Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹8.4 L
EMD Value
₹16,800
Closing Date
9 Feb 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
ELE/GEN
27 conditions · 13 needing a document upload
Current and valid Electrical & Supervisory License: Bidder/Tenderer should submit valid and current electrical license and Electrical Supervisory license issued from State/Central Govt licensing board for the required voltage level to work at proposed location in tender, Otherwise offer will not be considered for further action and your offer will be summarily rejected. Tenderer has electrical contractor's license for the voltage that is highest in the complete work . (CEGE/ECR/HJP's letter no. ECR/ELE/G/Tender policy/1670 dt 17.02.2022).
PF Code issued from EPFO & UAN No. of workers: Contractor should have to be registered with Employee Provident Fund Organization (EPFO). It is mandatory for contractor to submit PF code provided by EPFO with their tender offer. Also each contractor have to submit "UAN" of their worker with their offer and have to mention in tender document. It is mandatory. Otherwise offer will not be considered for further action and your offer will be summarily rejected.
GCC: The contract shall be governed by Standard General condition of contract: APRIL- 2022 for works contract issued by Railway and amendment/corigendum from time to time from the date of opening and Model SOP for work matter. Bidders/Tenderers are responsible for knowledge of GCC and its amendment. Labour laws to be followed by the contractor including any compensation to the labour for any damage or loss Railway will not be responsible.
Multiple L-1: In case of more than one L-1 bidders, tender may be awarded to tenderer having higher Bid capacity. In case Bid capacity is also same, tenderer having done more value of similar nature work in last three previous years and the current financial yeat up to the date of opening of the tender, may be selected for the award. (Rly Bd's letter no. 2017/Trans/01/Policy dated 08.02.2018).
Care in Submission of Tenders: On IREPS Module, a facility has already been created for online submission of Annexure-V. Therefore, the provision of downloading of Annexure-V of GCC & uploading of physically signed Annexure-V by the tenderer has been discontinued on IREPS as per instruction of Railway board vide Railway board letter no.2022/CE- I/CT/GCC correspondence dated 14/05/2024.
Care in Submission of Tenders: (a) (i)Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer.
Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services Tax Act, 2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified by Central/State Govt.& as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of 5.1.1 Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates. (a)(iii)The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the Contractor. The Contractor shall be responsible for deposition of applicable GST to the concerned authority.
Tenderer Credentials: For tenderer credentials tenderer have to full fill the Para 10 of the Tender Form (Second Sheet) of GCC: April 2022.
Documents to be Submitted Along with Tender: Tenderer should have to follow Para 14 & Para 18 of the Tender Form (Second Sheet) GCC: April 2022.
Documents to be Submitted Along with Tender (i)The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be. (ii)Following documents shall be submitted by the tenderer: (a)Sole Proprietorship Firm: (i)All documents in terms of Para 10 of the Tender Form (Second Sheet) above. (b)HUF: (i)A copy of notarized affidavit on Stamp Paper declaring that he who is submitting the tender on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF. (ii)All other documents in terms of Para 10 of the Tender Form (Second Sheet) above. (c)Partnership Firm: (i)All documents as mentioned in para18 of the Tender Form (Second Sheet). (d)Joint Venture (JV): All documents as mentioned in para 17 of the Tender Form (Second Sheet). (e)Company registered under Companies Act2013: (i)The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company (ii)A copy of Certificate of Incorporation (iii)A copy of Authorization/Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company. (iv)All other documents in terms Para 10 of the Tender Form (Second Sheet) above. (f)LLP (Limited Liability Partnership): (i)A copy of LLP Agreement (ii)A copy of Certificate of Incorporation (iii)A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. (iv)An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract. (v)All other documents in terms of Para 10 of the Tender Form (Second Sheet). (g)Registered Society & Registered Trust: (i)A copy of Certificate of Registration (ii)A copy of Memorandum of Association of Society/Trust Deed (iii)A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the Society/Trust. (iv)A copy of Rules & Regulations of the Society (v)All other documents in terms of Para 10 of the Tender Form (Second Sheet) above.
If it is NOT mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint Venture / Registered Company etc., then the tender shall be treated as having been submitted by the individual who has signed the tender. (iv)After opening of the tender, any document pertaining to the constitution of Sole Proprietorship Firm / Partnership Firm / Registered Company/ Registered Trust / Registered Society / HUF/LLP etc. shall be neither asked nor considered, if submitted. Further, no suo moto cognizance of any document available in public domain (i.e., on internet etc.) or in Railway's record/office files etc. will be taken for consideration of the tender, if no such mention is available in tender offer submitted. (v) A tender from JV shall be considered only where permissible as per the tender conditions. (vi)The Railway will not be bound by any change of power of attorney or in the composition of the firm made subsequent to the submission of tender. Railway may, however, recognize such power of attorney and changes after obtaining proper legal advice, the cost of which will be chargeable to the Contractor. 15.The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected. A separate power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required. Note: A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Appostille certificate. (iii)If it is NOT mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint Venture / Registered Company etc., then the tender shall be treated as having been submitted by the individual who has signed the tender. (vi)After opening of the tender, any document pertaining to the constitution of Sole Proprietorship Firm / Partnership Firm / Registered Company/ Registered Trust / Registered Society / HUF/LLP etc. shall be neither asked nor considered, if submitted. Further, no suo moto cognizance of any document available in public domain (i.e., on internet etc.) or in Railway's record/office files.
Inspection of materials: Tenderer have to ensure before supply of Electrical materials having value either 5 lakh or more should be got inspected by RITES and its specification should be as per latest IS/IEC. Documents regarding RITES inspection will have to enclose with material challan. It is mandatory condition for bill passing.
ANNEXURE-V(A) Reference -Para 6.I of ITP (This certificate is to be given by attorney/authorized signatory/each member of Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF)/Limited Liability Partnership (LLP) etc. I/We............................(Name), attorney/authorized signatory of the ...............(constituent firm/constituent partner) and member/partner of the .....................(tenderering firm) hereby solemnly affirm and state as under: 1. I/ We certify that .............. .. (constituent firm/constituent partner) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Gcvt. of India from participation in tender on the date of subrnission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust. 2. I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. 1/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed), SEAL AND SIGNATURE OF THE CONSTITUENT FIRM/CONSTITUERTT PARTNER Place: ............... Dated: ............... *****************
Annexure -VIB Reference -Para 10.2 & 17.15.2 of Tender Form (Second Sheet) of Annexure I of ITT Each Bidder or each member of a JV must fill in this form separately: NAME OF BIDDER/JV PARTNER: Annual Contractual Turnover Data for the Previous 3/4 Years (Contractual Payment only) YearAmount CurrencyExchange RateIndian National Rupees Equivalent Average Annual Contractual Turnover for last 3 years 1.The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. 2.The information supplied shall be substantiated by data in the audited balance sheets and profit and loss accounts for the relevant years in respect of the bidder or all members constituting the bidder. 3.Contents of this form should be certified by a Chartered Accountant duly supported by Audited Balance Sheet duly certified by the Chartered Accountant. SEAL AND SIGNATURE OF THE BIDDER Certified that all figures and facts submitted in this form have been furnished after full consideration of all observations/notes in Auditor's reports._____________________ (Signature of Chartered Accountant) Name of CA:______________ Registration No: ______________ (Seal)
Penalty for cutting/damaging the Railway cable by firm/contractor/agency(As per HQ Policy No. e-file ECR- HQ0SnT(GENL)41/2020(5954) dated 21/05/2024 and vide issued Chief Telecom Engineer letter No. ECR/S&T/e-File 5954 dated 03/07/2024): (i)Penalty should be levied on the contractor when they work without permission or resort to careless working without making proper arrangements for protecting cables and other utilities. Level of Penalty to be imposed for damages to cable/utilities shall be as under: Cable DamagedPenalty per location (Rs.) Only Quad cable or Signaling cable1.0 Lakh Only OFC1.25 Lakh Both OFC & Quad1.5 Lakh Electrical Cable1.0 Lakh Telecom PIJF Cable0.5 Lakh (ii)Necessary debit in this regard will be raised by the cable/utility owing department on the executing agency undertaking the work, who shall levy and recover the penalty from the defaulting contractor. The executing agency may make necessary provision in the contract to enforce the penalty. (iii)For penalty to be imposed for each cable cut, a joint report should be prepared on the same day at the level of supervisors of executing unit and affected unit. Responsibility of unit to be fixed based on the joint sketch. If supervisor of executing unit refrain from signing of the joint note the DAR action may be initiated by concerned department against the associated supervisor. (iv)The defaulting contractor/agency/unit (on basis of penalty imposed based on joint report) may appeal against the penalty. For this, they may apply to ADRM of the division through proper channel within one month of receiving the penalty notice along with complete documents and detailed justification. ADRM may enquire over the matter and decide on the appeal after consulting all concerned department/documents. In case where defaulting contractor has extended help in restoration, the penalty can be reduced to an extent as deemed fit by ADRM. Decisions taken by ADRM shall be final and also be binding on all parties. (v)In case of cable cut/damage due to miscreant activity or anyone working without permission then an information to be given by divisional Control of affected department of Security Control in division for instant preventive action followed by formal complaint by concerned SSE/JE of affected unit to concerned RPF Post for registration of criminal case. Thereafter, joint report should be prepared on the same day at the level of supervisors of RPF and affected unit (owner unit of asset). Case registered by RPF, being a legal procedure at disposal of the Court, would not be withdrawn.
It is mandatory for contractor to submit PF code provided by EPFO and ESIC certificate with their tender offer. Otherwise offer will not be considered for further action and your offer will be summarily rejected.
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
49 conditions · 8 needing a document upload
PAYMENT (Terms and conditions):- For Electrical works 1. The executed work will be jointly checked by the Electrical supervisor and representative of the contractor. 2. After completion of the work, firm is to undertake guarantees for one year from the date of completion and guarantee certificate should accompany the bill 3. 2% Income Tax will be deducted from the bill. 4. 1% labour cess will be deducted. 5. GST will be applicable as per extent rule on the total value of the work or deduction will be made from the bills in accordance with the GST rules as applicable. 6. Security deposited should be kept for a period of 12 months and will be released after satisfactory performance during the guarantee period. 7. Released materials should be returned to the concerning supervisor and a copy of the receipt should accompany the bill. 8. Indemnity bond should be submitted during on account payment and in case of repair of electrical assets /DG sets. 9. Test certificate of manufacturer/dealers in case of machinery and plants should submit along with the bill. 10. The contractor shall arrange at his own cost all tools, plants facilities necessary for reconditioning and testing of the equipments. 11. The materials mentioned in the tender work schedule should be inspected by the authorized representative of Sr. DEE/G/DNR prior to execution of the work in the premises of manufacturer/authorized dealer and the copy of the inspection report duly signed by contractor/ authorized signatory representative should accompany the bill.
(B) Payment of Bills & deduction to be made from Bill: The executed work will be jointly checked by the Electrical supervisor and representative of the contractor. After completion of the work, firm is to undertake guarantees for one year from the date of completion and guarantee certificate should accompany the bill. In case of LED light fittings, LED lights including Driver etc shall be guaranteed for satisfactory performance and manufacturing defects for a period of 60 months from the date of commissioning or 72 months from the date of supply, whichever is earlier by manufacturer. (Reference: Railway Board's letter no. 2006/Elect (G)/150/5 dated 27.03.2015). 2% Income Tax will be deducted from the bill. 1% labour Cess will be deducted. Any other taxes if imposed during contract period will be deducted. GST as applicable will applied on the total value of the work as per extent rule. Security deposited should be kept for a period of 12 months from the completion of each work or as given in the scope of work and will be released after satisfactory performance during the guarantee period. Released materials should be returned to the concerning supervisor and a copy of the receipt should accompany the bill. In case of AMC and manning work, this may not applicable or condition to be followed as given in scope of work. Indemnity bond should be submitted during on account payment and in case of repair of electrical assets/DG sets. Test certificate of manufacturer/dealers in case of machinery and plants should submit along with the bill. The contractor shall arrange at his own cost all tools, plants facilities necessary for reconditioning and testing of the equipment. The materials mentioned in the tender work schedule should be inspected. by the authorized representative of Sr. DEE/G/DNR prior to execution of the work in the premises of manufacturer/authorized dealer and the copy of the inspection report duly signed by contractor/ authorized signatory representative should accompany the bill.
Variation in Quantity: (1). Individual NS items in contracts shall be operated with variation of plus or minus 25% and payment would be made as per the agreement rate. For this, no finance concurrence would be required. (2). In case an increase in quantity of an individual item by more than 25% of the agreement quantity is considered unavoidable, the same shall be got executed by floating a fresh tender. If floating a fresh tender for operating that item is considered not practicable, quantity of that item may be operated in excess of 125% of the agreement quantity subject to the following conditions. (a) Operation of an item by more than 125% of the agreement quantity needs the approval of an officer of the rank not less S.A. Grade. (i) Quantities operated in excess of 125% but upto 140% of the agreement quantity of the concerned item shall be paid at 98% f the rate awarded for that item in that particular tender. (ii) Quantities operated in excess of 140% but upto 150% of the agreement 1 quantity of the concerned item shall be paid at 96% of the rate awarded for that item in that particular tender. (iii) Variation in quantities of individual items beyond 150% will be prohibited and would be permitted only in exceptional unavoidable circumstances with the concurrence of associated finance and shall be paid at 96% of the rate awarded for that item in that particular taender. (b) The variation in quantities as per the above formula will apply only to the 1.1.1 Individual items of the contract and not on the overall contract value. (c) Execution of quantities beyond 150% of the overall agreemental value should not be permitted and, if found necessary, should be only through fresh tenders or by negotiating with existing contractor, with prior personal concurrence of FA & CAO/FA & CAO (C) and approval of General Manager. (3) In case where decrease is involved during execution of contract: (a)The contract signing authority can decrease the items upto 25% of individual item without finance concurrence. (b) For decrease beyond 25% for individual items or 25% of contract agreement value, the approval of an officer not less than rank of S.A. Grade may be taken, after obtaining 'No Claim Certificate from the contractor and with finance concurrence, giving detailed reasons for each such decrease in the quantities. (c) It should be certified that the work proposed to be reduced will not be required in the same work. (4)The limit for varying quantities for minor value items shall be 100% (as against 25% prescribed for other items). A minor value item for this purpose is defined as an item whose original agreement value is less than 1% of the total original agreement value. (5) No such quantity variation limit shall apply for foundation items. (6)As far as SOR items are concerned, the limit of 25% would apply to the value of SOR schedule as a whole and not on individual SOR items.
12. Payment of running bills: (I) For maintenance and manning work -Payment will be made four times in a year. 100% payment will be made for each completed period/Schedule subject to deduction of security deposit, penalty and damage if any. S.D. will be released with the final bill where material supply is not involved or retained for one year after completion of work (for cost of materials supplied) as security deposit if material supply is involved or as per condition given in the scope of work. (II) In case of supply, installation, testing and commissioning or repairing work following payment procedure will be adopted:- (i). 85% payments will be made against supply of materials. (ii). 100% on account payment shall be made to the contractor on against supply of the materials in which the erection part is not included or there is separate rate schedule for erection. (Material supplied will be in good condition as per specification and make with production of material inspection certificate and delivery challan. (III) 100% payment will be made for against full execution of any rate schedule item either supply and erection or erection on submission of certificate by site engineer that installation has been completed. (If 85% payment was made earlier against supply, balance 15% will be paid after erection in case of supply and erection. (IV) 1.) In case of major items such as Lift or escalator 90% on account payment will be made only after successful supply, installation, testing and commissioning of above equipment. 2). 50% payment will be done against supply of material only. Balance 40% payment will be released after erection, testing and commissioning of the Lift or escalator. 3). Balance 10% will be released with final bill only. (V) Firm has to submit the monthly payment statement to the labour/skilled/un-skilled manpower engaged to execute the work indicating their UAN number, ESIC no, PF contribution before raising any bill as uploaded on EPFO website. Without these details the bill will not be passed. 13. Material Challan from manufacturer/dealer should be submitted along with the bill. 14. Tenderers should quote their own labour and materials against schedule of items of works which should provide for supply of all materials tools and plants and other equipments whatsoever including all handling, freight lead to the site of work and tax thereon. 15. The quantities are approximately for the purpose of tender only payment will be made for actual quantity of work done. 16. Any damages caused to buildings or any other assets belonging to Railway administration during the period of works shall be made good the contractor to the extant determined by the Administration failing which the administration will be entitle to realize such cost from the contractor in any manner decided by. 17. No claim will be entertained for any fluctuation of market rate in respects of labour and materials. 18. No passes will be issued against this contract and tenderer is supposed to work in the whole jurisdiction of the Sr. Divisional Electrical Engineer(G) at their own cost. 19. The contractor must pay fair wages to their labour in keeping with the minimum wages issued by Chief Labour Commissioner from time to time. 20. The contract will be governed by the General Condition of contract and standard specification 1969 edition as amended. NOTE: (1) Rate mentioned in the para no. 3, 4, 5 are liable to change. These will be changed
The following documents should be specified for submission along with tender:
A. List of Personnel, Organization available on hand and proposed to be engaged for the subject work.
B. List of plant Machinery available on hand own and proposed to be inducted own hired to be given separately for the subject work.
C. List of Works completed in the last three financial years giving description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work, Date of actual start, actual completion and final value of contract should also be given.
D. List of works on hand indicating description of work, contract value, and approximate value of balance work yet to be done and date of award.
The bidders are instructed to submit documents related with 2.4.1 GSTIN, PAN and Mandate form/Cancelled cheque issued from any bank.
The tenderers whether sole proprietor, a limited company or a partnership firm he/they should submit authentic proof in terms of partnership deed, proprietorship documents etc. along with the tender. If he/they want to act through agent or individual partners should submit a power of attorney duly stamped and authenticated by Notary Public or by Magistrate in favour of specific person whether he/she/they are partners of the firm or any other person specifically authorizing him/her name to submit the tender, sign the agreement, receive money, witness measurements, sign measurement books compromise, settie, relinquish any claims, preferred by firm and also sign No Claim Certificate and refer all or any disputes arbitration.
(i) The bidiler/tender(s) shall be eligibile only if /they fulfill Eligibility Criteria of having received total contract amount during the last three financial years and in the current financial year with a minimum of 150% of the advertised tender value from works done in Government sector. (ii) Authentic certificates shall be produces by the tenderer(s) to this effect which may be self-attested with stamp certificate from the employer/client, Audited Balance sheet reflecting financial turnover certified by the Chartered Accountant with her stamp, signature and membership number shall be considered
Contractor should have to be registered with Employee Provident Fund Organization (EPFO). It is mandatory for contractor to submit PF code provided by EPFO with their tender offer. Also each contractor have to submit "UAN" of their worker with their offer and have to mention in tender document. It is mandatory. Otherwise offer will not be considered for further action and your offer will be summarily rejected. You are also instructed to submit monthly payment challan to the person/labour engaged for execution of the work having valid UAN no with bill. This is to be followed strictly as per GCC & as per instruction of labour enforcement officer under Govt of India.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Inclusion of 'Letter of Credit' as Mode of Payment in Works Tenders or Service Tenders as per Railway Board's letter no. 2018/CE-I/CT/9 dated 04.06.2016 remarks from Tenderer required.
Eligibility criteria for works tender in respect of partnership firms:-
in case the tenderer is a partnership firm s , the experience, solvency and turn over shall be in the name and style of the firm only.
If the tenderer is a partnership firm, all the partners shall be jointly and severally liable for successful completion of the work and no request for change on the certification of the firm shall be entertained.
During the currency of the contract, no partner of the firm shall be permitted to withdraw from partnership business and in such and event it shall be treated as breach of trust and abandonment of the contract.
JOINT VENTURE will not be permitted for the tenders.
Any Conditional offer will be summarily rejected.
For those conditions for which standard formats have been given in the uploaded document titled-Formats for uploading of various format. The information should only be submitted in these standard formats.
Rates are inclusive of all taxes/GST, license fee, royalty charges etc. legally leviable by State, Central Govt. and/or any other local authority.
Earnest Money and Tender Document Cost: -All the tenderers / Contractors have to deposit full earnest money and tender document cost as stipulated in the tender document through online modes as permitted in IREPS application.
Railway Administration reserves the right to change/Alter/Cancel the tender without any notice.
No manual tender/offer sent by post/fax/courier/in person shall be accepted. No post tender correspondence shall be entertained after closing the tender even suo moto post tender letters of the tenderes shall be treated as null/void.
The tender are required to observe the website to find out if any correction slip issued subsequent to uploading of the tender. Railway reserve the right to make any additions /alteration to the tender uploaded and issue corrigendum to the same effect. In case the tenderer fails to make notice of the above corrigendum, additions and alterations enterd/effected in the corrigendum shall be biding upon the tender and no claim what so ever will be entertained by railway.
The Railway reserves the right to very all the statement, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information evidence and documents as may be necessary for such verification. Any such verification all lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities here under not will it affect any rights of the Railways thereunder.
In case of any wrong information submitted by the tenderer, the contract shall be terminated, earnest money deposit (EMD). performance guarantee (PG) and Security deposit (SD) of the contract forfeited and agency barred for doing business on entire Indian Railways for five years.
The tender should upload the documents carefully. The documents uploaded by tenders should be clearly visible and in legible format. The tenderer should submit format of certificate as per Annexure-V enclosed in tender document.
The list of personnel/organization on hand and proposed to be engaged for the tender work. Similarly list of plant and machinery available on hand and proposed to be inducted and hired for the tendered work.
Please submit your bank details i.e Name of Bank along with Bank Branch Code, Accounts number as appearing in the cheque book, IFSC code and PAN number, duly certified by the authorized official of the bank, to facilitate payment through ECS/NEFT/RTGS. In lieu of the Bank certificate photocopy/scanned copy of a cancelled cheque and Pan card may be attached for verification of the above particulars. Otherwise, the tender will be summarily rejected.
The tenderer has to upload the supportive documents against the 'Type of Firms' as mentioned below: 'Sole Proprietorship Firm: Notarized affidavit claiming the firm to be a sole proprietor firm 'Company: MOA, AOA, Power of attorney' Partnership Firm: Deed of Partnership, Power of attorney and an Undertaking for not being Blacklisted/Debarred as per Annexure-A: otherwise the offer of the tenderer will be summarily rejected.
The tenderer has to upload GST registration certificate.
Electrical/G works related to rennovation of Officers Rest House, Danapur.
EL-50-DNR-OPEN-39-2025-26~ECR
EL-50-DNR-OPEN-39-2025-26
Open
Works - General
150 Days
Patna, Bihar
₹0
₹16,800
9 Feb 2026
13 Jan 2026
26 Jan 2026
5 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 8,40,057.68 | ||
| — | 414.16 | — | — | ||
| Laying of the cable partly through trench at a depth of one meter and filling with suitable cushioning materials or under the road by laying through G.I. pipe at a depth of one meter or at platform/road/wall where excavation of one meter is not possible only cutting of the surface to the size of cable with at lest two inch covering by concrete is required and refilling with earth and partly of the rail/lamp post/PF color/wall with supply of clamp made of MS flat 35x6 mm with nut- bolts adequate number with maximum space of one meter/wherever feasible etc including connection as per site condition of different sizes of cables. For laying each cable separate trench is required. In case due to space constraints more than one cable is required to lay in one trench, payment will be released in form of length of trench and not in length of underground cable. (Cable/GI pipe will be supplied by Railway from separate item). | — | — | — | 50,941.68 | |
| — | 1.00 | — | — | ||
| Supply, installation, testing & commissioning of cubicle type LT panel suitable for 415V, 3 Phase, 4 Wire 50 Hz Ac supply system, fabricated with CRCA sheet steel of 1.6mm thick for frame work and covers, 2mm thick for gland, plates i/c cleaning & finishing complete with 7 tank process for powder coating in approved shade, having suitable Amp capacity extensible type TPN bus bars of high conductivity, DMC/SMC bus bar supports. entire panel shall have a common copper earth bar of size 25mm x 5mm at the rear with 2 Nos. earth stud, solid connections from main bus bar to switch gears with required size of Copper bus bars i/c providing following switch gears Incomer - 800A, Four Pole ACB, (Breaking capacity: Icw = Ics = Icu = 50 kA for 1 sec), MDO with MTX 1.5G, having Overload, Short-circuit & instantaneous protection with adjustable current & time delay settings, In-built neutral & earth fault protection, current metering through O-LED display, local fault annunciation through LED indication & pre-trip alarm - 1 No, 3 Phase LED Voltmeter, Cl 1 (50 - 520 Vac) - 1 Nos 3 Phase LED Ammeter, Cl 1 - 1 Nos. CT Class 1 (800/5) - 3 Nos Voltmeter Selector Switch (VSS) - 1 No, Ammeter Selector Switch (ASS) - 1 No, RYB LED indicating Lamp - 1 Set On-off Indicating lamp - 1 Set 2A, 10 kA SP MCB for Protection - 4 Nos TPN Copper bus bars of minimum of 800Amps capacity 800A, 4Pole On-load Changeover switch (Manual)- 01 No Outgoing: 1) MCCB: 400A 4Pole, (TM), 36kA breaking capacity (Ics=100% Icu), with with factory made Silver plated Copper spreading links & Rotary handle - 3 Nos. 2) MCCB: 250A 4Pole,(TM), 25kA breaking capacity (Ics=100% Icu), with with factory made Silver plated Copper spreading links & Rotary handle - 1 No 3) MCCB: 200A 4Pole, (TM), 25kA breaking capacity (Ics=100% Icu), with with factory made Silver plated Copper spreading links & Rotary handle - 3 Nos. 4) MCCB: 100A 4Pole, (TM), 25kA breaking capacity (Ics=100% Icu), with factory made Silver plated Copper spreading links & Rotary handle - 6 Nos. All MCCBs should have variable thermal setting of 80-100% for overload protection. Make of all switchgear items L&T, ABB, Schneider, Siemens, CGL, Alstom. | — | — | — | 7,89,116 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .