| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-AOC NO 164 HARERAM NAGAR RAJAJIIPURAM TVLR 602 001 | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 602001 | ₹25.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹25.8 LRejected-AOC NO 99 A VILAPAKKAM ROAD ARUMBAKKAM VILLAGE MANNAVEDU POST TIRUVALLUR DISTRICT 602 021 | ARUMBAKKAM | TIRUVALLUR | TAMIL NADU | 602021 | ₹25.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/S. ABL CONSTRUCTIONS L2 | M/S.J M Constructions L1 |
|---|---|---|---|---|---|
| 1.00Providing BT road at DRDA campus road Km 0/0 - 0/5 at Collectorate. | |||||
| 2.00Clearing and Grubbing Road Land Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete. | |||||
| 3.00 | 0/250- 0/500 | 300 | sqm | 8.5 ₹2,550 | 6.2 ₹1,860 |
| 4.00Earthwork for shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Using Borrow pit Earth) | |||||
| 5.00 | Km 250- 0/500 | 101.25 | cum | 145.5 ₹14,731.88 | 140.1 ₹14,185.13 |
| 12.00WET MIX MACADAM Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 225mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 13.00 | Km 250- 0/500 | 94.06 | cum | 3,220 ₹3.0 L | 3,198.8 ₹3.0 L |
| 14.00PRIMER COAT Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete | |||||
| 15.00 | Km 250- 0/500 | 752.5 | sqm | 88 ₹66,220 | 85.5 ₹64,338.75 |
| 16.00TACK COAT 3.0 KG Applying TACK COAT over Primed WMM surface at 3.0 Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete | |||||
Tender Value
₹25.7 L
EMD Value
₹26,000
Closing Date
17 Feb 2026, 3:00 pmClosed
Project Director
DRDA, Tiruvallur
Providing BT road at DRDA Office campus road Tiruvallur pac 02
2026_RDTN_654652_1
0621/2026/A7 Dt.10.02.2026
Open Tender
Civil Works
90 days
Tiruvallur
as per eligible criteria
5 documents required · 5 mandatory
₹0
₹26,000
Yes
3 Jun 2026
11 Feb 2026
17 Feb 2026
11 Feb 2026
17 Feb 2026
11 Feb 2026
Providing BT road at DRDA campus road Km 0/0 - 0/5 at Collectorate.
Clearing and Grubbing Road Land Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete.
Earthwork for shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Using Borrow pit Earth)
WET MIX MACADAM Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 225mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
PRIMER COAT Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete
TACK COAT 3.0 KG Applying TACK COAT over Primed WMM surface at 3.0 Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
BITUMINOUS MACADAM Providing and laying 50mm Compacted thick Bituminous macadam using 0.20cum of 26.50-13.2mm,0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
TACK COAT 2.50 KG Applying TACK COAT over Primed WMM surface at 2.50 Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
BITUMINOUS CONCRETE Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providinng RCC humepipes NP3 Class 300mm dia cost and conveyanceing charges sor 25-26 pg 66-vol-ii
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tech_bid__IGFF_2026-27_TLR02.pdf
Tender Documents • 0.71 MB
PRICE_BID_IGFF_2026-27_TLR02.pdf
Additional Documents • 0.26 MB
BOQ_784958.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid