Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.5 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹65.7 L+₹1.2 L (1.81%)Rejected-AOC 129 PANCH SHEEL VENUE DEEP NAGAR JALANDHAR CANTT PB | JALANDHAR | PUNJAB | 144001 | L2 | Rejected-AOC Other than Lowest | |
| 3 | L3₹73.8 L+₹9.2 L (14.3%)Rejected-AOC | L3 | Rejected-AOC Other than Lowest | |
| 4 | L4₹75.4 L+₹10.8 L (16.8%)Rejected-AOC | L4 | Rejected-AOC Other than Lowest | |
| 5 | L5₹83.7 L+₹19.2 L (29.7%)Rejected-AOC | L5 | Rejected-AOC Other than Lowest |
Tender Value
₹75 L
EMD Value
₹1.4 L
Closing Date
1 Feb 2023, 6:00 pmClosed
COL S PRADEEP
Military Engineer Services, HQ Commander Works Engineer Jammu, PIN-900172
IMPROVEMENT OF ROAD BY REPAIR/RESURFACING AT MIRAN SAHIB MIL STN UNDER GE JAMMU
2022_MES_572061_1
CWE/JP-66/2022-23
Open Tender
Civil Works - Roads
Item Rate
120 days
GE JAMMU
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
GE JAMMU
₹1.4 L
Yes
10 Feb 2023
30 Dec 2022
3 Feb 2023
30 Dec 2022
1 Feb 2023
20 Jan 2023
Amount
Scarifying or picking gravelled, macadam or bituminous macadam surface in area not exceeding 400 Sqm and depth exceeding 50mm and not exceeding 100mm deep alongwith removing the rubbish n. exc 50mtr and stacking, complete all as specified and directed.
Rolling and consolidating formation surface with 8 to 12 tonne power rolling , including filling in soft sports, hollows and depressions etc. which occurs during rolling ( for portion coming in cutting/original ground only ) to required level gradient or camber etc. including watering before or during rolling complete all as specified.
75mm thick (Compacted thickness) WBM in one layer with coarse aggregates of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size) of granite, trap or basalt spreading and compaction with 8 to 12 tonne power roller and consolidated to required gradient and camber complete all as specified and directed.
Preparing un surfaced water bound macadum surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with mechanical air blower to remove all loose dirt/foreign materials and applying evenly a priming tack coat with bituminous primer (Paving Bitumen of Viscosity Grade VG-30) at the rate of 10 Kg per 10 Sqm of surface laying bituminous premix asphaltic semi dense concrete 30 mm consolidated thickness with 5.5 % binder content by weight of total mix and 4% stone dust conforming to specification for filler as per IRC-95, 1987 (filler) prepared in hot mix plant, rolled and compacted to required camber and gradient to uniform smooth surfaces by mechanical paver and using with 8 to 12 tonne power roller, complete all as specified and as directed. Note:-The minimum consolidated thickness will be 30mm. However it may be increased at places to maintain the camber as per the site requirement and nothing extra shall be admissible on this account. The contractor must visit the site before quoting their rates.
Preparing existing black top bituminous surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with mechanical air blower to remove all loose dirt/foreign materials and applying evenly a priming tack coat with bituminous primer (Paving Bitumen of Viscosity Grade VG-30) at the rate of 5 Kg per 10 Sqm of surface laying bituminous premix asphaltic semi dense concrete of 30 mm consolidated thickness with 5.5 % binder content of viscosity grade VG-30 by weight of total mix and 4% stone dust conforming to specification for filler as per IRC-95, 1987 (filler) prepared in hot mix plant, rolled and compacted to required camber and gradient to uniform smooth surfaces by mechanical paver and using 8 to 10 tonne power roller, complete all as specified and as directed by Engr-in-Charge. Note:-The minimum consolidated thickness will be 30mm. However it may be increased at places to maintain the camber as per the site requirement and nothing extra shall be admissible on this account. The contractor must visit the site before quoting their rates.
Premix bituminous macadam with broken stone graded aggregate with 4% of paving bitumen binder of viscosity grade VG-30 grade by weight of total mix (Consolidated thickness 75mm or less), laid / rolled and compacted to required gradient and camber using power roller 8 to 12 tonne, complete all as specified and as directed by Engr-in-Charge.
Note for item No. 4 to 6 : (a) Preparation of mix in hot mix plant, spreading by self propelling mechanical paver and rolling and compaction by set of rollers as specified in particular specifications shall be carried out. Hot mix plant may be installed at any distance but the contractor shall be responsible for maintaining the required temperature of mix under all conditions till it is laid and compacted. Unit rate against these items shall include for carrying out the works with deployment of these machinery for which nothing extra shall be payable and no delay in completion of work shall be acceptable on this account. (b) To achieve marshal stability of 1050 KN and all as per SSR Part-I Clause No. 20.B.4. (c) If qty of binder contents is less than the qty as specified in respective items of BOQ, it shall be adjusted at supply only rates of paving bitumen @ Rs 45.00 Per Kg and if qty of binder contents is more than the qty as specified in respective items of BOQ no adjustment shall be made.
Repair to pot holes, exceeding 30mm depth, not exceeding 01 Sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25mm in depth, making good by filling in screened and graded road metal, watering and well ramming, and applying evenly a priming tack coat with bituminous primer (Viscosity Grade Paving Bitumen of Grade VG-30) at the rate of 5 Kg per 10 Sqm of surface, putting in & including premixed bituminous macadam, well rammed and sealed with binder 9.80 Kg/sqm, blinded with 0.09 cum of stone chippings, 6.3mm size and again well rammed, rolled and compacted to required camber and gradient to uniform smooth surfaces by mechanical paver and using with 8 to 12 tonne power roller (including supply of premixed macadam, binder and chippings), complete all as specified and as directed by Engr-in-Charge.
Note:-The minimum consolidated thickness will be 30mm. However it may be increased at places to maintain the camber as per the site requirement and nothing extra shall be admissible on this account. The contractor must visit the site before quoting their rates.
Supply and fixing in repair cat eye solar reflective type of metal body alloy of size 100mm x 100mm x 20mm with PAMA striplens reflector of model No. DA 972.0 fixed with and incl MS stud of suitable size as per manufactures instructions, complete all as specified and as directed.
Preparing bituminous surfaces of road and marking 2.5 mm thick centre lines, stop lines, dashes, arrows etc. and the like n. exc 10 cm wide on roads pavements with hot applied thermo plastic road marking paint of approved colour confirming to BS 3262-1989 with special applicator machine all as per manufacturers instruction complete all as specified and as directed by Engr-in-Charge.
Dismantling of bricks (laid flat or on edge) laid dry complete all as specified and as directed by Engr-in-Charge.
Continous brick edging old size with width equal to the width of the brick of whole sub class 'B " brick laid dry on end vertically including embedding brick with necessassary excavation and earth work in soft / loose soil complete all as specified and as directed by Engr-in-Charge.
s s construction
Sarbat Construction Co
M/S Shesh Paul Gupta
M/s Ravinder Kapoor Engineers and Builders
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .