Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC 705 SECTOR 23 127021 | BHIWANI | HARYANA | 127021 | ₹6.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.0 LRejected-Finance 208 NEAR SHIV MANDIR KIRTI NAGAR BHIWANI | BHIWANI | ₹7.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹7.5 LRejected-Finance NH 148 B NEAR BABA GHISARAM FILLING STATION VILLAGE PALI MAHENDERGARH 123029 | MAHENDERGARH | MAHENDERGARH | HARYANA | 123029 | ₹7.5 L | L3 | Rejected-Finance L3 |
| 4 | L4₹8.2 LRejected-Finance GROUND FLOOR H NO 62 KHEWAT NO 64 KHATONI NO 92 THE DURGA MAA COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED CHULI KHURD NEAR VETERINARY HOSPITAL CHULI KHURD CHULI KALAN HISAR HARYAN 2025R22988 | CHULI KALAN | HISAR | HARYANA | ₹8.2 L | L4 | Rejected-Finance L4 |
| 5 | L5₹7.6 LRejected-Finance | ₹7.6 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | akshay premium solar L5 | vats solar private limited L1 | SUNGLOW ELECTRIC POWER PVT. LTD. L3 | THE DURGA MAA CO-OPERATIVE LABOUR & CONSTRUCTION SOCIETY LTD. L4 | D.M.ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | [32.70.2]Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:-
(a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years.
(b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC
(c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees C. The PCU shall adjust the voltage and frequency level to suit grid frequency
(d) Data Monitoring System complete with accessories.
(e) Fixing of Array junction box and Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required.
(f) Lightning and surge voltage protection.
(g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. 2. Above 10 kWp and up to 100 Kwp [Through Rate] | 20 | KWP | 3,80,000 ₹76 L | 32,000 ₹6.4 L | 37,324.7 ₹7.5 L | 41,000 ₹8.2 L | 35,020 ₹7.0 L |
Tender Value
₹8.6 L
EMD Value
₹17,160
Closing Date
9 Mar 2026, 11:00 amClosed
PRAMESH Kumar
ED - Hisar
Construction of proposed new 6 bays Bus stand at existing campus of Bus stand at Barwala in Hisar Distt. (Pdg. Solar Power Plant only).RECALL
2026_HRY_505604_1
202676286338 717E 4DA0 82CD 7E6BD7765A9B666BAR
Open Tender
Electrical Works
90 days
Barwala
2 documents required · 2 mandatory
₹1,000
₹17,160
Yes
28 Apr 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
[32.70.2]Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC (c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees C. The PCU shall adjust the voltage and frequency level to suit grid frequency (d) Data Monitoring System complete with accessories. (e) Fixing of Array junction box and Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (f) Lightning and surge voltage protection. (g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. 2. Above 10 kWp and up to 100 Kwp [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_584326.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid