Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹5.1 L+₹35,047.75 (7.32%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.4 L+₹58,698.55 (12.3%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹5.8 L+₹99,401.92 (20.8%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹5.9 L+₹1.1 L (23.4%)Rejected-Finance 5 361 AWAS VIKAS MAINPURI | MAINPURI | UTTAR PRADESH | 205001 | L5 | Rejected-Finance L5 |
Tender Value
₹8.6 L
EMD Value
₹17,200
Closing Date
12 Jun 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Repair Work of Shamshan Sthal and G.I Link Fencing in Village- Siroli Banger, YEA WC-06
2026_YEIDA_1155182_9
YEA/GM(PROJECT)/2026/512 DT-27/05/2026
Open Tender
Civil Works
Fixed-rate
90 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹840
₹17,200
13 Nov 2026
2 Jun 2026
15 Jun 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1m aboveground level and removal of rubbish up to distance of 50m out side the periphery of the area cleared | - | Sqm | - | - |
| 2 | Item code morth 301 Excavtion in soil using hydraulics excavator and tippers with disposal upto 1000 meters Excavation for road work in soil with hydraulics excavator including cutting and loading in tippers, trimming bottom and side slopes in accordance with requiremements of lines , grades and cross section and transportation to the embankment location within all lifts and lead upto 1000 meters | 1 | Cum | 1 | ₹1 |
| 3 | Providing and laying in position cement concrete with 4 cm gauge approved stone ballast c sand and cement in pro of 8:4:1 including supply of all material labour tools and plants etc req for proper comp of work | - | Cum | - | - |
| 4 | M-150 brick work in 1:6 cement & fine sand 1.25f.M mortar in foundation and plinth including supply of all materials labour complection of the work compiation of work (1:4:8) | 1 | Cum | - | - |
| 5 | Cement Concrete with 4cm gauge approved stone ballast corse sand and cement in the propertion of 4:2:1 including supply of all material labour tools and plants etc required for proper completion of the work. Same as above item no.279 but with 2cm gauge stone grit in stend of 4cm gauge stone lallast. UP PWD SOR-2020/DAR-18/279a | - | Cum | - | - |
| 6 | 12mm Cement Plaster of mix 1:6 (1 cement : 6 coarse sand) | - | Sqm | - | - |
| 7 | Dry Brick on Edge flooring in required pattern wirh bricks of class designation 150 on bed of earth including filling compressed woth M-150 Brick | - | Sqm | - | - |
| 8 | Finishing walls with water proofing cement paint of required shade New work (Two or more coats applied @ 3.84 kg/ 10 sqm) New work | - | Sqm | - | - |
| 9 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.
(Note:- Cement content considered in this item is @330 kg/cum.Excess/less cement used as per design mix is payable/recoverable
All work up to Plinth level.
UPPWD/SOR/DAR/5.33.1 | - | Cum | - | - |
| 10 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. (DAR/10.25.2/Based on UPPWD/SOR-2020)) | 1 | Kg. | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
9.pdf
Tender Documents • 1.32 MB
BOQ_2163999.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .