| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.7 LAdmitted-Finance | -2.00% | ₹6.7 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹6.8 L
EMD Value
₹13,640
Closing Date
6 Aug 2026, 2:00 pmClosed
EE PHED DIV FALNA
EE PHED DIV FALNA
Regular maintenance of RWSS Sanderao under Sub Division Sumerpur
2026_PHCJO_576268_1
NIT No 32/2026-27
Open Tender
Civil Works
Percentage
365 days
FALNA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EE PHED DIV FALNA
₹13,640
Yes
10 Sept 2026
24 Jul 2026
6 Aug 2026
24 Jul 2026
6 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month.
Jointing material shall be provided by the department. Minimum labour for a following kms pipelines to be deployed. 1 km to 50 km - one fitter-II & one beldar | 240 | per km per month | 787 | ₹1,88,880 |
| 2 | Daily/ periodical operation of valves at supply times for specified by department per sluice valve per month. (Valve rod and cap to be arranged by contractor
(80-300mm) | 120 | Each per Months | 1,200 | ₹1,44,000 |
| 3 | Running expenditure of pumphouses which includes complete operation of pumpmotor , maintenance of log-books as directed by Engineer-in-charge, general upkeeping of premises, security arrangements, Regular chemical dosing in CWR, cleaning and desilting of SR/CWR/SUMP once every six months, daily valve operation under the Campus of pump house and all other works as mentioned in scope of work in tender document for per pump house per month. (power supply up to 8 hrs)
(excluding repairing of pumping machinery etc.) upto 50 hp | 12 | Each per Months | 14,640 | ₹1,75,680 |
| 4 | Maintenance of centrifugal pump sets and motor/ Monoblock including cost of rewinding of motor, material components & accessories required to repair pumpsets, starters etc. of electric panels, deinstallation and re installation of pumpsets complete in all respect for per Centrifugal pump set with pannel per month. maintenance of histroy sheet as directed by Engineer-in- charge for centrifugal pump set per month.
Operated load of Centrifugal Pump sets (HP) 6.0 HP to 12.5 HP | 48 | Each month | 2,105 | ₹1,01,040 |
| 5 | Maintenance of tubewells which includes complete repairs / rewinding of submersible pump sets including cost of material components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of Histroy sheet as directed by Engineer-in-charge for tubewell per month. 6.0 HP to 7.5 HP | 36 | Each | 2,003 | ₹72,108 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_1024560.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .