| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC VILLAGE IMLAVADA FATEHPUR SIKARI KIRAWALI AGRA | AGRA | AGRA | ₹1.9 Cr | L1 | Accepted-AOC Preparation Bond for Rs. 19072629.56 Only |
| 2 | L2₹2.0 CrRejected-Finance 95 MARUTI CITY SHAMSHABAD ROAD AGRA | AGRA | UTTAR PRADESH | ₹2.0 Cr | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | Rejected-Technical 37A 99 1 MADHU NAGAR GWALIOR ROAD AGRA | AGRA | - | - | Rejected-Technical Technical Bid Non responsive |
| 4 | Rejected-Technical GARHI NAGAR SAHI AGRA | AGRA | UTTAR PRADESH | 282001 | - | - | Rejected-Technical Technical Bid Non responsive |
| 5 | Rejected-Technical 33 73 LATAKUNJ AJMER ROAD BALUGANJ AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | - | - | Rejected-Technical Technical Bid Non responsive |
Tender Value
₹2 Cr
EMD Value
₹12 L
Closing Date
26 Feb 2026, 12:00 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Widening and strengthening work of Rajpura to Garsan Road in Distt Agra
2026_CEAGR_1118158_1
604/14M-AC/2025-26 dated 30-01-2026
Open Tender
Civil Works
365 days
Agra
Widening and strengthening work
2 documents required · 2 mandatory
₹2,360
₹12 L
Yes
Agra
17 Apr 2026
19 Feb 2026
26 Feb 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
21 Feb 2026
Scarifying existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lift and leads upto 1000 m as per Technical Specification Clause 305.4.3 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) as per SOR Ch-5, Sr.No.-24
Excavation for road work in soil with hydraulic excavatorof 0.90 cum bucket capacity including cutting and loading tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankmentlocation within all lifts and leads upto 1000m. As per MORT&H specification no. 301 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) as per SOR Ch-5, Sr.No.-22
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.6 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) As per 3.19
Construction of Embankment with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) As per 3.16 (Carted Earth)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) As per 3.18 (Carted Earth)
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 complete as per direction of E-in-C. Including all taxes but excluding GST. as per 4.01 (401)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) as per 4.14 (406)
Providing & applying Primer Coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spreading primer at the rate of 0.70 Kg./Sqm. Using machanical means. Before Applying prime coat, the surface will be cleaned with Mechanical broom and water will also be sprinkled with water tanker to keep the surface Moist. The Prime coat will be applied 24 hrsbefore the application of bituminous course including all Taxes, Material, Labour, T&P etc required for proper completion of the work. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) as per 5.01 (501)
Providing and laying dense graded bituminous macadam with 120 TPH HMP producing an average output of 55 tonnes per hour using crushed aggregates of specified grading-II, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) as per 5.04 (505)
Providing and applying tack coat with bitumen VG-10 using Bitumen Pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) as per 5.02 (503)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading-II, premixed with bituminous binder VG-30 @ 5.40% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of un-reinforced, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, Tie rod debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Earthwork in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.SI No- 12.1 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) as per SOR ch-06, Sr.No.-01
Providing and laying cement concrete in 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) as per SOR ch-06, Sr.No.-03
(Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work As DSR per SI 6.1.1 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Laying 350 mm dia NP-3 pipe RCC concrete pipe for culvert on first class in single row including fixing socket with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2900. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) as per SOR ch-05, Sr.No.-10 a.
Laying 600 mm dia NP-3 pipe RCC concrete pipe for culvert on first class in single row including fixing socket with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2900. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) as per SOR ch-05, Sr.No.-10 b.
Pointing with cement mortar (1:3) on brickwork in substructure as per drawing and technical specification Clauses 1300 & 2200 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) as per SOR ch-06, Sr.No.-19.
Plain Cement Concrete (PCC Grade M20) in sub-structure complete as per Drawing and Technical Specifications. Clause 1500, 1700 & 2100 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) as per SOR ch-06, Sr.No.-12.
Plastering with cement mortar 1:3 on brick work in complete as per drawing and Technical Specifications Clauses 1300 & 2200 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) as per SOR ch-06, Sr.No.-20.
Maintenance Charge including @ All Items total work amount etc as per Direction of E/I for the period of Five Years from the actual completion of work. Including royalty on materials. GST shall be paid extra as applicable at the time of payment.
Maintenance of First Year (@0.00% of Total Work Amount of item 1 to 20)
Maintenance of Second Year (@ 0.25% of Total Work Amount of item 1 to 20)
Maintenance of Third Year (@ 0.50% of Total Work Amount of item 1 to 20)
Maintenance of Fourth Year (@ 0.75% of Total Work Amount of item 1 to 20)
Maintenance of Fifth Year (@ 1% of Total Work Amount of item 1 to 20)
Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable 2- Labour cess @ 1% will be deducted from contractor's bill at the time of payment 3- Maintenance will be calculated on value of actual work done.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_2078217.pdf
BOQ Comparative Chart
xlsx
finsummary_2078217.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
T2_Rajpura_Gardan.pdf
Tender Documents • 4.27 MB
BOQ_2078217.xls
BOQ • 0.30 MB