| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-Finance | ₹4.0 L | L1 | Accepted-Finance Lowest amount quoted |
| 2 | L2₹4.0 LRejected-Finance | ₹4.0 L | L2 | Rejected-Finance Highest amount quoted |
| Sl No | Description | Qty | Unit | MR.R.GNANAPRAKASH CONTRACTOR L2 | MR.ANTONY, CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. | 7.66 | Cum | 263.75 ₹2,020.33 | 263.75 ₹2,020.33 |
| 2.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. | 6.53 | Cum | 5,412.95 ₹35,346.56 | 5,412.95 ₹35,346.56 |
| 3.00 | Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush pointing including curing neat finishing, etc., complete complying with standard specifiction. | 8.66 | Cum | 5,754.25 ₹49,831.81 | 5,754.25 ₹49,831.81 |
| 4.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five sand) including curing neat finishing, etc., complete complying with standard specifiction. | 7.74 | Cum | 6,115.5 ₹47,333.97 | 6,115.5 ₹47,333.97 |
| 5.00 | Refilling the basement with excavated earth other than Sand complying the Standard specification | 3.38 | Cum | 48.75 ₹164.78 | 48.75 ₹164.78 |
| 6.00 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x3mm of boarding | 10.15 | Sqm | 1,094.9 ₹11,113.24 | 1,094.9 ₹11,113.24 |
| 7.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 2.61 | Cum | 9,023.75 ₹23,551.99 | 9,023.75 ₹23,551.99 |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 290 | kg | 91.85 ₹26,636.50 | 91.85 ₹26,636.50 |
| 9.00 | plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 42.56 | Sqm | 285.45 ₹12,148.75 | 285.45 ₹12,148.75 |
| 10.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 52.59 | Sqm | 262.45 ₹13,802.25 | 262.45 ₹13,802.25 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
12 Mar 2026, 1:00 pmClosed
The President, Seliyanallur panchayat
The Panchayat Office, Seliyanallur panchayat
Construction of GLR with borewell and pipeline arrangement in North seliyanallur in Seliyanallur panchayat
2026_RDTN_672677_2
Seliyanallur 02/25.26
Open Tender
Civil Works
The Panchayat Office, Seliyanallur panchayat
Refer tender documents
2 documents required · 2 mandatory
₹0
₹5,000
12 Mar 2026
10 Mar 2026
12 Mar 2026
10 Mar 2026
12 Mar 2026
10 Mar 2026
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush pointing including curing neat finishing, etc., complete complying with standard specifiction.
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five sand) including curing neat finishing, etc., complete complying with standard specifiction.
Refilling the basement with excavated earth other than Sand complying the Standard specification
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x3mm of boarding
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Drilling of 150 mm dia deep bore well in hard rock area(Outer Pipe Length) including labour charges and transportation charges
Drilling of 150 mm dia deep bore well in hard rock area including labour charges and transportation charges
Supply and Delivery of 200mm dia 6KSC Casing Pipe
Supply and delivery of Single phase Submersible pump set of duty condition 20 Lpmx100m head Motor
Supply and delivery of Single phase 2HP Pannel Board
Supply and delivery of 32mm UPVC Pipe
Supply and delivery of 2.5 sqmm 3 core copper cable
Labour charges for erection of new 2Hp submersible pump set in the bore well and commissioning
Supply and delivery of MS kisok including all materials and all labour charges etc
Supply and delivery of 40 mm PVC pipe including all materials and all labour charges etc
Lowering PVC pipes and specials in the trench and laying to proper graed and alignment and as Technical officers
Supply and delivery of 32mm GI pipe including all materials and all labour charges etc
Lowering GI pipes and specials in the trench and laying to proper graed and alignment and as Technical officers
Earth Work excavation Depositing or bark with initial Lead and lifts in Narrow trenched for laying of pipes for water Supply as per
Refilling excated Earth laying of pipes for 40mm pvc
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC Open Light point / fan point (For electronic Regulator) SD 18
Supply and run of 2 of 4.00 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade on 7/20GI bearer wire for service connection mains SD 65
Supply and run of 2 X 1.5 sq.mm (22 / 0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade in 25 mm dia GI pipe ( Class ' B ' ) suitably bent at both ends with necessary angle iron upright and end supports for mains. SD 70
Supply and fixing of WT bulk head fitting with guard ( Philips / Bajaj / Crompton / K Lite ) suitable for incandescent lamp with 100 W led bulb.SD 85
Supply and fixing of 16 Amps DPIC Switch of 500 V with fuse and neutral (Side Handle) on suitable TW box PWD Earthing SD 146
Supply and fixing of TNEB Meter board SD 125
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
BOQ_808421.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid