Loading…
Loading…
Tender ID
Tender Value
₹72.1 L
EMD Value
₹1.4 L
Closing Date
11 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
WA SECITON
19 conditions · 4 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Advance Correction Slip No.1(Rly. Board letter No.2022/CE-I/CT/GCC-2022/Policy date 14.07.2022.) PLEASE ATTACH COPY OF AUDITED BALANCE SHEET.
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Advance Correction Slip No.1(Rly. Board letter No.2022/CE-I/CT/GCC-2022/Policy date 14.07.2022.) PLEASE ATTACH COPY OF ANNEXURE VI-B.(Proforma is available in document).
1. Similar nature of Work: Any work involving Pre & Post tamping survey work using Gedo trolley system or similar to achieve designed line & level of the track i.e The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.)
70 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
CPWD DSR-2021 (Delhi Schedule of Rates) and CPWD Specifications- 2019 (or latest) shall be used for all works related to Building Works, Road Works and Horticulture works and other Miscellaneous works with effect from 16.01.2023 with latest Correction Slips issued from time to time by CPWD.
Signature on Receipts for Amount.
Every receipt for money which may become payable or for any security which may become transferable to the Contractors under these presents, shall, if signed in the partnership name by anyone of the partners of a Contractor's firm be a good and sufficient discharge to the Railway in respect of the moneys or security purported to be acknowledged thereby and in the event of death of any of the Contractor, partners during the pendency of the contract, it is hereby expressly agreed that every receipt by anyone of the surviving Contractor partners shall if so signed as aforesaid be good and sufficient discharge as aforesaid provided that nothing in this Clause contained shall be deemed to prejudice or effect any claim which the Railway may hereafter have against the legal representative of any Contractor partner so dying for or in respect to any breach of any of the conditions of the contract, provided also that nothing in this clause contained shall be deemed to prejudice or effect the respective rights or obligations of the Contractor partners and of the legal representatives of any deceased contractor partners interse. (GCC April 2022 para 53.)
Applicability of rules for this tender
GCC-April 2022 with upto date correction slip.
CPWD DSR-2018 (Delhi Schedule of Rates) and CPWD Specifications- 2019 (or latest) shall be used for all works related to Building Works, Road Works and Horticulture works and other Miscellaneous works with effect from 01.06.2021 with latest Correction Slips issued from time to time by CPWD.
Relevant IS-CODES AND RAILWAY CODES AND MANUALS.
In these Special Conditions of Contract the following terms shall have the meaning hereby assigned to them except where the context otherwise requires.
(a)"General Condition of Contract" shall mean General Conditions of Contract-April 2022 as contained in Western Railway, Engineering Department "Indian Railways Unified standard specifications (works and materials)Vol-I &II".
"Specifications" shall mean the Specifications for Materials and Works of the Railway as specified under the authority of the Ministry of Railways or Chief Engineer or as amplified, added to or superseded by special specifications if any, appended to the Tender Forms. (GCC April 2022 Part I para I Instructions to tenderers (ITT).)
Standard Schedule of Rates (SSOR) shall mean the schedule of Rates adopted by the Railway, which includes- 1."Unified Standard Schedule of Rates of the Railway (USSOR)" i.e. the Standard Schedule of Rates of the Railway issued under the authority of the Chief Engineer from time to time, updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents; 2. "Delhi Schedule Of Rates (DSR)" i.e. the Standard Schedule of Rates published by Director General/ Central Public Works Department, Government of India, New Delhi, as adopted and modified by the Railway under the authority of the Chief Engineer from time to time, updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents.
"If any dispute arises between the parties with respect to this agreement any application or suit shall be instituted only in the; court with the local limits or whose Jurisdiction, the Western Railway's Divisional Headquarters office is situated and both the parties shall be bound by this clause. (Head quarters letter no. CE-Circular No. 11/No. W/623/5/ARB/1 dt. 26.04.04)
NAGDA-BHOPAL, UJJAIN-DEWAS section - Pre & post tamping track measurement survey using Timble Gedo Vorsys trolley system in the jurisdiction of Divisional Engineer (East) Ratlam
RTM-2025-26-189
RTM-2025-26-189
Open
Works - General
12 Months
Ratlam, Madhya Pradesh
₹0
₹1.4 L
11 Mar 2026
13 Feb 2026
5 items across 1 schedule · ₹72,06,205.69 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | 1/NS - Pre Tamping Measurements (a)Establishments of main GNSS (DGPS Base) Point& reference point establishment at 150 meter maximum interval along the track. | Kilometre | 233.83 | 5,701.38 | 13,33,153.69 |
| 2 | 2/NS - (b)Pre measurement for tamping with total station & prism Gedo trolley measure and store Gauge. Cross elevation,Chainage , shift and lift value at every 3m i.e Every 5th sleeper interval along the track centre line and coordinates of track centre line at every 3m to be submitted with track geometry(per/km/Round) | Kilometre | 233.83 | 9,989.59 | 23,35,865.83 |
| 3 | 3/NS - Construct target/Design alignment with the good points of existing premeasurement profile in design in ALC format with design alignment of measured reading in M/c and to provide track adjustment file with Ver. extension and also to provide Geo Geometry file to provide text file with slew, uplift and gauge at every 3m i.e. every 5th sleeper interval for temping machine operator during reference | Kilometre | 233.83 | 2,568.79 | 6,00,660.17 |
| 4 | 4/NS - "Post Tamping Measurements (a)Post Tamping Measurements with total station & prism Gedo trolley measure and store Gauge. Cross elevation, Chainage, shift and lift value at every 3m i.e Every 5th sleeper interval along the track center line and coordinates of track center line at every 3m to be submitted with track geometry (per/km/Round)" | Kilometre | 233.83 | 9,989.59 | 23,35,865.83 |
| 5 | 5/NS - "Reporting (a)Report & plotting soft and hard copies of slew & uplift report a t every 3m/ 5 m i.e. every 5th sleeper interval compared with design Vs pre profile report of offset distance from track center to OHE, neighboring track center & platform point." | Kilometre | 233.83 | 2,568.79 | 6,00,660.17 |
| Schedule total | ₹72,06,205.69 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
LETTEROFCREDITASMODEOFPAYMENT062018.pdf
Safetyrules.pdf
ProcedureforpaymentofContractorbillasperGSTImplementation_GST_290617.pdf
PROCEDUREORDERFORENSURINGSAFETYATWORKSITE.pdf
NOrelativecertificate.pdf
certificateforrailwayemployeereengagement_1.pdf
TERMINATIONCONTRACT.pdf
ACS5GCC2022.pdf
07.08.23ACS4.pdf
07.08.23LAUNCHEMB.pdf
BidCapacity-AnnexureVI.pdf
OffloadingPartSofworkRBLetterNo2022-CE-I-CT-GCC-2020-Polociydt27Apr2022.pdf
BidsecurityAnnexure-VIA.pdf
FormatforAnnualcontractualturnoverAnnexure-VIB.pdf
GCCAPRIL2022.pdf
MOUFORJVGCCAPRIL22WITHALLACS.pdf
AnnexureVasperACS4dt07.08.2023.pdf
AnnexureVA.pdf
ACS6GCC2022.pdf
ACS2dt13Dec22.pdf
ACS1GCCAPR2022.pdf
ACS3dt26APR23.pdf
LetterNo.2017-CE-I-CT-9date31May2023.pdf
GCC2022CorrectionSlipNo9.pdf
GCC2022CorrectionSlipNo7.pdf
PBGPerformaforTenderdocument30Aug2025.pdf
GCC2022CorrectionSlipNo10.pdf
GCC2022CorrectionSlipNo8.pdf
Recommendedmakermanufacturerofcivilmaterials3.pdf
3PCECircular88forQualityofWorks1.pdf
SpecialConditiongedovorsystrolley.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .