Loading…
Loading…
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
2 Sept 2026, 10:00 am
Executive Engineer
HPPWD DIVISION KOTKHAI
C/o Sub-Tehsil Building at Kalbog, Tehsil Kotkhai, Distt. Shimla, H.P. C/o, Building portion, W.S. and S.I. rainwater harvesting tank and site development etc.
2026_PWD_141740_1
PW-KD-E-Tender/2026-27-2940-45 dtd 7-8-2026
Open Tender
Civil Works - Buildings
Percentage
365 days
Kotkhai
Please refer Tender documents.
12 documents required · 12 mandatory
₹5,000
₹2.4 L
22 Aug 2026
22 Aug 2026
2 Sept 2026
22 Aug 2026
2 Sept 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in hilly Area by mechanical in all height and depth in all kind of soil including, saturated soils comprosing of mixed siol, ordinary rock and hard rock and all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side, water pollution etc and to protect stability of hill side, the track shall be excavated with chiselling and wedging out of rock (where blasting is prohibited). All Earth work in cutting/ excavation, including rock excavation shall be carried out true to lines, grades , side slopes, width, camber, super-elevation and level as shown on the drawings or as directed by the Engineer-in-charge, in connformity with the requirement of MORD 2014 technical specification for Rural Road, Clause 302, 1603.1, 1603.2 and section 300, 1600, 2100 General conditions for contract to achive designed formation width including hauling and stacking of materail useful for construction at suitable sites and safe disposal of surplus debri to approved dumping sites arranged by the contractor in specified dimensions or as dircted by the Engineer-in-charge for smooth riding. The Recovery for stone, whether useful or not for nill cubic metershall be made in all case at the rate of rupee 300/ only (rupees three hundred only) per cubic meter shall be efffected on pro-rata basis. Any loss to the public and private property during the course of excavation shall be absolute responsibility of the contractors, which shall compensated by him in all case. | 76.23 | Per cubic metre | 182.6 | ₹13,919.6 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m.All kinds of soil as per H.P.PWD.spesification 1990 volume - I,as per direction of Engineer - charge including carriage of materials through all modes of transpostion with in all leads and lifts of materials and other incidentails. The rates includies octrio, royality , malkhana, toll tax, sale tax/GST an other taxes imposed by the Goverment. | - | Per cubic metre | 244.8 | - |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete as per H.P.PWD.spesification 1990 volume - I,as per direction of Engineer - charge including carriage of materials through all modes of transpostion with in all leads and lifts of materials and other incidentails. The rates includies octrio, royality , malkhana, toll tax, sale tax/GST an other taxes imposed by the Goverment. | 6.43 | Per cubic metre | 2,304.7 | ₹14,819.22 |
| 4 | Boulder filling tightly hand packed under floor including watering, ramming, consolidating etc. complete including carriage of material in all leads and lifts as per H.P.PWD.spesification 1990 volume - I,as per direction of Engineer - charge including carriage of materials through all modes of transpostion with in all leads and lifts of materials and other incidentails. The rates includies octrio, royality , malkhana, toll tax, sale tax/GST an other taxes imposed by the Goverment. | 9.6 | Per cubic metre | 1,420.1 | ₹13,632.96 |
| 5 | Providing form work with steel plates 3.15 (Three point One Five ) millimeters thick welded with angle iron in frame 30*30*5 (Thirty into Thirty into Five) millimeters, so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden/steel battens and ballies in all heights of propping and centering below supporting floor to ceiling and removal of the same in-situ-reinforced concrete and plain concrete work in:-ing carriage of all labour equipments and materials to various location through all modes of transportation within all leads, lifts and other incidental charges in:Foundation footing and basis of columns, etc. and mass concrete as per H.P.PWD. spesification 1990 volume - I,as per direction of Engineer - charge including carriage of materials through all modes of transpostion with in all leads and lifts of materials and other incidentails. The rates includies octrio, royality , malkhana, toll tax, sale tax/GST an other taxes imposed by the Goverment. | 60.9 | Per square metre | 255.7 | ₹15,572.13 |
| 5.01 | Providing form work with steel plates 3.15 (Three point One Five ) millimeters thick welded with angle iron in frame 30*30*5 (Thirty into Thirty into Five) millimeters, so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden/steel battens and ballies in all heights of propping and centering below supporting floor to ceiling and removal of the same in-situ-reinforced concrete and plain concrete work in:-ing carriage of all labour equipments and materials to various location through all modes of transportation within all leads, lifts and other incidental charges in:Suspended floors, roofs, landings, balconies and access platform as per H.P.PWD. spesification 1990 volume - I,as per direction of Engineer - charge including carriage of materials through all modes of transpostion with in all leads and lifts of materials and other incidentails. The rates includies octrio, royality , malkhana, toll tax, sale tax/GST an other taxes imposed by the Goverment. | - | Per square metre | 634.3 | - |
| 5.02 | Providing form work with steel plates 3.15 (Three point One Five ) millimeters thick welded with angle iron in frame 30*30*5 (Thirty into Thirty into Five) millimeters, so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden/steel battens and ballies in all heights of propping and centering below supporting floor to ceiling and removal of the same in-situ-reinforced concrete and plain concrete work in:-ing carriage of all labour equipments and materials to various location through all modes of transportation within all leads, lifts and other incidental charges in:Columns, Pillars, Piers, Abutments, Posts and Struts Stairs, (excluding landings) except spiral staircases as per H.P.PWD. spesification 1990 volume - I,as per direction of Engineer - charge including carriage of materials through all modes of transpostion with in all leads and lifts of materials and other incidentails. The rates includies octrio, royality , malkhana, toll tax, sale tax/GST an other taxes imposed by the Goverment. | 171.89 | Per square metre | 523.9 | ₹90,053.17 |
| 5.03 | Providing form work with steel plates 3.15 (Three point One Five ) millimeters thick welded with angle iron in frame 30*30*5 (Thirty into Thirty into Five) millimeters, so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden/steel battens and ballies in all heights of propping and centering below supporting floor to ceiling and removal of the same in-situ-reinforced concrete and plain concrete work in:-ing carriage of all labour equipments and materials to various location through all modes of transportation within all leads, lifts and other incidental charges in: Starirs,(excludings landings) except spiral staircases as per H.P.PWD. spesification 1990 volume - I,as per direction of Engineer - charge including carriage of materials through all modes of transpostion with in all leads and lifts of materials and other incidentails. The rates includies octrio, royality , malkhana, toll tax, sale tax/GST an other taxes imposed by the Goverment. | 47.17 | Per square metre | 572.1 | ₹26,985.96 |
| 5.04 | Providing form work with steel plates 3.15 (Three point One Five ) millimeters thick welded with angle iron in frame 30*30*5 (Thirty into Thirty into Five) millimeters, so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden/steel battens and ballies in all heights of propping and centering below supporting floor to ceiling and removal of the same in-situ-reinforced concrete and plain concrete work in:-ing carriage of all labour equipments and materials to various location through all modes of transportation within all leads, lifts and other incidental charges in: Lintels, beams, plinth beams, girders, bressumers and cantilevers as per H.P.PWD. spesification 1990 volume - I,as per direction of Engineer - charge including carriage of materials through all modes of transpostion with in all leads and lifts of materials and other incidentails. The rates includies octrio, royality , malkhana, toll tax, sale tax/GST an other taxes imposed by the Goverment. | 313.73 | Per square metre | 507.5 | ₹1,59,217.98 |
| 5.05 | Providing form work with steel plates 3.15 (Three point One Five ) millimeters thick welded with angle iron in frame 30*30*5 (Thirty into Thirty into Five) millimeters, so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden/steel battens and ballies in all heights of propping and centering below supporting floor to ceiling and removal of the same in-situ-reinforced concrete and plain concrete work in:-ing carriage of all labour equipments and materials to various location through all modes of transportation within all leads, lifts and other incidental charges in: Edges of slabs and break in floors and walls :-Under 20cm wide:- as per H.P.PWD. spesification 1990 volume - I,as per direction of Engineer - charge including carriage of materials through all modes of transpostion with in all leads and lifts of materials and other incidentails. The rates includies octrio, royality , malkhana, toll tax, sale tax/GST an other taxes imposed by the Goverment. | - | per metre | 163.8 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
2222.pdf
Tender Documents • 1.69 MB
BOQ_210474.xls
BOQ • 1.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].