Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹3.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.9 CrRejected-AOC VILLAGE PATHRA POST BADGO THANA KHORABAR DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | ₹3.9 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹3.9 CrRejected-Finance | ₹3.9 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹4.8 CrRejected-Finance | ₹4.8 Cr | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical CHANDAULI | UTTAR PRADESH | 221009 | - | - | Rejected-Technical As Per Uploaded |
| Sl No | Description | Qty | Unit | M/S AJIT CONSTRUCTION AND ORDER SUPPLIER L2 | NIKHIL CONSTRUCTION L1 | M/S PRABHAT TRADERS L3 | M/S PRATAP NIRMAN SANSTHAN L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in filling for strengthning and making counterberm with manual compaction and dressing to profile including cost of all labour, material and T&P, required for proper completion of work. | 1,36,109.15 | M3 | 110 ₹1.5 Cr | 110 ₹1.5 Cr | 138 ₹1.9 Cr | 185 ₹2.5 Cr |
| 2.00 | E/W Excavation in ordinary soil / sandy loam, clay or sand including lift up to 1.50m and lead up to 30 m and including filling, watering, ramming of excavated earth into the trenches or up to the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer- in -Charge up to a distance of 30 m from the foundation trenches. | 516.1 | M3 | 80 ₹41,288 | 84 ₹43,352.40 | 50 ₹25,805 | 70 ₹36,127 |
| 3.00 | Preparation of sub grade before laying of lining excluding cost of earth work. including all cost of labour and T&P etc. required for proper completion of work. | 13,690 | M2 | 15 ₹2.1 L | 15 ₹2.1 L | 5 ₹68,450 | 18 ₹2.5 L |
| 4.00 | Centering and shuttering of CC work in lining including cost of all labour, material and T & P for proper completion of work . | 3,537.12 | M2 | 300 ₹10.6 L | 410 ₹14.5 L | 400 ₹14.1 L | 200 ₹7.1 L |
| 5.00 | Providing and laying of Cement concrete in (1:1.5:3) in sleeper with Coarse sand and crushed aggregate size 4.75 mm to 20 mm grite well graded from dalla quarry including cost of all labour, material and T & P, royalty , Taxes etc. required for proper completion of work . | 516.1 | M3 | 10,000 ₹51.6 L | 9,490 ₹49.0 L | 11,000 ₹56.8 L | 10,000 ₹51.6 L |
| 6.00 | Providing and laying of local sand in filter including cost of all labour, material and T & P, royalty , Taxes for proper completion of work . | 632.65 | M3 | 1,500 ₹9.5 L | 1,480 ₹9.4 L | 800 ₹5.1 L | 700 ₹4.4 L |
| 7.00 | Supplying and laying of LDPE 200 micron film including cost of all labour, material and T & P, required for proper completion of work. | 14,250 | M2 | 30 ₹4.3 L | 30 ₹4.3 L | 40 ₹5.7 L | 35 ₹5.0 L |
| 8.00 | Providing and laying of 75 mm thick lining in canal C.C. Cement concrete (1:1.5:3) with Coarse sand and 4.75 mm to 20 mm size crushed aggregate of hard stone ballast well graded from dalla quarry by paver machine including cost of all labour, material and T & P required for proper completion of work . | 13,614 | M2 | 1,100 ₹1.5 Cr | 940 ₹1.3 Cr | 830 ₹1.1 Cr | 920 ₹1.3 Cr |
| 9.00 | Providing Steel fibre reinforcement including cost of all labour, material and T & P required for proper completion of work . | 10.08 | MT | 55,928 ₹5.6 L | 51,000 ₹5.1 L | 70,000 ₹7.1 L | 67,100 ₹6.8 L |
| 10.00 | Making contraction groove in lined concrete surface as per drawing including painting with sealing primer on joint and filling groove with sealing compound including cost of all labour, material and T&P, required for proper completion of work. | 2,669.98 | R.M. | 100 ₹2.7 L | 100 ₹2.7 L | 100 ₹2.7 L | 970 ₹25.9 L |
Tender Value
₹5.5 Cr
EMD Value
₹10.9 L
Closing Date
13 Feb 2026, 3:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
Earth work for bank strengthning in the Overflow Section and CC lining on the Concave part of the Curved portion between km. 44.600 to 47.800 of Bansi branch.
2026_UPIDC_1112432_1
09/S.E/2025-26
Open Tender
Civil Works
300 days
Bansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,457
₹10.9 L
8 May 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
13 Feb 2026
7 Feb 2026
Earth work in filling for strengthning and making counterberm with manual compaction and dressing to profile including cost of all labour, material and T&P, required for proper completion of work.
E/W Excavation in ordinary soil / sandy loam, clay or sand including lift up to 1.50m and lead up to 30 m and including filling, watering, ramming of excavated earth into the trenches or up to the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer- in -Charge up to a distance of 30 m from the foundation trenches.
Preparation of sub grade before laying of lining excluding cost of earth work. including all cost of labour and T&P etc. required for proper completion of work.
Centering and shuttering of CC work in lining including cost of all labour, material and T & P for proper completion of work .
Providing and laying of Cement concrete in (1:1.5:3) in sleeper with Coarse sand and crushed aggregate size 4.75 mm to 20 mm grite well graded from dalla quarry including cost of all labour, material and T & P, royalty , Taxes etc. required for proper completion of work .
Providing and laying of local sand in filter including cost of all labour, material and T & P, royalty , Taxes for proper completion of work .
Supplying and laying of LDPE 200 micron film including cost of all labour, material and T & P, required for proper completion of work.
Providing and laying of 75 mm thick lining in canal C.C. Cement concrete (1:1.5:3) with Coarse sand and 4.75 mm to 20 mm size crushed aggregate of hard stone ballast well graded from dalla quarry by paver machine including cost of all labour, material and T & P required for proper completion of work .
Providing Steel fibre reinforcement including cost of all labour, material and T & P required for proper completion of work .
Making contraction groove in lined concrete surface as per drawing including painting with sealing primer on joint and filling groove with sealing compound including cost of all labour, material and T&P, required for proper completion of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
Buklet.pdf
Tender Documents • 2.97 MB
BOQ_2057491.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid