Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹77,077.23Admitted-Finance | -17.12% | ₹77,077.23 | L1 | Admitted-Finance |
| 2 | L2₹97,652.05Admitted-Finance | +5.00% | ₹97,652.05 | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-RC of Mechianry is not uploaded whicih is mandetory required for stage contract and also mentioned a special condiation in E-NIT |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
15 Apr 2026, 6:00 pmClosed
Executive Engineer PWD Division Gandoh
Executive Engineer PWD Division Gandoh
Stage Contract for maintenance and snow clearance of Gandoh Headquarter Road 2.00km Dalmera Kota Top Road 6.00km Nagni Gandoh Road 150mtr for the year 2026-27
2026_PWDJK_307556_3
E-NIT 02 of 2026-27
Open Tender
Civil Works
Gandoh
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD Division Gandoh
₹20,000
23 Apr 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
9 Apr 2026 - 13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Slip Clerance In ordinary soil disposal lead upto 50 m and lift upto 1.5 m. | - | Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 2 | Slip Clearance In soils; mixed with moorum /Kankar /shingle/b oulders; disposal lead upto 50 m and lift upto 1.5 m. | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 3 | Slip Clarance In soils; mixed with Decomposed Rocks; by blasting or any other means | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 4 | Slip Clearance In medium hard rocks by blasting | - | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 5 | Slip Clearance In hard rocks by blasting | - | Cum | - | - | BI01010001010000000000000515BI0100001118 |
| 6 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-ChargeAll kind of soil | - | Cum | - | - | BI01010001010000000000000515BI0100001120 |
| 7 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-ChargeOrdinary Rock | - | Cum | - | - | BI01010001010000000000000515BI0100001121 |
| 8 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Hard Rock | - | Cum | - | - | BI01010001010000000000000515BI0100001122 |
| 9 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Hard Rock( Blasting Prohabited) | - | Cum | - | - | - |
| 10 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil | - | Cum | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_997674.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid