| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.8 LAdmitted-Fee/PreQual/Technical/Finance | -11.11% | ₹21.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹22.1 L+₹24,579.25 (1.12%)Admitted-Fee/PreQual/Technical/Finance | -10.11% | ₹22.1 L+₹24,579.25 (1.12%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹22.5 L+₹62,922.87 (2.88%)Admitted-Fee/PreQual/Technical/Finance | -8.55% | ₹22.5 L+₹62,922.87 (2.88%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹23.2 L+₹1.4 L (6.25%)Admitted-Fee/PreQual/Technical/Finance | -5.55% | ₹23.2 L+₹1.4 L (6.25%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Upon scrutiny of the documents submitted by the bidders, it has been found that the bidder namely M/S Acier Enterprises has submitted/pledged the CDR and Tender Fee in favour of the C E office which is not in accordance with prescribed T&C of e-nit. |
Tender Value
₹24.6 L
EMD Value
₹50,000
Closing Date
25 Aug 2026, 2:00 pmClosed
Executive Engineer IFCD Handwara
Executive Engineer IFCD Handwara
Malik Khul - Construction of steel flume (L-30 Mtrs) at RD 3300 m at Tumina
2026_IFC_320328_6
09-IFCD/HND/2026-27
Open Tender
Civil Works
Percentage
45 days
Executive Engineer IFCD Handwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Chief Engineer Kashmir Irrigation and FloodControl
₹50,000
5 Sept 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: . All kinds of soil 1 meter from cutting edge. | - | Cum | 479.3 | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | - | Cum | 218.4 | - |
| 3 | Providing and Laying of dry stone soling. | 1 | Cum | 937.9 | ₹936.96 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts | - | Cum | 742.55 | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 mix 20 mm nominal size crushed. | - | Cum | 5,733.6 | - |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement with mix 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 9,395.7 | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars. | 2,497.5 | Kgs | 123.2 | ₹3,07,692 |
| 8 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 mix 20 mm nominal size crushed. | - | Cum | 6,591.25 | - |
| 9 | Hand-packing stones in wire crates , excluding cost of crates and stones | 1 | Cum | 371.15 | ₹370.78 |
| 10 | Supply of stone boulders (Nallah) (Stack measurements reduced by 15%) | 1 | Cum | 931 | ₹930.07 |
stage.html
html • 0.02 MB
finance_1064763.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
BOQ_1064763.xls
BOQ • 0.30 MB
Corrigendum.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .