Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-Finance | L1 | Accepted-Finance L1 Bidder | |
| 2 | L2₹18.5 L+₹14,400.29 (0.78%)Accepted-Finance PLOT NO 37 A BALAJI AVENUE KRISHNAPURAM PONNERI 601204 | THIRUVALLUR | TAMIL NADU | 601204 | L2 | Accepted-Finance L2 Bidder |
| Sl No | Description | Qty | Unit | P RAJALINGAM CONTRACTOR L2 | PAVITHRA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing light jungle at various locations during various period of time and disposing off to a place at least 1 km away from the site as directed by the Engineer in charge including cost of all labour charges, lead, lift, Tool & plants etc, complete. | 1,09,600 | Sqm | 7.08 ₹9,15,642.24 | 7.07 ₹9,14,348.96 Lowest |
| 2.00 | Sweeping and cleaning of buildings floor area including removal of cobwebs, debris, garbage, teacups, paper waste and other liters etc., and disposing the same in to near by dustbins daily in all working days as instructed by the Engineer incharge, including cost of all labour, cleaning material, safety appliances, etc., complete. | 3,16,188 | Sqm | 0.53 ₹1,97,743.98 | 0.52 ₹1,94,012.96 Lowest |
| 3.00 | Mopping and cleaning of floor area in all buildings including cost of all materials, labour, lead, lift, Tools and plants, charges for saftey appliance etc., | 2,83,733 | Sqm | 0.71 ₹2,37,711.51 | 0.7 ₹2,34,363.46 Lowest |
| 4.00 | Storm water drain maintenace - Removal of earth, sand, silt, fly ash and other loose materials deposited under water in storm water drains using baskets /vessels, Spade and special tools as per site condition including disposing the same by cleaning once in a year, rate includes cost of labour, lead, lift, tools & tackles, etc. complete, as directed by the Engineer In Charge | 3,297 | RM | 30 ₹1,16,713.8 | 29.5 ₹1,14,768.57 Lowest |
| 5.00 | Culvert maintenace - Removal of earth, sand, silt, fly ash and other loose materials deposited under water in storm water drains using baskets /vessels, Spade and special tools as per site condition including disposing the same as directed by the Engineer In Charge, rate includes cost of labour, lead, lift, tools & tackles, etc. complete, | 150 | RM | 201 ₹35,577 | 200 ₹35,400 Lowest |
| 6.00 | Road Sweeping and collection of litter dry leaves, earth, ash / coal dust etc along road once in a week and removing the Earth / Ash silt deposits including cost of all materials, labour, lead lift disposal etc. complete | 2,83,267 | Sqm | 0.65 ₹2,17,265.79 | 0.64 ₹2,13,923.24 Lowest |
| 7.00 | Clearing away the garbage, debris & ash from dustbins,spilled lots and all other wastes lying scattered around the buildings, on roads, etc., and disposing away with a lead of 1km as dircted including all Charges, lead, lift conveyance tools & plants etc complete. (Clearance from dust bins to be done once in a week and collection of garbage to be done regularly/daily from ground level locations, roads, buildings, open area, etc.. as directed by the Engineer In Charge) | 96 | m3 | 256 ₹28,999.68 | 255 ₹28,886.4 Lowest |
| 8.00 | Regular maintenance of the existing tree saplings by removal of weeds growth, cleaning and disposing of fallen dry leaves , purning of tree branches then and there, watering the saplings by manually, rate including cost of all charges for materials, tools and tackles such as water hoses and arrangements to bring water to greenbelt from nearby water source, scissors, pick axe, sickle, lead, lift, etc. complete. | 38,125 | Opr | 2.31 ₹1,03,921.13 | 2.3 ₹1,03,471.25 Lowest |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
29 Aug 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Chief Engineer/NCTPP Stage-III
Athipattu Chennai-120
Sweeping and mopping of floor area in ICHS Switchgear building and ECHS Switchgear building of CHP system in NCTPP Stage-III and cleaning of allied roads, drain and culvert, Greenbelt maintenance, clearing of jungle clearing and disposal
2025_EB_596805_1
CE/E/ SE/C/NCTPP-STAGE III/18/ 2025-2026
Open Tender
Civil Works
Works
365 days
NCTPP Stage-III
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,000
Yes
14 Nov 2025
23 Aug 2025
30 Aug 2025
23 Aug 2025
29 Aug 2025
23 Aug 2025
23 Aug 2025 - 28 Aug 2025
Amount
Clearing light jungle at various locations during various period of time and disposing off to a place at least 1 km away from the site as directed by the Engineer in charge including cost of all labour charges, lead, lift, Tool & plants etc, complete.
Sweeping and cleaning of buildings floor area including removal of cobwebs, debris, garbage, teacups, paper waste and other liters etc., and disposing the same in to near by dustbins daily in all working days as instructed by the Engineer incharge, including cost of all labour, cleaning material, safety appliances, etc., complete.
Mopping and cleaning of floor area in all buildings including cost of all materials, labour, lead, lift, Tools and plants, charges for saftey appliance etc.,
Storm water drain maintenace - Removal of earth, sand, silt, fly ash and other loose materials deposited under water in storm water drains using baskets /vessels, Spade and special tools as per site condition including disposing the same by cleaning once in a year, rate includes cost of labour, lead, lift, tools & tackles, etc. complete, as directed by the Engineer In Charge
Culvert maintenace - Removal of earth, sand, silt, fly ash and other loose materials deposited under water in storm water drains using baskets /vessels, Spade and special tools as per site condition including disposing the same as directed by the Engineer In Charge, rate includes cost of labour, lead, lift, tools & tackles, etc. complete,
Road Sweeping and collection of litter dry leaves, earth, ash / coal dust etc along road once in a week and removing the Earth / Ash silt deposits including cost of all materials, labour, lead lift disposal etc. complete
Clearing away the garbage, debris & ash from dustbins,spilled lots and all other wastes lying scattered around the buildings, on roads, etc., and disposing away with a lead of 1km as dircted including all Charges, lead, lift conveyance tools & plants etc complete. (Clearance from dust bins to be done once in a week and collection of garbage to be done regularly/daily from ground level locations, roads, buildings, open area, etc.. as directed by the Engineer In Charge)
Regular maintenance of the existing tree saplings by removal of weeds growth, cleaning and disposing of fallen dry leaves , purning of tree branches then and there, watering the saplings by manually, rate including cost of all charges for materials, tools and tackles such as water hoses and arrangements to bring water to greenbelt from nearby water source, scissors, pick axe, sickle, lead, lift, etc. complete.
P RAJALINGAM CONTRACTOR (BID ID -1443517)
stage.html
html • 0.04 MB
technical_713262.pdf
techsummary_713262.pdf
finance_713262.pdf
BOQ Comparative Chart
xlsx
finsummary_713262.pdf
cancelled_1.pdf
pdf • 0.13 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_713262.xls
BOQ • 0.30 MB
S18.pdf
Tender Documents • 1.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .