Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC HNO 277C SECTOR 39 GURUGRAM 122001 | GURUGRAM | HARYANA | 122001 | L1 | Accepted-AOC Due to lowest bidder | |
| 2 | L2₹1.7 L+₹43,200 (33.3%)Rejected-Finance BALIYALI WARD NO 6 VPO BALIYALI TEHSIL BAWANI KHERA DISTRICT BHIWANI | BALIYALI | BHIWANI | HARYANA | L2 | Rejected-Finance Due to not lowest bidder | |
| 3 | L3₹1.8 L+₹54,000 (41.7%)Rejected-Finance | L3 | Rejected-Finance Due to not lowest bidder |
Tender Value
Refer Docs
EMD Value
₹3,475
Closing Date
6 Jun 2022, 5:00 pmClosed
Executive Engineer HSVP Division No. V Gurugram
M,Block South city -I Gurugram.
Annual Maintenance of Internal roads Sector 29 Gurugram Cleaning of road side drain and shifting of malba etc and all other works contingent thereto
2022_HBC_221896_1
JOB NO 08/2022
Open Tender
Civil Works
Tender
60 days
GURUGRAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹250
₹3,475
26 Nov 2022
18 May 2022
7 Jun 2022
18 May 2022
6 Jun 2022
18 May 2022
Amount
Cleaning of existing road side drain of internal road sector-29. The cleaning job will include removal of silt / soil / waster material / unserviceable material / malba / garbage / removing of cover & re-fixing after desilting work etc. complete and shall be disposed off at suitable place as intimated by the E-I-C complete in all respect to fully satisfaction of Engineer-in-charge. The rates shall including traffic control / diversion measures. Isolation of site & safety equipments etc. complete in all respect .Notes : - 1. Disposal of de-silted material within 24 hours form the site to the suitable location upto 5.00 K.M or as directed by the Engineer-in-charge. 2. Before starting of work, cleaning of road side drain/ channel, the site shall be verified and workout in the presence of contractor by the concerned SDE & JE. 3. The quantity of cleaning / de-silting shall be measured and checked by the concerned SDE & JE. The SDE & JE. Shall check the bed level before start of work and de- silting / cleaning alongwith representative of the contractor. 4. Video-graphy shall be taken before start of work, during execution of work and after completion of work properly.
The Baliyali Shiva Co Op L CSociety Ltd
MANOHAR LAL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .