Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.9 LAccepted-AOC | ₹93.9 L | L1 | Accepted-AOC L1 1ST LOWEST RATE QUOTED |
| 2 | L2₹1.0 Cr+₹7.8 L (8.32%)Rejected-AOC KANTAMAL POST KANTAMAL POLICE STATION KANTAMAL DISTRICT BOUDH PIN 762017 | BOUDH | ODISHA | 762017 | ₹1.0 Cr+₹7.8 L (8.32%) | L2 | Rejected-AOC L2 2ND LOWEST RATE QUOTED |
| 3 | L3₹1.1 Cr+₹11.7 L (12.5%)Rejected-AOC | ₹1.1 Cr+₹11.7 L (12.5%) | L3 | Rejected-AOC L3 3RD LOWEST RATE QUOTED |
| 4 | L4₹1.1 Cr+₹13.4 L (14.3%)Rejected-AOC | ₹1.1 Cr+₹13.4 L (14.3%) | L4 | Rejected-AOC L4 4TH LOWEST RATE QUOTED |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
5 Jun 2026, 5:00 pmClosed
Managing Director, SERIFED
Secretary SERIFED, Assistant Engineer Civil, Accounts In-Charge, Junior Engineer Civil, Office Assistant Engg. Cell
Construction of the building for Accommodation of the CSB unit at OSSRTI Mancheswar Bhubaneswar
2026_SERIF_129782_1
VI-14(01)/SERIFED/2026-27/716
Open Tender
Civil Works - Buildings
Percentage
547 days
Mancheswar Bhubaneswar
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
₹1.3 L
Yes
24 Jun 2026
26 May 2026
6 Jun 2026
26 May 2026
5 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1GROUND FLOOR | |||||
| 2 | Providing of dismantaling of existing corridor wall for entrance by side staircase with machine including shifting of debrises by transport vehicles as directed by the Engineer-in-charge. | 155.65 | Cum | 375 | ₹58,368.75 |
| 3 | Earth work in ordinary soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles as directed by the Engineer-in-charge. | 86.15 | Cum | 269.7 | ₹23,234.66 |
| 4 | Filling Foundation and plinth with sand including cost, conveyance, royality etc complete as directed by the Engineer-in-charge. | 93.79 | Cum | 638.34 | ₹59,869.91 |
| 5 | Cement concrete with C.C ( 1:4:8) with 40 mm size metal including cost, conveyance, royality etc complete as directed by the Engineer-in-charge. | 22.07 | Cum | 5,422.24 | ₹1,19,668.84 |
| 6 | Brick work withFly ash bricks 25 cm x 12 cmx8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance +8 percent in cement mortar (1:6) in foundation including cost, conveyance, royality etc complete as direction by EIC. | 19.94 | Cum | 5,426.65 | ₹1,08,207.4 |
| 7 | Brick work withFly ash bricks 25 cm x 12 cmx8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance +8 percent in cement mortar (1:6) in Superstructure including cost, conveyance, royality etc complete as direction by EIC. | 37.1 | Cum | 5,590.3 | ₹2,07,400.13 |
| 8R.C.C. work M-20 grade with 20mm and down grade black hard granite crusher broken stone chips including hoisting and laying with Centering & shuttering as direction of EIC. | |||||
| 8.01 | Footing (M20) | 12.39 | Cum | 9,335.38 | ₹1,15,665.36 |
| 8.02 | Column (M20) | 6.49 | Cum | 16,035.01 | ₹1,04,067.21 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
DTCNCSBUNIT.pdf
Tender Documents • 4.79 MB
BOQ_592569.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .