| 1.01 | Decomissinging of indoor units of existing fitted 7 TR High Precision Package AC units with Single compressor i/c dismantling the same with related MS stand, accessories like canvas, damper, cable tray as directed by Engineer-in-charge etc. complete as required. (T.E. Bldg. Brahampuri) | 2 | Nos | 8,000 ₹9,440 Lowest |
| 1.02 | Decomissinging of outdoor units (Condenser) of existing fitted 7 TR High Precision Package AC units with Single compressor i/c dismantling the same with related MS stand, accessories as directed by Engineer-in-charge etc. complete as required. (T.E. Bldg. Brahampuri) | 2 | Nos | 8,000 ₹9,440 Lowest |
| 1.03 | Dismantling & removing the existing laid Power/Control cables of Package units, condenser units up to 4 Core x 25 Sqmm complete by unscrewing from the related M.S. racks/tray as directed by Engineer-in-charge etc. complete as required. (T.E. Bldg. Brahampuri) | 60 | Mtrs | 3,000 ₹3,540 Lowest |
| 1.04 | Recovering the existing laid refrigerant copper piping of Hot gas & liquid gas of different sizes complete by cutting/unscrewing/opening etc. fitted in between the Package unit & condenser units as directed by Engineer-in-charge etc. complete as required. (T.E. Bldg. Brahampur) (a) 1 1/8" OD (28.5 mm) Single run | 30 | Mtrs | 2,400 ₹2,832 Lowest |
| 1.05 | (b) 7/8" OD (22.2 mm) Single run | 30 | Mtrs | 1,800 ₹2,124 Lowest |
| 1.06 | Providing & fixing of partition / RA Boxing fabricated out of 50 x 25 x 16 SWG MS Square pipes & 11 mm thick MDF particle board i/c P/F access door, hinges, locking bolts, grid work shall be of maximum size of 1200 mm x 600 mm i/c cutting welding grouting P/F fasteners / screws / washer i/c primer painting & 2 cots of approved shade of synthetic enamel paints etc. complete as required. (T.E. Bldg. Brahampur) | 30 | Sqmtr | 54,000 ₹63,720 Lowest |
| 1.07 | Shifting of 2 Nos. 7 TR High Precision AC Package indoor from 3rd Floor & outdoor from roof of T.E. Bldg. along with connected useful copper pipes, ducting, canvass damper, cables, cable trays from T.E. Bldg. Brahampuri to MSC-II, 2nd Floor & OFC-II, 3rd Floor T.E. Bldg. Shastri Nagar by means of mechanical transport and using heavy labaur and special tools like cranes, ropes, lever i/c loading and unloading etc. complete as required. (T.E. Bldg. Shastri Nagar) | 1 | Job | 25,000 ₹29,500 Lowest |
| 1.08 | Dismantling of worn out / scrapped 7 AC Package alongwith outdoor units, connected ducting cables, cable trays drain pipes copper piping and stacking the same at desired place in T.E. Bldg. premises from 3rd Floor to Ground Floor by using special tools like heaving labour, crane, ropes levers etc. complete as required. (OFC-II, 3rd Floor Shastri Nagar) | 2 | Nos. | 12,000 ₹14,160 Lowest |
| 1.09 | Installation, testing and commissioning of above 7 TR HPAC Package (Shifted from T.E. Brahampuri to OFC-II, 3rd Floor Pakg AC & MSC-II, 2nd Floor at OFC-II 3rd Floor) indoor and outdoor units on existing MS frame i/c fixing of S/A damper, canvas connection of electrical cables, nitrogen pressure testing, vacuemising then supplying and charging 10 Kg. refrigerant R-22/R-407C in the circuit as per terms and condition complete as required. (T.E. Bldg. Shastri Nagar) Note : a) Indoor and outdoor units shall be installed on AVM pads. b) Existing stands shall be used for installation with necessary modification, concrete block shall be covered on edges with 25 mm x 25 mm x 3 mm MS angle. c) Drain pipe shall be connected with existing drain connection | 2 | Nos. | 72,000 ₹84,960 Lowest |
| 1.10 | Laying of following sizes of existing recovered copper refrigerant pipeing on the existing MS perforated tray i/c P/F new fitting such as sockets, elbows, tees, brazing, cutting, clamping etc. complete as required. (T.E. Bldg. Shastri Nagar) (a) 1 1/8" OD (28.5 mm) Single run | 30 | Mtrs | 27,000 ₹31,860 Lowest |
Tender Value
₹3.4 L
EMD Value
₹6,772
Closing Date
27 Feb 2026, 1:30 pmClosed
Executive Enginner (E)
BSNL, Electrical Division, GPO Compound, Meerut
Shifting of 2 x 7 TR High Precision Air Cooled AC Package units from T.E. Bldg. Brahampuri to (MSC-II and OFC-II Room) at T.E. Bldg. Shastri Nagar Meerut.
2026_BSNL_899025_1
49/NIT/EE(E)/BSNL/ED/MT/25-26
Open Tender
Miscellaneous Works
Item Rate
60 days
Meerut
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
Accounts Officer Cash, B.S.N.L., O/o GMTD, Meerut
₹6,772
10 Mar 2026
17 Feb 2026
28 Feb 2026
17 Feb 2026
27 Feb 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Decomissinging of indoor units of existing fitted 7 TR High Precision Package AC units with Single compressor i/c dismantling the same with related MS stand, accessories like canvas, damper, cable tray as directed by Engineer-in-charge etc. complete as required. (T.E. Bldg. Brahampuri) | 2 | Nos | - | - |
| 1.02 | Decomissinging of outdoor units (Condenser) of existing fitted 7 TR High Precision Package AC units with Single compressor i/c dismantling the same with related MS stand, accessories as directed by Engineer-in-charge etc. complete as required. (T.E. Bldg. Brahampuri) | 2 | Nos | - | - |
| 1.03 | Dismantling & removing the existing laid Power/Control cables of Package units, condenser units up to 4 Core x 25 Sqmm complete by unscrewing from the related M.S. racks/tray as directed by Engineer-in-charge etc. complete as required. (T.E. Bldg. Brahampuri) | 60 | Mtrs | - | - |
| 1.04 | Recovering the existing laid refrigerant copper piping of Hot gas & liquid gas of different sizes complete by cutting/unscrewing/opening etc. fitted in between the Package unit & condenser units as directed by Engineer-in-charge etc. complete as required. (T.E. Bldg. Brahampur) (a) 1 1/8" OD (28.5 mm) Single run | 30 | Mtrs | - | - |
| 1.05 | (b) 7/8" OD (22.2 mm) Single run | 30 | Mtrs | - | - |
| 1.06 | Providing & fixing of partition / RA Boxing fabricated out of 50 x 25 x 16 SWG MS Square pipes & 11 mm thick MDF particle board i/c P/F access door, hinges, locking bolts, grid work shall be of maximum size of 1200 mm x 600 mm i/c cutting welding grouting P/F fasteners / screws / washer i/c primer painting & 2 cots of approved shade of synthetic enamel paints etc. complete as required. (T.E. Bldg. Brahampur) | 30 | Sqmtr | - | - |
| 1.07 | Shifting of 2 Nos. 7 TR High Precision AC Package indoor from 3rd Floor & outdoor from roof of T.E. Bldg. along with connected useful copper pipes, ducting, canvass damper, cables, cable trays from T.E. Bldg. Brahampuri to MSC-II, 2nd Floor & OFC-II, 3rd Floor T.E. Bldg. Shastri Nagar by means of mechanical transport and using heavy labaur and special tools like cranes, ropes, lever i/c loading and unloading etc. complete as required. (T.E. Bldg. Shastri Nagar) | 1 | Job | - | - |
| 1.08 | Dismantling of worn out / scrapped 7 AC Package alongwith outdoor units, connected ducting cables, cable trays drain pipes copper piping and stacking the same at desired place in T.E. Bldg. premises from 3rd Floor to Ground Floor by using special tools like heaving labour, crane, ropes levers etc. complete as required. (OFC-II, 3rd Floor Shastri Nagar) | 2 | Nos. | - | - |
| 1.09 | Installation, testing and commissioning of above 7 TR HPAC Package (Shifted from T.E. Brahampuri to OFC-II, 3rd Floor Pakg AC & MSC-II, 2nd Floor at OFC-II 3rd Floor) indoor and outdoor units on existing MS frame i/c fixing of S/A damper, canvas connection of electrical cables, nitrogen pressure testing, vacuemising then supplying and charging 10 Kg. refrigerant R-22/R-407C in the circuit as per terms and condition complete as required. (T.E. Bldg. Shastri Nagar) Note : a) Indoor and outdoor units shall be installed on AVM pads. b) Existing stands shall be used for installation with necessary modification, concrete block shall be covered on edges with 25 mm x 25 mm x 3 mm MS angle. c) Drain pipe shall be connected with existing drain connection | 2 | Nos. | - | - |
| 1.1 | Laying of following sizes of existing recovered copper refrigerant pipeing on the existing MS perforated tray i/c P/F new fitting such as sockets, elbows, tees, brazing, cutting, clamping etc. complete as required. (T.E. Bldg. Shastri Nagar) (a) 1 1/8" OD (28.5 mm) Single run | 30 | Mtrs | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_944973.xls
BOQ • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .