Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| Sl No | Description | Qty | Unit | MARAM JYOTI DUTA L1 |
|---|---|---|---|---|
| 1.00SCHEDULE `A' PART-I (Bldg Wk) | ||||
| 1.10 | Supply & Constr of PUF shelter for SM Bk (18.30x6.10x2.70) incl internal & external electrification and furniture.all as per GeM specification and directed by Engr in charge drg No DGAR/COB/01, Sheet No 1 to 10. | 1 | Each Job | 30,00,000 ₹30,00,000 Lowest |
| 1.20 | Supply & Constr of PUF shelter for Kote (18.30x6.10x3.0m) incl internal & external electrification and furniture.all as per GeM specification and directed by Engr in charge drg No DGAR/COB/04 Sheet No 1 to 9 | 1 | Each Job | 30,00,000 ₹30,00,000 Lowest |
| 1.30 | Supply & Constr of PUF shelter for CH/DH (20.88x6.10x2.80m) incl sanitary and water supply, internal & external electrification and furniture.all as per GeM specification and directed by Engr in charge drg No DGAR/COB/02 Sheet No 1 to 11 | 1 | Each Job | 30,00,000 ₹30,00,000 Lowest |
| 1.40 | Supply & Constr of PUF shelter for Sentry post (8.40M (7.90+0.5) m ht. incl internal & external electrification and furniture.all as per GeM specification and directed by Engr in charge drg No DGAR/COB/001 Sheet No 1 to11 | 4 | Each Job | 15,00,000 ₹60,00,000 Lowest |
| 1.50 | Supply & Constr of PUF shelter for Signal/MI room (18.30x6.10x3.0m) incl internal & external electrification and furniture.all as per GeM specification and directed by Engr in charge drg No DGAR/COB/04 Sheet No 1 to 9 | 1 | Each Job | 26,71,098 ₹26,71,098 Lowest |
| 1.60 | Constr of PUF shelter (7.20x2.20m) 06 men toilet block incl sanitary and water supply, internal & external electrification, furniture all as per GeM specification and directed by Engr in charge Drg No DGAR/COB/114 Sheet No 1 to 03, DGAR/COB/05 Sheet No 1 to 02, DGAR/COB/06 Sheet No 1 | 1 | Each Job | 14,78,440 ₹14,78,440 Lowest |
| 2.00Sch A Part II (PCC Footpath with Chequired tiles 178 mtr ) | ||||
| 2.10 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge. All type of soil. | 213.6 | sqm | 300 ₹64,080 Lowest |
| 2.20 | S&laying stone aggregate of 90 to 45 mm size of WBM with moorum as binding meterial incl 13.2 mm size stone screening sorting watering spreading to template campacting stone aggregate in uniform thickness | 26.7 | Cum | 5,000 ₹1,33,500 Lowest |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
20 Mar 2025, 11:00 amClosed
SO-1 (Wks), HQ DGAR
SO-1 (Wks), Engr Branch, HQ DGAR, Laitkor, Shillong-10
Provn of habitats at COB Kharasang of 11 AR
2025_ARMHA_852503_1
VIII.11014/8666/25 Sect/2025
Open Tender
Civil Works
Works
270 days
Kharasang
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
DGAR
₹3.8 L
2 May 2025
8 Mar 2025
21 Mar 2025
8 Mar 2025
20 Mar 2025
8 Mar 2025
8 Mar 2025 - 20 Mar 2025
Amount
SCHEDULE `A' PART-I (Bldg Wk)
Supply & Constr of PUF shelter for SM Bk (18.30x6.10x2.70) incl internal & external electrification and furniture.all as per GeM specification and directed by Engr in charge drg No DGAR/COB/01, Sheet No 1 to 10.
Supply & Constr of PUF shelter for Kote (18.30x6.10x3.0m) incl internal & external electrification and furniture.all as per GeM specification and directed by Engr in charge drg No DGAR/COB/04 Sheet No 1 to 9
Supply & Constr of PUF shelter for CH/DH (20.88x6.10x2.80m) incl sanitary and water supply, internal & external electrification and furniture.all as per GeM specification and directed by Engr in charge drg No DGAR/COB/02 Sheet No 1 to 11
Supply & Constr of PUF shelter for Sentry post (8.40M (7.90+0.5) m ht. incl internal & external electrification and furniture.all as per GeM specification and directed by Engr in charge drg No DGAR/COB/001 Sheet No 1 to11
Supply & Constr of PUF shelter for Signal/MI room (18.30x6.10x3.0m) incl internal & external electrification and furniture.all as per GeM specification and directed by Engr in charge drg No DGAR/COB/04 Sheet No 1 to 9
Constr of PUF shelter (7.20x2.20m) 06 men toilet block incl sanitary and water supply, internal & external electrification, furniture all as per GeM specification and directed by Engr in charge Drg No DGAR/COB/114 Sheet No 1 to 03, DGAR/COB/05 Sheet No 1 to 02, DGAR/COB/06 Sheet No 1
Sch A Part II (PCC Footpath with Chequired tiles 178 mtr )
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge. All type of soil.
S&laying stone aggregate of 90 to 45 mm size of WBM with moorum as binding meterial incl 13.2 mm size stone screening sorting watering spreading to template campacting stone aggregate in uniform thickness
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand).Dark shade pigment using ordinary cement
Sch A Part III (Drain 150m ) drg No DGAR/Engr/COB/10 sheet 01
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge. All type of soil.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from naturalsources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 18.84 MB
BOQ_896161.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .