| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.6 CrAccepted-AOC PLOT NO 1 2 AASHIYANA CO OP SOCIETY N 11 CIDCO AURANGABAD | AURANGABAD | AURANGABAD | MAHARASHTRA | L1 | Accepted-AOC Accept L1 | |
| 2 | L2₹50.8 Cr+₹1.1 Cr (2.18%)Rejected-Finance 308 302 1ST FLOOR LABH CHAMBERS STATION ROAD CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | L2 | Rejected-Finance Rejected | |
| 3 | L3₹53.4 Cr+₹3.6 Cr (7.32%)Rejected-Finance AURANGABAD MAHARASHTRA | AURANGABAD | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | L3 | Rejected-Finance Rejected | |
| 4 | Rejected-Technical 19 I V I P ROAD JUNGLIGHAT PORT BLAIR 744 103 | PORT BLAIR | SOUTH ANDAMAN | ANDAMAN AND NICOBAR ISLANDS | 744103 | - | Rejected-Technical Reject |
Tender Value
₹47.5 Cr
EMD Value
₹23.7 L
Closing Date
8 Sept 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, PW Division, Aurangabad
Padampura, Aurangabad
CONSTRUCTION OF ADMINISTRATIVE, LIBRARY, LECTURE HALL BUILDING AT MAHARASHTRA NATIONAL LAW UNIVERSITY AT KANCHANWADI AURANGABAD (CONSTRUCTION LECTURE HALL BUILDING)
2023_PWR_936274_1
E TENDER NOTICE NO 34/03 FOR 2023-24
Open Tender
Civil Works - Buildings
Item Rate
730 days
Aurangabad
As per NIT
2 documents required · 2 mandatory
₹3,540
₹23.7 L
Office of C.E PW Region, Aurangabad
2 Apr 2024
18 Aug 2023
9 Sept 2023
18 Aug 2023
8 Sept 2023
18 Aug 2023
18 Aug 2023 - 30 Aug 2023
30 Aug 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | CIVIL | - | - | - | - |
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | - | Per Cubic Metre | - | - |
| 2 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | - | Per Cubic Metre | - | - |
| 3 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means | - | Per Cubic Metre | - | - |
| 4 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 m to 3.0 m.) By Mechanical Means | 1 | Per Cubic Metre | - | - |
| 5 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means | - | Per Cubic Metre | - | - |
| 6 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m).By Mechanical Means | - | Per Cubic Metre | - | - |
| 7 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete. | - | Per Cubic Metre | - | - |
| 8 | Filling in plinth and floors with approved excavated material in 15cm. to 20cm. Layers including watering and compacting etc. complete. | - | Per Cubic Metre | - | - |
| 9 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed. | 1 | Per Cubic Metre | - | - |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1631633.xls
BOQ Document • 0.95 MB
127497335.pdf
Tender Document • 0.08 MB
MNLULECTUREHALLB2TENDER.pdf
Tender Document • 5.57 MB
127497337.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .