Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.1 LAdmitted-Finance 2 1 MIN NAGAR KOTTUR ROAD SULEESWARANPATTI POLLACHI 624006 | 624006 | ₹29.1 L | L1 | Admitted-Finance |
| 2 | L2₹33.4 L+₹4.3 L (14.9%)Admitted-Finance | ₹33.4 L+₹4.3 L (14.9%) | L2 | Admitted-Finance |
| 3 | L3₹34.2 L+₹5.2 L (17.8%)Admitted-Finance 1 SRI GOKULAM COMPLEX 15 155B MARAPALAM MADUKKARAI COIMBATORE DISTRICT 641 105 | COIMBATORE | TAMIL NADU | 641105 | ₹34.2 L+₹5.2 L (17.8%) | L3 | Admitted-Finance |
| 4 | L4₹37.2 L+₹8.1 L (27.9%)Admitted-Finance 42 641 009 | COIMBATORE | TAMIL NADU | 641009 | ₹37.2 L+₹8.1 L (27.9%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical RAMNAGAR TUKO RAMNAGAR TARAPUR CACHAR ASSAM 788003 | CACHAR | ASSAM | 788003 | - | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | M S ENGINEERS L4 | CHITHRAVARSINI AND CO L2 | ABBI ASSOCIATES L3 | M/S THANGARAJ & CO L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank within initial lead of 10M and initial lift of 2 metre in hard stiff clay stiff black hard red earth shales murums, gravel stoney earth and earth mixed with small size boulders and hard gravelly soil, etc., complete complying with standard specification. (CBE DATA 25-26 P-3) | 551 | m3 | 150 ₹82,650 | 150 ₹82,650 | 100 ₹55,100 Lowest | 180 ₹99,180 |
| 2.00 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete.(CBE DATA 25-26 P-3) | 331 | m3 | 50 ₹16,550 Lowest | 50 ₹16,550 Lowest | 60 ₹19,860 | 55 ₹18,205 |
| 3.00 | Supplying and filling in foundation and basement with Quarry Rubbish in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 54 | m3 | 350 ₹18,900 | 100 ₹5,400 | 200 ₹10,800 | 60 ₹3,240 Lowest |
| 4.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. (CBE DATA 25-26 P-4) | 59.99 | m3 | 5,500 ₹3,29,972.5 | 4,900 ₹2,93,975.5 | 4,500 ₹2,69,977.5 Lowest | 4,900 ₹2,93,975.5 |
| 5.00 | Supplying and erecting centering for sides soffits including supports and strutting upto 3.29m high for plain surface such as rectangular column top and bottom slabs of boxing, sill, slabs, sun shade etc., in all floors using mild steel slabs of sizes 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25X25x3mm for boarding laid over country wood joists of size 10cm X 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc., complete as directed. Sl.No.123 C Part-II.(CBE DATA 25-26 P-5) | 449 | m2 | 900 ₹4,04,098.2 | 1,059 ₹4,75,488.88 | 800 ₹3,59,198.4 | 450 ₹2,02,049.1 Lowest |
| 6.00 | Reinforced Cement Concrete 1:1.5:3, one part of cement, one and half parts of sand , three parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with the relevant standard specifications at all leads inside the building. (CBE DATA 25-26 P-5) | 95 | m2 | 9,000 ₹8,55,001.8 | 7,500 ₹7,12,501.5 Lowest | 8,800 ₹8,36,001.76 | 7,900 ₹7,50,501.58 |
| 7.00 | Supplying and fabricating of reinforcement steel of all diameters for reinforced cement concrete works at all heights and depths including straightening, cleaning,cutting,ending, placing in position and binding, hoisting and welding if any including cost of power, electrodes etc, cost of annealed binding wire (18 gauge), providing overlaps, tying in position and providing necessary cover blocks for all works as per detailed drawings supplied (including chairs, cranks, lap rods, spacer bars, fan hooks etc.,) with the relevant standard specifications, complete for all leads & lifts. (CBE DATA 25-26 P-8) | 92 | Qty | 9,000 ₹8,28,000 | 7,800 ₹7,17,600 | 8,900 ₹8,18,800 | 7,700 ₹7,08,400 Lowest |
| 8.00 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 4 3/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CF | 69 | M3 | 7,500 ₹5,17,522.5 | 7,000 ₹4,83,021 | 7,500 ₹5,17,522.5 | 5,600 ₹3,86,416.8 Lowest |
| 9.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 732 | M3 | 300 ₹2,19,600 | 300 ₹2,19,600 | 250 ₹1,83,000 Lowest | 250 ₹1,83,000 Lowest |
| 10.00 | Providing Glass pieces over wall with C.M. 1:5 mix plastering 20mm thick as per the Direction of the Departmental officers etc., complete. | 32.43 | M3 | 900 ₹29,187 | 400 ₹12,972 | 610 ₹19,782.3 | 100 ₹3,243 Lowest |
Tender Value
₹49.9 L
EMD Value
₹49,900
Closing Date
2 Sept 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Retaining wall at CMC colony in Ward No. 60. East zone.
2026_MAWS_694694_1
E57/2026-Two Cover-EZ
Open Tender
Civil Works
Works
150 days
Coimbatore city municipal corporation, Townhall
As per tender conditions
5 documents required · 5 mandatory
₹0
₹49,900
18 Sept 2026
17 Aug 2026
3 Sept 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank within initial lead of 10M and initial lift of 2 metre in hard stiff clay stiff black hard red earth shales murums, gravel stoney earth and earth mixed with small size boulders and hard gravelly soil, etc., complete complying with standard specification. (CBE DATA 25-26 P-3) | 551 | m3 | - | - |
| 2 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete.(CBE DATA 25-26 P-3) | 331 | m3 | - | - |
| 3 | Supplying and filling in foundation and basement with Quarry Rubbish in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 54 | m3 | - | - |
| 4 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. (CBE DATA 25-26 P-4) | 60 | m3 | - | - |
| 5 | Supplying and erecting centering for sides soffits including supports and strutting upto 3.29m high for plain surface such as rectangular column top and bottom slabs of boxing, sill, slabs, sun shade etc., in all floors using mild steel slabs of sizes 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25X25x3mm for boarding laid over country wood joists of size 10cm X 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc., complete as directed. Sl.No.123 C Part-II.(CBE DATA 25-26 P-5) | 449 | m2 | - | - |
| 6 | Reinforced Cement Concrete 1:1.5:3, one part of cement, one and half parts of sand , three parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with the relevant standard specifications at all leads inside the building. (CBE DATA 25-26 P-5) | 95 | m2 | - | - |
| 7 | Supplying and fabricating of reinforcement steel of all diameters for reinforced cement concrete works at all heights and depths including straightening, cleaning,cutting,ending, placing in position and binding, hoisting and welding if any including cost of power, electrodes etc, cost of annealed binding wire (18 gauge), providing overlaps, tying in position and providing necessary cover blocks for all works as per detailed drawings supplied (including chairs, cranks, lap rods, spacer bars, fan hooks etc.,) with the relevant standard specifications, complete for all leads & lifts. (CBE DATA 25-26 P-8) | 92 | Qty | - | - |
| 8 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 4 3/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CF | 69 | M3 | - | - |
| 9 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 732 | M3 | - | - |
| 10 | Providing Glass pieces over wall with C.M. 1:5 mix plastering 20mm thick as per the Direction of the Departmental officers etc., complete. | 32.43 | M3 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BuildingSWDDocument.pdf
Tender Documents • 0.94 MB
BOQ_835321.xls
BOQ • 0.27 MB
ITB.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .