Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.3 LAccepted-AOC WARD NO 1 CHHAJU PURAM COLONY RAILWAY ROAD MOHINDERGARH 123029 | MAHENDRAGARH | HARYANA | 123029 | ₹41.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹45.6 LRejected-Finance | ₹45.6 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Praveen Construction L1 | SURENDER KUMAR CONT L2 |
|---|---|---|---|---|---|
| 1.00N.S. Item EI Works | |||||
| 2.00 | S/E of 1.5 ton split AC (Voltas/ Blue star/ Lloyed) including cost of M.S. stand , Stablizer,and 9 ft copper pipe and all other patty material required to complete the job in all respect. | 1 | Each | 32,670 ₹32,670 | 36,300 ₹36,300 |
| 3.00 | Supply of cable complete with necessary conections supply of 16 sq mm 4 core armaured cable | 50 | per mtr | 134 ₹6,700 | 149 ₹7,450 |
| 4.00 | S/E of 45 watt LED street light fitting, potted driver, toughened glass and aluminium dia cast body (Philips/ Bajaj/ Crompton/ Wipro/ Havells/ Halonix/ Surya) make including making necessary connetions. | 4 | Each | 2,223 ₹8,892 | 2,470 ₹9,880 |
| 5.00 | Supply of 20 Watt LED Tube Light Fitting (Philips/ Bajaj/Wipro/Surya/Hevells/Helonix) Complete all respect. | 20 | Each | 188 ₹3,760 | 209 ₹4,180 |
| 6.00 | S/E of R.O. 25 L.P.H.. (Livpure ,Kent,Aquaguard) make including making necessery connections and all patty material required to complete the job in all respect. | 1 | Each | 28,710 ₹28,710 | 31,900 ₹31,900 |
Tender Value
₹46.6 L
EMD Value
₹1.3 L
Closing Date
21 Jul 2025, 2:00 pmClosed
SHYAM
XEN Zila Parishad Ch. Dadri
CONSTRUCTION OF SUB HEALTH CENTER AT VILLAGE SANTOR
2025_HRY_458411_1
202588D19A74 432E 4F3E 9BE2 880D5C37FCF82166DEV
Open Tender
Civil Works
250 days
SANTOR
Construction of Sub-Health Center at Village Santor Block Charkhi Dadri.
3 documents required · 3 mandatory
₹5,000
₹1.3 L
Yes
27 Mar 2026
14 Jul 2025
21 Jul 2025
14 Jul 2025
21 Jul 2025
14 Jul 2025
Amount
N.S. Item EI Works
S/E of 1.5 ton split AC (Voltas/ Blue star/ Lloyed) including cost of M.S. stand , Stablizer,and 9 ft copper pipe and all other patty material required to complete the job in all respect.
Supply of cable complete with necessary conections supply of 16 sq mm 4 core armaured cable
S/E of 45 watt LED street light fitting, potted driver, toughened glass and aluminium dia cast body (Philips/ Bajaj/ Crompton/ Wipro/ Havells/ Halonix/ Surya) make including making necessary connetions.
Supply of 20 Watt LED Tube Light Fitting (Philips/ Bajaj/Wipro/Surya/Hevells/Helonix) Complete all respect.
S/E of R.O. 25 L.P.H.. (Livpure ,Kent,Aquaguard) make including making necessery connections and all patty material required to complete the job in all respect.
Bidder Name
Amount
Praveen Construction (GSTN-NA) BID ID -1299987
SURENDER KUMAR CONT (GSTN-NA) BID ID -1300005
SURENDER KUMAR CONT (BID ID -1300005)
SURENDER KUMAR CONT (BID ID -1300005)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_536119.xls
BOQ • 0.30 MB
AD0108330.pdf
Additional Documents • 0.90 MB
Download all tender documents and submit your bid