| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-Finance | ₹1.0 Cr | L1 | Accepted-Finance successfully quoted lowest rate |
| 2 | L2₹1.0 Cr+₹1.1 L (1.02%)Accepted-Finance R O NIMOO | LEH LADAKH | LADAKH | 194101 | ₹1.0 Cr+₹1.1 L (1.02%) | L2 | Accepted-Finance quoted high rate |
| 3 | L3₹1.1 Cr+₹3.2 L (3.09%)Accepted-Finance | ₹1.1 Cr+₹3.2 L (3.09%) | L3 | Accepted-Finance quoted high rate |
| 4 | L4₹1.3 Cr+₹24.6 L (23.7%)Accepted-Finance BASGO | ₹1.3 Cr+₹24.6 L (23.7%) | L4 | Accepted-Finance quoted high rate |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
6 Jul 2026, 4:00 pmClosed
Executive Engineer REW Leh
REW leh
Upgradation of Community Gathering Center and Development of Ground at Henachy. (under Capex)
2026_RDD_19075_1
18- UTL REW Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
180 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,400
Payable To Executive Engineer REW Leh
₹2.8 L
28 Jul 2026
16 Jun 2026
8 Jul 2026
16 Jun 2026
6 Jul 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, as directed by Engineer-in-charge. | 3,094.02 | cum | 208.43 | ₹6,44,893.4 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil. | 172.02 | cum | 278.09 | ₹47,837.59 |
| 3 | P/L Dry stone soling including cost of stones and preparing surface complete | 25.6 | cum | 953.03 | ₹24,397.45 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 gradedstone aggregate 40 mm nominal size derived from natural sources) | 46.22 | Cum | 6,417.78 | ₹2,96,629.79 |
| 5 | Random rubble masonry with hard stone in foundation andplinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarses and: 12graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) | 65.27 | cum | 5,729.66 | ₹3,73,974.97 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 73.16 | cum | 11,102.31 | ₹8,12,245 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 21.11 | cum | 11,551.66 | ₹2,43,855.54 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 29.72 | sqm | 306.15 | ₹9,098.85 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 111.48 | sqm | 769.01 | ₹85,729.07 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 236.05 | sqm | 602 | ₹1,42,102.1 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_45479.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .