| 1 | ₹8.4 LAWARDED | AWARDED |
Tender Value
₹10.1 L
EMD Value
₹17,000
Closing Date
27 Aug 2025, 10:30 pmClosed
Directorate of Municipal Administration
Installation of wire fencing on the compound wall at the waste disposal unit and construction of drains at the waste disposal Site in Naragund Town
DMA/2025-26/OW/WORK_INDENT44422/CALL-2
DMA/2025-26/OW/WORK_INDENT44422/CALL-2
Open
Other Works
Electronic Documents, First(One Cover)
DMA Town Municipal Council Nargunda
₹500
₹17,000
19 Aug 2025
19 Aug 2025
23 Aug 2025
Installation of wire fencing on the compound wall at the waste disposal unit and construction of drains at the waste disposal Site in Naragund Town
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating Each depos...
Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both ...
Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both ...
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manuf...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. Foundation, Sub structure of Cross drainages 5%
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .