Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | I₹3.0 CrAccepted-Finance | ₹3.0 Cr | I | Accepted-Finance Accepted |
| 2 | II₹3.0 CrAccepted-Finance | ₹3.0 Cr | II | Accepted-Finance Accepted |
Tender Value
₹3 Cr
EMD Value
₹3 L
Closing Date
13 Jun 2022, 4:00 pmClosed
The CEO, Cantonment Board Wellington
Cantonment Board Wellington, The Nilgiris-643231
MAINTENANCE AND REPAIRS TO DRAINS FOOTPATH RETAINING WALL AND OTHER RELATED WORKS - 2nd Call
2022_DGDE_525745_1
WCB/018/2022
Open Tender
Civil Works
Works
120 days
Cantonment Board Wellington
As per Tender Document
2 documents required · 2 mandatory
₹2,000
The CEO, Cantonment Board Wellington
₹3 L
15 Jun 2022
24 May 2022
14 Jun 2022
24 May 2022
13 Jun 2022
24 May 2022
24 May 2022 - 24 May 2022
Amount
Surface Excavation n. exc. 30cm deep & avg 15 cm deep & getting out in hard dense soil.
Demolition and dismantling to existing Foot path
Removing building materials etc to a distance of 100m or under beyond the lead included in the rates incl loading and unloading and stacking at the destination
Earth work excavation in ordinary soil up to a depth 1.5 mtr. Height.
Rough earth work excavation in hard rock up to a depth 1.5 mtr. From the starting point
Rough earth work excavation in hard rock up to a depth 1.5-3.0 mtr. From the starting point
Rough excavtion not exceeding 1.5m deep and getting out in soft/ dis integrated soil
Rough earth work excavation in hard dense soil up to a depth 1.5-3.0 mtr. From the starting point
Rough earth work excavation in hard dense soil up to a depth 3.0-4.5 mtr. From the starting point
Rough earth work excavation in hard dense soil to a depth 4.5-6.0 mtr. From the starting point
Excavating in trenches n .exc 1.50 m depth and getting out in hard dense soil
Excavating in trenches n .exc 1.50 m depth and getting out in hard rock
Excavating in trenches 1.5 to 3.0 m depth and getting out in hard dense soil
P.c.c. with cement mortar 1:4:8,using 40mm graded metal.
P.C.C. 1:2:4,20mm graded stone aggregate in footings foundation beams etc. Complete.
P.C.C. 1:3:6,40mm graded stone aggregate in footings foundation beams etc. Complete.
Form work to sides of concrete surfaces.
R.C.C. 1:2:4,20mm graded stone aggregate in footings foundation beams etc. Complete.
R.C.C. 1:2:4,20mm graded stone aggregate in walls etc. Complete.
Form work to fair finished concrete concrete surfaces as in sides of parapet/walls/partitions-Sqm
Mild steel TMT bars 10mm dia and over cut to length bent to shape required including cranking, bending spirally for hopping ends and binding with and including MS wire not less than 0.9mm dia.
Rendering 10 mm thick on other than fair faces of brick work in cement mortar 1:6 finished even and smooth W/o using extra cement
Returning ,filling in spreading , levelling , wateringand well ramming watering etc. Complete.
Removing excavated materials n.exceeding 50mtrs. Distance including loading unloading etc. Complete.
Forming 20mm thick expansion joints filled with preformed bituminous filler and top 30 mm primed and sealed with sealing compound grade A.
Supplying and fixing RCC Hume pipe 300mm dia, class NP2, laid and jointed complete with collars
Setting coat 5mm thick, toweled to even and smooth finishing to bottom of drain using etc. Cement with cement plaster 1:2.
M&L three coat of white wash on newly plaster surfaces on brick work or concrete surfaces including preparation of the new surfaces.
Supplying and fixing 75mm dia pvc pipe laid in trenches or in floors
THANGAM CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .