Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-AOC | L1 | Accepted-AOC Lowest amount Quoted tenderer | |
| 2 | L2₹1.0 L+₹390.58 (0.39%)Rejected-AOC | L2 | Rejected-AOC Highest amount Quoted tenderer | |
| 3 | L3₹1.1 L+₹13,086.20 (12.9%)Rejected-AOC | L3 | Rejected-AOC Highest amount Quoted tenderer | |
| 4 | L4₹1.2 L+₹16,725.32 (16.5%)Rejected-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | L4 | Rejected-AOC Highest amount Quoted tenderer | |
| 5 | L4₹1.2 L+₹16,725.32 (16.5%)Rejected-AOC | L4 | Rejected-AOC Highest amount Quoted tenderer |
| Sl No | Description | Qty | Unit | V KRISHNAMOORTHY L1 | VAITHYANATHAN K L4 | P KUMAR L4 | C.DINESH L3 | SAMPATH R L2 | Thulasi L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Charges for conducting geophysical survey | 1 | Nos | 1,716 ₹1,716 | 2,000 ₹2,000 | 2,000 ₹2,000 | 2,000 ₹2,000 | 1,700 ₹1,700 Lowest | 2,060 ₹2,060 |
| 2.00 | Drilling of 150 mm dia borewell hard rock area to any depth including labour charges for inserting casing pipe assembly in the drilled hole including transporting charges for the rig and supporting vehicles from one place | 55 | Cum | 815 ₹44,825 | 950 ₹52,250 | 950 ₹52,250 | 900 ₹49,500 | 800 ₹44,000 Lowest | 979 ₹53,845 |
| 3.00 | 150mm OD PVC plain casing pipe(CS) | 18 | Rm | 592 ₹10,656 Lowest | 690 ₹12,420 | 690 ₹12,420 | 680 ₹12,240 | 600 ₹10,800 | 711 ₹12,798 |
| 4.00 | Supply and delivery of India mark II deep borewell handpump with 30m connecting rods, cylinders and telescopic stands | 1 | Rm | 16,760 ₹16,760 Lowest | 19,534 ₹19,534 | 19,534 ₹19,534 | 19,400 ₹19,400 | 18,000 ₹18,000 | 20,120 ₹20,120 |
| 5.00 | Supply and delivery of 32mm GI pipe | 10 | Nos | 251 ₹2,510 | 292 ₹2,920 | 292 ₹2,920 | 290 ₹2,900 | 240 ₹2,400 Lowest | 301 ₹3,010 |
| 6.00 | Supply and delivery of 32mm GI coupling | 9 | Nos | 56 ₹504 Lowest | 65 ₹585 | 65 ₹585 | 65 ₹585 | 57 ₹513 | 67 ₹603 |
| 7.00 | Erection charges for India mark II hand pump | 1 | Nos | 1,252 ₹1,252 | 1,459 ₹1,459 | 1,459 ₹1,459 | 1,459 ₹1,459 | 1,240 ₹1,240 Lowest | 1,503 ₹1,503 |
| 8.00 | Construction of Handpump plotform including cost of materials and labour charges etc complete | 1 | Nos | 4,161 ₹4,161 | 4,850 ₹4,850 | 4,850 ₹4,850 | 4,850 ₹4,850 | 4,122 ₹4,122 Lowest | 4,996 ₹4,996 |
| 9.00 | Construction of Handpump Soakpit including cost of materials and labour charges | 1 | Nos | 3,260 ₹3,260 | 3,800 ₹3,800 | 3,800 ₹3,800 | 3,800 ₹3,800 | 3,200 ₹3,200 Lowest | 3,914 ₹3,914 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 15,415.92 ₹15,415.92 Lowest | 17,967.24 ₹17,967.24 | 17,967.24 ₹17,967.24 | 17,412.12 ₹17,412.12 | 15,475.5 ₹15,475.5 | 18,512.82 ₹18,512.82 |
Tender Value
₹1.2 L
EMD Value
₹1,200
Closing Date
12 Feb 2026, 3:00 pmClosed
Block Development Officer(VP),Madhuranthagam Block
Block Development Office, Madhuranthagam Block
Providing New Hand Pump Chitravadi Colony BG Street at Avrimedu Panchayat in Madhuranthagam Block under (Basic Amenities of SC Habitations) PMAGY Scheme for the year 2025-26
2026_RDTN_651421_1
Rc.No.2597/2025/A9 Dated 28.01.2026
Open Tender
Civil Works - Water Works
Item Rate
90 days
Gallimedu School street
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,200
Yes
13 Mar 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
Charges for conducting geophysical survey
Drilling of 150 mm dia borewell hard rock area to any depth including labour charges for inserting casing pipe assembly in the drilled hole including transporting charges for the rig and supporting vehicles from one place
150mm OD PVC plain casing pipe(CS)
Supply and delivery of India mark II deep borewell handpump with 30m connecting rods, cylinders and telescopic stands
Supply and delivery of 32mm GI pipe
Supply and delivery of 32mm GI coupling
Erection charges for India mark II hand pump
Construction of Handpump plotform including cost of materials and labour charges etc complete
Construction of Handpump Soakpit including cost of materials and labour charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_781146.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_781146.xls
BOQ • 0.31 MB
Technical.pdf
Tender Documents • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .