Tender Value
₹24 L
EMD Value
₹24,000
Closing Date
28 Mar 2023, 1:00 pmClosed
SE EDC-I BSR
SE EDC-I HYDEL COLONY BULANDSHAHR
In relation to getting the necessary works done on semi-turnkey basis in view of fixed hours power supply in the newly created/expanded municipal bodies.
2023_PVVNL_788408_1
T-105/EDC-I/B/2022-23
Open Tender
Electrical Works
Item Rate
30 days
BULANDSHAHR
PLZ REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹3,540
SE EDC-I
₹24,000
29 Mar 2023
23 Mar 2023
28 Mar 2023
23 Mar 2023
28 Mar 2023
23 Mar 2023
Amount
fo|qr forj.k [k.M&’k’Ve] cqyUn”kgj ds vUrxZr uol`ftr@foLrkfjr uxj fudk;ksa esa fu/kkZfjr ?kaVs fo|qr vkiwfrZ ds n`f’Vxr vko”;d dk;Z lseh VuZdh ds vk/kkj ij djk;s tkus ds laca/k esaA
Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 40 Kms.
S.T Pole 11 Mtr. Long
PCC Pole 8.5 mtr Long.
LT ABC size 3X120+1X95+1X16
11 kv XLPE Cable 3x185 sq.mm.
100 KVA T/F
ACSR Weasel
Erection of Single pole STP Pole 11 mtr./ PCC Pole 8.5 mtr. support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of Double pole STP Pole 11 mtr./ PCC Pole 8.5 mtr./Scation Pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Laing of LT ABC size 3X120+1X95+1X16
Laing of 11 kv XLPE Cable 3x185 sq.mm.
Laing of ACSR Weasel
Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Double pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Mounting & eraction of 100 KVA T/F all work
The folloing material is required to be supplied by the contractor.
Provading & Fixing 3Phase Distrubion Box
Provading & Fixing Holding clamp.
Provading & Fixing Suspension clamp with G.I Hook.
Provading & Fixing Ded & clamp with G.I Hook.
Provading & Fixing P.C.R.
Provading & Fixing Cable Jointing kit.
Provading & Fixing GI Pipe 6 dia.
Provading & Fixing M.S Channel.
Provading & Fixing Earthing Complete.
Provading & Fixing M.S. Angle.
Provading & Fixing 11Kv Pin Insulator with Pin & Nut.
Provading & Fixing 11Kv Disc Insulator with fitting.
Provading & Fixing Stay set Complete.
The work of cable Trunch with HDEP Pipe with complet work
Raj Engineers
M/S RAGHAV and BROTHERS
JAI AMBA CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .