| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-Finance | L1 | Accepted-Finance FIRST LOWEST | |
| 2 | L2₹23.1 L+₹8.4 L (57.0%)Rejected-Finance | L2 | Rejected-Finance SECOND LOWEST | |
| 3 | Rejected-Technical | - | Rejected-Technical TANDC NOT FULLFILL |
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
15 Jan 2021, 5:00 pmClosed
EXECUTIVE ENGINEER
2ND CONSTRUCTION DIVISION (E/M), U P JAL NIGAM, 4/4, SANJAY PLACE, AGRA
Construction of Tube wells by D.C. Rig Machine in District Agra
2021_UPJNM_544493_1
1760/NIVIDA/184 DATED 31.12.2020 (T.W CONST. AGRA)
Open Tender
Water Equipments/ Meter/ Drilling/ Boring
Item Rate
180 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
EXECUTIVE ENGINEER, 2nd C.D. (E/M), U P JAL NIGAM,
₹33,000
24 May 2021
8 Jan 2021
18 Jan 2021
8 Jan 2021
15 Jan 2021
8 Jan 2021
Amount
DC RIG MACHINE TUBE WELL
Transportation, Erection including dismantling of Rig Machine and it's T&P to the site of work. (3X1 Job)
Transportation, Erection including dismantling of Air Compressor & it’s accessories to the site of work. (3X1 Job)
Transportation, Erection including dismantling of Over Pumping Unit & it’s accessories. To the site of work. (3X1 Job)
Zone Testing (3X1 Job)
Drilling of Tube Well by direct circulation method up to 120 m depth including supply of all required materials, oil lubricant, bentonite, labour and T&Petc. Complete as per details given below :-
(a) Pilot bore of 200 mm dia size:-
0 to 80 m BGL drilling (3X80 m)
80 to 120 m BGL drilling (3X40m)
(b) Reaming of Bore :-
550 mm dia bore 0 – 80 m BGL drilling (3X80m)
550 mm dia bore 80 – 120 m BGL drilling (3X40m)
Logging of Borehole (3X 1 Job)
Carting of T.W. Pipe Assembly from store to Site of work including loading, unloading complete (3x1 Job)
Preparation of tube well assembly including painting of pipes and accessories by black epoxy paint. (3X1 Job)
Lowering & fixing of 200 mm dia Plain/ Slotted Pipe including welding of pipes etc. complete in all respect.
G.L. to 80 Mts. (3X80m)
80 to 110 Mts. (3X30m)
Supply & Shrouding of Pea Gravel 1.6 mm to 4.8 mm size Lal Kuan washed & stacked at site of T.W as per latest IS (3X42 m3)
Development of T.W. by suitable capacity Air Compressor. The rates are including supply of all required T&P, material at site, fuel, labour etc. complete. (3X40 Hrs.)
Development of T.W. by suitable capacity O.P. Unit. The rates are including supply of all required T&P material fuel etc. complete. (3X100 Hrs.)
Yeild Testing of T.W. (3x1 Job)
PUMPS ENGINEERS AND TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .