| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAdmitted-Finance | ₹9.3 L | L1 | Admitted-Finance |
| 2 | L2₹10.9 L+₹1.5 L (16.6%)Admitted-Finance | ₹10.9 L+₹1.5 L (16.6%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical CW 545 SANJAY GANDHI TRANSPORT NAGAR NEW DELHI 110042 | NORTH | DELHI | 110042 | - | - | Rejected-Technical Rejected, due to non submission of EMD as per NIT conditions. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected, due to non submission of EMD as per NIT conditions. |
| Sl No | Description | Qty | Unit | A.S.ENTERPRISES L2 | AUTOMATION HEAVY ELECTRICALS L1 |
|---|---|---|---|---|---|
| 1.01 | Dismantling of 11KV/415V power supply of transformer after draw out the VCB from the respective chambers by an expert person from HT panel & transformer. | 1 | Job | 12,600 ₹14,868 | 11,700 ₹13,806 Lowest |
| 1.02 | Dismantling the complete transformer. Removing the top cover, oil tank, silica jel breather and fins etc. lifting the core and coils from the transformer tank. | 1 | Job | 15,300 ₹18,054 | 14,400 ₹16,992 Lowest |
| 1.03 | Debrazing of connections, dismantling of old winding from the transformer core, dismantling of damaged core punching from the transformer, straightening, smoothening of damaged core punching cleaning of old varnish chemically and phosphating treatment of. all the core punching F class core plate varnish coating in automatic varnish coating tunnel type temperature controlled conveyorized baking oven uniform thickness test on varnished. and baked core punching. Assembling of core punching in transformer by staggering repressing hydraulically, locking of complete assembled transformer core. | 1 | Job | 90,450 ₹1,06,731 | 88,200 ₹1,04,076 Lowest |
| 1.04 | Rewinding of 11 KV HT winding limbs, removing the burnt winding. Providing the new DPC copper strips and making the new HT coils as per original. Fixing the coil in transformer core with proper HT insulation. Making the connection and brazing the same with silver mixed copper rod and insulation with HT insulation Varnishing the HT winding with Dr. Beck oil proof varnish and baking the same. | 3 | Job | 2,83,500 ₹3,34,530 | 2,02,500 ₹2,38,950 Lowest |
| 1.05 | Re-insulation of 415V winding limbs, Annealing and cleaning the copper strips, Re-insulation of copper strips with craft paper tape and making the coils as per original shape. Fixing the coils in transformer core with proper LT insulation. Making the connection and brazing the same with silver mixed copper rod and insulation with LT insulation varnishing the HT winding with Dr. Beck oil proof varnish and baking the same. | 3 | Job | 1,62,000 ₹1,91,160 | 1,45,800 ₹1,72,044 Lowest |
| 1.06 | Fixing the core and coil in the transformer tank with safe and sound condition. | 1 | Job | 45,000 ₹53,100 | 38,700 ₹45,666 Lowest |
| 1.07 | Replacement of top cover gasket and insulator gasket oil seal for stopping the leakage. Replacement of silica jel. | 1 | Job | 27,000 ₹31,860 | 21,600 ₹25,488 Lowest |
| 1.08 | Repairing of tape changer. | 1 | Job | 22,500 ₹26,550 | 18,900 ₹22,302 Lowest |
| 1.09 | Filling the new transformer oil make Power. | 910 | ltrs | 1,88,370 ₹2,22,276.6 | 1,80,180 ₹2,12,612.4 Lowest |
| 1.10 | Dehydration of transformer oil. | 1 | Job | 15,300 ₹18,054 | 14,400 ₹16,992 Lowest |
Tender Value
Refer Docs
EMD Value
₹19,100
Closing Date
29 May 2026, 3:00 pmClosed
Executive Engineer (SDW)-IV STP Kondli, Delhi-96
Executive Engineer (SDW)-IV STP Kondli, Delhi-96
Repairing/Rewinding of Transformer No. 2 at Jagriti SPS.
2026_DJB_291860_1
NIT- 2 (2026-27) EE(SDW)-IV
Open Tender
Miscellaneous Works
Item Rate
30 days
Executive Engineer (SDW)-IV STP Kondli, Delhi-96
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
A/C No. 50448339804
₹19,100
30 May 2026
22 May 2026
29 May 2026
22 May 2026
29 May 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of 11KV/415V power supply of transformer after draw out the VCB from the respective chambers by an expert person from HT panel & transformer. | 1 | Job | 80 | ₹80 |
| 1.02 | Dismantling the complete transformer. Removing the top cover, oil tank, silica jel breather and fins etc. lifting the core and coils from the transformer tank. | 1 | Job | 80 | ₹80 |
| 1.03 | Debrazing of connections, dismantling of old winding from the transformer core, dismantling of damaged core punching from the transformer, straightening, smoothening of damaged core punching cleaning of old varnish chemically and phosphating treatment of. all the core punching F class core plate varnish coating in automatic varnish coating tunnel type temperature controlled conveyorized baking oven uniform thickness test on varnished. and baked core punching. Assembling of core punching in transformer by staggering repressing hydraulically, locking of complete assembled transformer core. | 1 | Job | 80 | ₹80 |
| 1.04 | Rewinding of 11 KV HT winding limbs, removing the burnt winding. Providing the new DPC copper strips and making the new HT coils as per original. Fixing the coil in transformer core with proper HT insulation. Making the connection and brazing the same with silver mixed copper rod and insulation with HT insulation Varnishing the HT winding with Dr. Beck oil proof varnish and baking the same. | 3 | Job | 80 | ₹240 |
| 1.05 | Re-insulation of 415V winding limbs, Annealing and cleaning the copper strips, Re-insulation of copper strips with craft paper tape and making the coils as per original shape. Fixing the coils in transformer core with proper LT insulation. Making the connection and brazing the same with silver mixed copper rod and insulation with LT insulation varnishing the HT winding with Dr. Beck oil proof varnish and baking the same. | 3 | Job | 80 | ₹240 |
| 1.06 | Fixing the core and coil in the transformer tank with safe and sound condition. | 1 | Job | 80 | ₹80 |
| 1.07 | Replacement of top cover gasket and insulator gasket oil seal for stopping the leakage. Replacement of silica jel. | 1 | Job | 80 | ₹80 |
| 1.08 | Repairing of tape changer. | 1 | Job | 80 | ₹80 |
| 1.09 | Filling the new transformer oil make Power. | 910 | ltrs | 80 | ₹72,800 |
| 1.1 | Dehydration of transformer oil. | 1 | Job | 80 | ₹80 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_387373.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .