-Finance |
| 3 | L3₹2.9 LAdmitted-Finance | +0.00% | ₹2.9 L | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
6 Feb 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Construction of Nallah Laying of Crates and earthfilling from House of Ram Lubhaya to onwards at village Chakra (Part-B) Pyt. Kheri B Block Bishnah under MLA CDF for the Financial Year 2025-26
2026_RDPR_301145_10
e-NIT No. 758 REWJ of 2025-26 dated 22-01-2026
Open Tender
Civil Works
45 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,880
13 Feb 2026
22 Jan 2026
7 Feb 2026
22 Jan 2026
6 Feb 2026
22 Jan 2026
Labour engaged for general site clearance.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete.
Excavating , supplying and filling of local earth including royality and 5 km initial carriage including ramming and watering not exceeding 20 cm in each layer
Sand + Bajri for (25km)
Add cost of sign board
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_977159.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid