| 1 | L1₹74.5 LAccepted-AOC | ₹74.5 L Quoted ₹75.4 L | L1 | Accepted-AOC Tender Approved by Commissioner, HRCE, Chennai. |
| 2 | L2₹78.9 L+₹3.5 L (4.63%)Rejected-AOC | ₹78.9 L+₹3.5 L (4.63%) | L2 | Rejected-AOC Tender Rejeced by Commissioner, HRCE, Chennai. |
Tender Value
₹71.7 L
EMD Value
₹46,000
Closing Date
3 Dec 2024, 3:00 pmClosed
Hereditary Trustee, AM Kottai Mariamman Temple.
ARULMIGU KOTTAI MARIAMMAN TEMPLE, DINDIGUL TOWN, DINDIGUL WEST TALUK, DINDIGUL DISTRICT.
PROVIDING ORNAMENTAL WORKS IN COLUMNS AND PROVIDING SALAHARAM OVER FRONT MANDAPAMS IN ARULMIGU KOTTAI MARIAMMAN TEMPLE, DINDIGUL TOWN, DINDIGUL WEST TALUK, DINDIGUL DISTRICT.
2024_HRCE_498318_1
001/2024/KottaiMariamman
Open Tender
Civil Works - Others
Lump-sum
180 days
AM Kottai Mariamman Temple, Dindigul Town
1. Bidder must be an Hindu Religious Person. 2. Bidder shound not against the Temple and HRCE Department.
6 documents required · 6 mandatory
₹0
₹46,000
Yes
8 Mar 2025
5 Nov 2024
3 Dec 2024
5 Nov 2024
3 Dec 2024
5 Nov 2024
5 Nov 2024 - 20 Nov 2024
Amount
Dismantling Reinforced Cement Concrete including all labour charges and tools and plants required etc., complete
Dismantling Brick/Stone Masonryin cement mortar including all labour charges and tools required etc., complete
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456:2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 3250 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).
Above Basement
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Curved Centering - Kodungai
With Strutting
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
For Plinth Slab
Brick work in CM 1:5 using country bricks of size 8 3/4" x 4 1/4" x 2 3/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc., complete complying with standard specifiction.
Brick masonry CM 1:4 using Stock bricks including all varivargams, mould sthambams, mukapathrams, koodu, Nasi and all ornamental brick work complete, all pancharams, Agarais, Karnakoodu, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for
Vimanam - 15 Feet Height Excluding Kalkaram
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Cement Mortar1:4 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with CM1:4 and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area.
Vimanam - 15 Feet Height
Plastering with Cement Mortar 1:5 (One Cement and Five Plastering Sand), 12 mm thick in all floors including curing etc., complete complying with standard specification and as directed by the departmental officers.
Special Ceiling Plastering for R.C.C. Slab, beam and sunshades with Cement Mortar 1:3, 10 mm thick including cost and conveyance of all materials and labour charges, curing etc., complete complying with standard specifications.
Painting with multicolour (Panchavarnam) good emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
Providing new sudhai vigrahams in the vimanams and Rajagopurams with Galvanised Iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in CM 1:3 finishing the same with CM 1:3 bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder)
Sudhai size above 6' 6" to 7' 6"
Sudhai size above 2' 6" upto 3' 6"
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood plank for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft.
15 feet height
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including through scrapping, cleaan removal of dirt and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
PRADEEPKUMAR M (BID ID -1198406)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_592143.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .