Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC 44 621708 | PERAMBALUR | TAMIL NADU | 621708 | ₹17.8 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹19.4 LRejected-AOC | ₹19.4 L | L2 | Rejected-AOC Highest Amount Quoted |
| Sl No | Description | Qty | Unit | KATHIRAVAN R L1 | RAJENDIRAN P S L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc., Complete | 631.8 | sqm | 6 ₹3,790.80 | 10 ₹6,318 |
| 2.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water | 78.97 | cum | 142 ₹11,213.74 | 150 ₹11,845.50 |
| 3.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | 0.71 | cum | 4,791 ₹3,401.61 | 5,125 ₹3,638.75 |
| 4.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 4,296.25 | sqm | 33 ₹1.4 L | 35 ₹1.5 L |
| 5.00 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH | 107.41 | cum | 11,373 ₹12.2 L | 12,500 ₹13.4 L |
| 6.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction KM 0/0-1/000 | 120 | cum | 838 ₹1.0 L | 900 ₹1.1 L |
| 7.00 | KM 0/0-1/140 | 16.8 | cum | 838 ₹14,078.40 | 900 ₹15,120 |
| 8.00 | Towards cost and supply of HM & km stone in all charges Provision for HM Stone | 4 | Nos | 780 ₹3,120 | 800 ₹3,200 |
| 9.00 | Provision for KM Stone | 1 | Nos | 2,730 ₹2,730 | 2,750 ₹2,750 |
| 10.00 | Provision for Name Board Charges | 1 | Nos | 2,000 ₹2,000 | 2,000 ₹2,000 |
Updated dates
Tender Value
₹17.8 L
EMD Value
₹18,000
Closing Date
3 Nov 2025, 3:00 pmClosed
Block Development office Veppur
Panchayat Union Office Veppur
Renewal BT Road From Karambiyam AD Colony to Karambiyam Road at Periymmapalayam Panchayat
2025_RDTN_614235_1
3037/2025/A6 Date 03-10-2025
Open Tender
Civil Works - Roads
Block Development office Veppur
As per Tender Document
2 documents required · 2 mandatory
₹0
₹18,000
Yes
22 Jan 2026
15 Oct 2025
3 Nov 2025
15 Oct 2025
3 Nov 2025
15 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Part.pdf
Tender Documents • 0.22 MB
BOQ_733913.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid