Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-AOC VILL P O CHINCHURIA DIST PASCHIM BARDHAMAN PIN 713378 W B | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | ₹2.5 L | 1 | Accepted-AOC Eligible L-1 bidder |
| 2 | 2₹2.5 LRejected-Finance VILL P O CHINCHURIA DIST BURDWAN WB PIN 713378 | CHINCHURIA | BURDWAN | WEST BENGAL | 713378 | ₹2.5 L | 2 | Rejected-Finance Quoted more than l-1 bidder. |
| 3 | Rejected-Technical VILL CHINCHURIA PO CHINCHURIA JAMURIA PASCHIM BARDHAMAN WB 713378 | JAMURIA | PASCHIM BARDHAMAN | WB | 713378 | - | - | Rejected-Technical Technically not eligible |
| Sl No | Description | Qty | Unit | CHAKRABORTY AND COMPANY L1 | JAY MAA DAL DALI KALI L2 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 1.01Material Cost | |||||
| 1.02 | Supply of 250 W HPSV lamp | 30 | no | 644 ₹19,320 | 700 ₹21,000 |
| 1.03 | Supply of 250 W HPSV Ballast | 30 | no | 2,252 ₹67,560 | 2,260 ₹67,800 |
| 1.04 | Supply of ignitor 70W to 400W | 30 | no | 400 ₹12,000 | 410 ₹12,300 |
| 1.05 | Supply of 2*4 sq.mm PVC insulated copper conductor for sevice connection. | 200 | mtr | 157 ₹31,400 | 170 ₹34,000 |
| 1.06 | Supply & Fixing of MCCB 03 Pole 63 Amp. | 6 | no | 8,440 ₹50,640 | 8,500 ₹51,000 |
| 1.07Labour Cost: | |||||
| 1.08 | Dismantling,repairing & re-fitting of 250W HPSV light.(01 Skilled @ Rs 760 / -& 02 Semiskilled @ 632 / -labour for 10 days) | 30 | no | 674.66 ₹20,239.8 | 674.66 ₹20,239.8 |
| 1.09 | Supply & Fixing of MCCB 03 Pole 63 Amp. | 6 | no | 890 ₹5,340 | 890 ₹5,340 |
Tender Value
₹2.4 L
EMD Value
₹3,002
Closing Date
9 Jan 2026, 5:00 pmClosed
AE EnM
S.B Project
Dismantling,Repairing and re-fitting of HPSV 250 W Light fittings at various locations at Workshop under S.B. Project.
2025_ECL_350221_1
GM/SBA/EnM/Tender/25-26/70
Open Tender
Electrical and Maintenance Works
15 days
S.B.Project
Please refer tender document.
6 documents required · 6 mandatory
₹3,002
18 Feb 2026
29 Dec 2025
10 Jan 2026
30 Dec 2025
9 Jan 2026
30 Dec 2025
30 Dec 2025 - 6 Jan 2026
Item Description/ Heading
Supply of 250 W HPSV lamp
Supply of 250 W HPSV Ballast
Supply of ignitor 70W to 400W
Supply of 2*4 sq.mm PVC insulated copper conductor for sevice connection.
Supply & Fixing of MCCB 03 Pole 63 Amp.
Labour Cost:
Dismantling,repairing & re-fitting of 250W HPSV light.(01 Skilled @ Rs 760 / -& 02 Semiskilled @ 632 / -labour for 10 days)
Supply & Fixing of MCCB 03 Pole 63 Amp.
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 1.69 MB
Tendernotice_3.pdf
PDF • 1.05 MB
BOQ_363011.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid