Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
14 Sept 2024, 5:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Aerospace Division, Bangalore
HINDUSTAN AERONAUTICS LIMITED Bangalore Complex Aerospace Division
INSOURCING OF CNC MACHINING ACTIVITIES
9336
INSRQ-69/T1
Works
Bangalore Complex- Aerospace Divn
₹0
Exempted
14 Sept 2024
22 Aug 2024
22 Aug 2024
14 Sept 2024
TECHNICAL COMPLIANCE STATEMENT (TECHNICAL BID STAGE)
INSOURCING OF PRODUCTION CNC ACTIVITIES AT AEROSPACE DIVISION-HAL(BC) Tender No INSRQ-69/T1
To be filled and uploaded by the BIDDER
Sl No Conditions in BID/ Requirements Compliance Yes/No Details of Relevant Documents attached
Prebid Discussion Meeting is arranged on 4.9.24 ,10.am at HAL aerospace Division to understand the scope of work in detail before submitting the quote.
A Compliance to SCOPE OF WORK TO all line items provided in the price Bid AND Annexure 1,2 ,3 & 4
B SCOPE OF WORK
The firm has to carry out the following activities for execution of work:
1) Collection of work order, component drawings, manufacturing sketches, process sheets, technical instruction sheets, NC programs from shop supervisor.
2) Cleaning of machine bed for loading the raw material and preparing the clamping elements.
3) Loading the part on machine table, truing and clamping the part as per the NC program file instruction for carrying out the machining operation.
4) Fixing the datum for the part as per the NC set up sheet.
5) Loading and unloading of cutting tools to machine as per the NC set up sheet.
6) Establishing tool offsets as per the NC set sheet.
7) Collection and return of cutting tools from tool crib/ shop supervisor as per the existing practice.
8) Carrying out various set ups as per NC set up sheet.
9) Loading and unloading the part as per operation sketch.
10) Clamping and unclamping of job as per the operation sketch.
11) The helper has to remove the chips from the working zone &put the chips in the designated binsin all shifts being operated.
12) In process measurement of dimensions. Measurement to be carried out only with calibrated instruments supplied by HAL and recorded in the log book. The supervisor has to certify the measured dimensions.
13) Recording of daily status and quantum of work completed in the log book on shift basis. It must contain the part no/name, work order number, program number, work instructions etc.
14) Laisoning with CNC programming department for program verification.
15) Carrying out first off proving operations as per the instruction of CNC programmer or CNC shop in-charge.
16) The rings require stress relieving from 2 days-21 days between rough machining and finish machining based on the type. Firm has to note down the details like date of off-loading after rough machining and start of finish machining in the log book.
17) The fitter has to carryout stage deburring, final deburring & vibro operations for all parts. Final deburring should be taken up immediately after finish machining. Maintaining traceability of parts, in entire manufacturing cycle.
18) Cleaning and proper handling of the part after all operations.
19) Carry out strict supervision of all the machining activities to ensure no process violations. The supervisor of the firm should continuously interact with CNC shop supervisors. Wherever machine set-up readings are needed to be recorded the same should be done as per the instructions.
20) It is the responsibility of the firm to maintain the log book of each machine.
21) The firm has to co-ordinate for movement of the completed parts, test pieces along with documents to HAL-QC.
22) Obtain certificate of acceptance from HAL-QC and submit the same along with invoice to shop In-charge for certification.
23) Any re-work identified during final inspection at HAL-QC, should be immediately carried out and re-offered to HAL-QC.
24) Up keeping of machine and surroundings to be kept clean.
25) Effective supervision shall be ensured by the firm with qualified supervisor who has to ensure proper supervision during machining. Minimum one supervisor (over and above machine operators/fitters/helpers) is mandatory for effective execution of order in throughout the operating shifts (i,e 1st, 2nd& 3rd shift). Offer/proposal will not be considered for evaluation if supervisory activities are not considered.
26) The firm has to complete the assigned job within the stipulated time. A delay of 15 days attributable to the vendor beyond the defined timeline for any activity shall be considered as a failure to meet the production requirement and the same will lower the performance rating. (Refer clause 14 of Terms and Conditions).
27) The qualification required for manpower deployed for running CNC machines should be Diploma (Mechanical/Production) with minimum two year of relevant experience or ITI machinist with 4years of relevant experience. Personnel having equivalent qualifications with varying experience can be considered at the sole discretion of HAL and preference shall be given to personnel possessing Diploma. Vendor to submit all certificates w.r.t personnel qualification and experience. Manpower deployed by the firm will be given training by HAL (basic training for approx. 2 weeks), and after training, evaluation and practical test will be conducted for personnel engaged by firm. Personnel who are qualified in the test only will be allowed to operate the machine. Payment shall be made only on the accepted parts as per the payment terms. The firm shall ensure that there is continuity of trained operators throughout the contract period to avoid gap of trained manpower in case of any attrition in the supplied trained manpower.
28) If any of the operators leave the job, the new operator has to be trained by the supervisor of the firm.
29) Quote to be submitted for each line item and the same will be firm and fixed.
30) Safety accessories required for wearing during operations are to be arranged by the firm mandatorily.
31) Each line item in a particular group has similarity of operations involved. Each line item in the particular group has approximately the same machining hours. The price quoted should be same for each line item in a particular group.
32) HAL-ASD will have the flexibility to load components based on the priority within the group.
33) In case of any future requirement, repeat order will be proposed within a year of last supply of component.
34) Raw material size at the time of issuing may vary a little based on availability at HAL-ASD. Firm should execute the P.O. without any additional cost.
35) The indicated rings mentioned for machining are from ring forging generally. Quoted price against each line item is to be considered for machining of one ring forging.
C Terms & Conditions
1) The entire machining activities should be carried out as per the instructions of CNC shop supervisors. The loading plan will be provided and the firm has to realise the components as per the plan.
2) HAL-ASD will provide all the technical inputs like component drawings, manufacturing sketches, process sheets, technical instruction sheets, NC programs for realisation of components. All the documents are property of HAL-ASD and shall be kept in proper place without any damage and shall not be copied or taken out of HAL- ASD premises.
3) HAL-ASD will provide the raw material, cutting tools, clamps, machining fixtures, calibrated inspection equipment & gauges, deburring tools, facilities in operational condition, handling equipment and consumables like coolant, cotton waste, emery sheets, compressed air, power etc. The machine calibration and maintenance will be in the scope of HAL-ASD. The firm should keep the clamps, machining fixtures, deburring tools, calibrated inspection equipment & gauges properly.
4) HAL-ASD will provide the facilities for movement of materials and tools.
5) The firm shall arrange the manpower and provide all logistics support to its manpower for execution of the work at HAL-ASD. The firm shall compulsorily depute qualified operators for running the available machines on a minimum two shift basis (2 operators per machine), one supervisor, one fitter for deburring the machined components and one helper for cleaning &removal of chips from the machine. The details of manpower along with their qualification and experience (fitter/Operator, and supervisors etc.) to be provided while submitting the quotation.
6) HAL-ASD will ensure yearly uptime of up to 85% for the machines over the contract period. The firm has to fully utilise the available machine hours for producing parts. The firm has to operate the machines in minimum 2 shifts and should aim for operating the machines in 3 shifts for maximum output.
7) Firm has to ensure no loss of machine hours for want of stage deburring.
8) The firm has to meet the production requirements of HAL-ASD.
9) The quantity mentioned against each line item of the purchase order may vary for machining based on the production requirement; however, it will not exceed the total quantity of that group and the total amount of work will not cross the total order value. The firm has to comply.
10) The firm should position the operators based on availability of machines within a week.
11) The persons deployed by the firm should work in regular shifts (8 hrs. shifts i.e., 7.00 am to 3pm, 3pm to 11.00 pm& 11.00 pm to 7.00 am) as per the requirement.
12) The competent authority of the office of the HAL-ASD reserves the right to award contract to any successful firm(s) at its discretion and this will be binding on the bidding firms.
13) In case the firm is having/had any previous experience of executing similar jobs (positioning of personnel for Technical/ Production activities), the evidence of such experience to be provided with full details along with the quotation.
14) The order will be for two years from the date of release. The performance of the firm wills be evaluated on a quarterly basis. In case of poor performance or any other reasons, HAL-ASD reserves the right to short close the order by giving one month notice without assigning any reasons. On satisfactory completion of the order, the order will be amended for future requirements on mutual agreement of both the parties. Since the project is of National importance, any delay or lapse in execution of the contract will be viewed seriously.
15) The firm has to provide police verification certificate for the persons to be positioned for the job before deployment in HAL-ASD.
16) The persons engaged by the firm shall be subjected to security check by HAL-ASD security. The management reserves the right to ask the firm to dispense with the services of any person engaged by him, if he is reported to be of doubtful integrity / any other reasons.
17) The firm shall be held responsible for any loss or damage caused to HAL-ASD property due to the negligence of the personnel engaged by him. The cost of such damage as decided by the management shall be paid by the firm or recovered from the amounts payable to the firm.
18) All the safety accessories like safety shoes, hand gloves and helmet etc, required for wearing during machining operation should be arranged by the firm mandatorily.
19) HAL-ASD is not responsible for any type of injury/ loss of life caused to his personnel deputed for work; it is the sole responsibility of vendor to supervise the job and will be responsible for the safety. Vendor shall indemnify HAL for any loss of life causality or injury to his personnel or any loss or damage to the property of HAL.
20) The decision of the Officer-in-charge is final with regard to the satisfactory performance of the contract and any matter arising out of that is binding on the firm as decided by HAL-ASD.
21) It shall be the sole responsibility of the contractor to settle the dispute if any, arising out of engagement between himself and the personnel engaged by him and the management of HAL shall not in any way be responsible, in the event, the personnel approach the competent authority, under any Act of law in the court. The entire expenses in this regard shall be borne by the firm.
22) Any dispute arises during the contract, the arbitration will be in “Arbitration & Conciliation Centre, Bangalore (Domestic & International)
23) The firm should pay minimum wages for respective category and firm shall remit all the statutory payments like ESI & PF for personnel engaged and should enclose a proof of remittance of ESI & PF challan along with the bill for each personnel deputed. If the firm fails to pay payments like ESI and PF etc, HAL reserves the right to short close the P.O. without assigning any reasons.
24) The contractor shall comply with all the requirements of labour laws.
25) If required as per the stipulations under the Contract Labour (Regulation Act) Act-1970, the firm shall obtain and furnish valid registration certificate / License issued by the Assistant Labour commission- central within 30 days of issue of acceptance letter.
26) The personnel of the firm shall not be the employees of HAL and they shall not claim from HAL, any salary or allowances, compensation, damages or anything arising out of their deployment/duty under this Contract. The firm shall make them known about this position in writing before deployment under this contract.
27) HAL shall not be under any obligation for providing employment to any personnel of the firm after expiry of the Purchase order. HAL does not recognize any employee employers’ relationship with any of the workers of the firm engaged in HAL.
28) The Purchase Order is terminable without any compensation to the firm for the breach of contract for any of the terms and conditions herein contained or otherwise stipulated in the tender documents / agreement.
29) The quotation will be evaluated on a totality basis. The firm has to quote a unit price group wise i.e., price of each item in the group must be same.
30) In case there is an upward revision in the applicable rate of tax (GST) post submission of bid, the contractor shall submit a copy of the relevant statute/notification evidencing change of applicable rates for claiming payment from HAL as per revised GST rates. Similarly, if there is downward revision of applicable tax rate post submission of bid, the benefit of lower tax liability shall be passed on to HAL.
31) The contract is not a manpower supply contract. Mere positioning of manpower will not entitle the firm for any kind of payment. Payment will be based on successful completion and acceptance of each line item by HAL-QC only.
32) All the payments terms are fixed and final.
33) The selected bidder must have liaison office in Bangalore for better co-ordination.
34) In the event of any dispute or ambiguity or difference relating to the interpretation and application of the provisions of this contract terms & conditions, Scope of works, and any other terms, solely lies with HAL.
35) The firm shall produce user certificate for similar work carried out. If the firm has executed similar work in HAL, the user department feedback will be considered for selection/rejection during technical evaluation stage. The decision solely lies with HAL.
1) 100% of payment only after successful clearance of parts from HAL-QC.
2) The Invoice should contain the applicable Tax. Payment will be released within 30 Days of submission of clear invoice, certified by officer-in charge.
D STATUTORY REQUIREMENTS
1) Contractor shall comply with Statutory Acts applicable for the personnel deployed at ASD-HAL, such as Factories Act, Workmen Compensation Act, Minimum wages Act, ESI, PF, insurance and other statutory requirements laid down by the Govt. Authorities.
2) The Contractor shall indemnify HAL with Indemnity Bond against any claim/ liability arising out of these Statutory Acts.
3) Minimum Wages: The minimum wages paid to the personnel deployed under this contract shall comply with the wages notified by the Chief Labour Commissioner (Central) from time to time. Contractor shall consider the probable changes/ increase in wages for the entire contract period while quoting. No additional claim will be entertained in this regard.
4) HAL will not be liable and does not have any binding for any injuries/ death causing due to accident while carrying out the Maintenance activities.
5) It will be the Contractor’s responsibility of making good any loss or damage to HAL Property while execution of contract. The decision of HAL on the cause of damage and quantum of liability to be borne by contractor will be final & binding on the contractor.
6) The contractor shall thoroughly check the credentials of personnel before deployment. In case, any personnel found indulging in any activity against law, the contractor will be liable for action.
7) Contractor shall ensure that the personnel deployed under this contract are thoroughly screened for their antecedents before deputing to HAL-ASD. In case, they are found indulging in anti-national activity, Contractor shall be liable for prosecution as per law.
8) All the personnel deployed by the Contractor shall be of age above 18 years & below 60 years.
9) HAL will not be responsible for any minor /major accidents or fatalities of any personnel occurred due to the negligence or inadequate knowledge of personnel deployed under the contract. It is the whole and sole responsibility of the Contractor whatsoever the reasons may be.
10) In the event of loss of life or injury to personnel during execution of this contract, HAL has no liability whatsoever.
HINDUSTAN AERONAUTICS LIMITED BANGALORE COMPLEX AEROSPACE DIVISION
Tender No:INSRQ-69/T1 INSOURCING AT AEROSPACE DIVISION-HAL(BC)
PRICE BID VENDOR TO QUOTE IN THIS SHEET ONLY. PRICE QUOTED ANYWHERE OTHER THAN THIS SHEET SHALL MAKE THE BID LIABLE FOR REJECTION
BIDDER COMPANY NAME & Address
Bidder Offer No. & Date
Sl.No. Part No Part Description SCOPE OF WORK Quantity Unit of Measurement Unit Cost per No. (in Rs) Excl. GST Total Cost in Rs REMARKS
1 RC-INS-GROUP-ACNC-RING-E INS-HEAVY MILL & TURN SCOPE OF WORK: 18 NOS
MACHINING OF COMPONENTS FOR GROUP-A,
REFER ANNEXURE-I FOR DETAILED SCOPE OF WORK.
2 RC-INS-GROUP-BCNC-RING-E INS- TURN & DRILL SCOPE OF WORK: 32 NOS
MACHINING OF COMPONENTS FOR GROUP-B,
REFER ANNEXURE-I FOR DETAILED SCOPE OF WORK.
3 RC-INS-GROUP-CCNC-RING-E INS- LIGHT MILL,TURN & DRILL SCOPE OF WORK: 11 NOS
MACHINING OF COMPONENTS FOR GROUP-C,
REFER ANNEXURE-I FOR DETAILED SCOPE OF WORK.
4 RC-INS-GROUP-DCNC-RING-E INS- MEDIUM MILL,TURN & DRILL SCOPE OF WORK: 27 NOS
MACHINING OF COMPONENTS FOR GROUP-D,
REFER ANNEXURE-I FOR DETAILED SCOPE OF WORK.
5 RC-INS-GROUP-ECNC-RING-E INS- 2-3MTR,TURN & DRILL SCOPE OF WORK: 14 NOS
MACHINING OF COMPONENTS FOR GROUP-E,
REFER ANNEXURE-I FOR DETAILED SCOPE OF WORK.
6 RC-INS-GROUP-FCNC-RING-E INS- TANK HEAVY MILL,TURN & DRILL SCOPE OF WORK: 11 NOS
MACHINING OF COMPONENTS FOR GROUP-F,
REFER ANNEXURE-I FOR DETAILED SCOPE OF WORK.
7 RC-INS-GROUP-GCNC-RING-E INS- MEDIUM MILL &,TURN SCOPE OF WORK: 8 NOS
MACHINING OF COMPONENTS FOR GROUP-G,
REFER ANNEXURE-I FOR DETAILED SCOPE OF WORK.
8 RC-INS-GROUP-HCNC-RING-E INS- TURN & DRILL SCOPE OF WORK: 8 NOS
MACHINING OF COMPONENTS FOR GROUP-H,
REFER ANNEXURE-I FOR DETAILED SCOPE OF WORK.
9 RC-INS-GROUP-ICNC-DOME-E INS- TURN & DRILL& BACK SPOT FACING SCOPE OF WORK: 16 NOS
MACHINING OF DOME SUB ASSEMBLIES FOR GROUP-I,
REFER ANNEXURE-I FOR DETAILED SCOPE OF WORK.
10 RC-INS-GROUP-JCNC-DOME-E INS- TURN & DRILL&MILL&BACK SPOT SCOPE OF WORK: 24 NOS
MACHINING OF DOME SUB ASSEMBLIES FOR GROUP-J,
REFER ANNEXURE-I FOR DETAILED SCOPE OF WORK.
11 RC-INS-GROUP-KCNC-DOME-E INS- TURN & DRILL&BACK SPOT FACING SCOPE OF WORK: 24 NOS
MACHINING OF DOME SUB ASSEMBLIES FOR GROUP-K,
REFER ANNEXURE-I FOR DETAILED SCOPE OF WORK.
12 RC-INS-GROUP-LCNC-M/C-E M/C ING OF COMP. & S/A SCOPE OF WORK: 1000 Hour
MACHINING OF COMPONENTS AND SUB ASSEMBLIES FOR GROUP-L,
REFER ANNEXURE-I FOR DETAILED SCOPE OF WORK.
SAC NO APPLICABLE FOR
CGST Extra (in%)
SGST Extra (in %)
IGST Extra (in%)
COMPLIANCE(Y/N)
Delivery Schedule: Delivery shall be mutually discussed based on HAL requirement
COMMERCIAL TERMS: COMPLIANCE(Y/N)
1) Quotation will be evaluated on totality L1 offer package basis.
2) No agent/agents or third party/parties are engaged by HAL in the process of procurement of any materials for HAL.HAL is also not responsible for any person/firm expressing or pretending to express himself/themselves to be agent or third party representing HAL in the process of procurement of the materials. It is advised to deal directly with HAL representative who is the signatory to this document.
3) Contact Outsourcing Dept of HAL- Aerospace Division for any clarification. Phone: 080-22315543 Mail ID:[email protected].
4) In case of delayed delivery , we reserve the right to collect a sum of 0.5% per week of delay oe part thereof subject to maximum of 5 % as our claim towards liquidated damages on the undelivered part of the order.
5 Price Validity of purchase order must be minimum 2 years from the PO
5) In case of any future requirement, repeat order will be proposed within a year of last supply of service
6) Validity of your offer should be for a period of 120 days from date of opening
7) Rejection Allowance- the Maximum permissible rejection allowance will be 5%. In case the rejection exceeds 5%, HAL Aerospace Division shall recover from the vendor the cost of raw material rejected beyond 5% at prevailing market rate of the material, as per Terms and conditions of out sourcing / P.O.
8) General Terms and Conditions Annexure-B alongwith other commercial annexures- Indemnity Bonds format to be provided are accepted and agreeable.
General Terms and Condtions of Tender Applicable
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
raw.json
RAW_JSON
Annexure 3 - STATUTORY_REQUIREMENTS_e2.pdf
TENDER_DOCUMENT • 0.53 MB
Annexure -4 LIST_OF_PARTS_e1.pdf
TENDER_DOCUMENT • 0.60 MB
ANNEXURE-1_SCOPE_OF_WORK_s3.pdf
TENDER_DOCUMENT • 0.58 MB
ANNEXURE-2,_TERMS___CONDITIONS_s4.pdf
TENDER_DOCUMENT • 0.59 MB
Annexure B General Terms and condition - TOTALITY.pdf
TENDER_DOCUMENT • 0.11 MB
Indemnity Bond Format.docx
TENDER_DOCUMENT • 0.03 MB
Indemnity bond-esi pf.doc
TENDER_DOCUMENT • 0.06 MB
Technical_Bid_Technical_Compliance_Statement_INSRQ_69.xlsm
TENDER_DOCUMENT • 0.02 MB
pricebidINSRQ69T1rev.xlsm
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .