| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.0 CrAccepted-AOC 10 62 BAHAAR B SAHARA STATE JANKIPURAM LUCKNOW | ₹6.0 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹6.1 Cr+₹2.9 L (0.48%)Rejected-Finance NIL A 13 MA0NO 37 MOHADDIPUR POLICE STATION CANTT DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹6.1 Cr+₹2.9 L (0.48%) | 2 | Rejected-Finance L2 |
| 3 | 3₹7.1 Cr+₹1.1 Cr (18.1%)Rejected-Finance | ₹7.1 Cr+₹1.1 Cr (18.1%) | 3 | Rejected-Finance L3 |
| 4 | 4₹7.4 Cr+₹1.3 Cr (22.2%)Rejected-Finance KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹7.4 Cr+₹1.3 Cr (22.2%) | 4 | Rejected-Finance L4 |
Tender Value
₹15.6 Cr
EMD Value
₹15.6 L
Closing Date
26 Oct 2023, 3:00 pmClosed
OFFICE OF THE SUPERINTENDING ENGINEER, IVth CIRCLE
OFFICE OF THE SUPERINTENDING ENGINEER, IVth CIRCLE
LOT-08 Restoration work from km 78.059 to km 132.968 of Hamirpur branch in Jalaun district.
2023_UPIDC_849712_8
04/SE-IV/2023-24
Open Tender
Civil Works
Item Rate
180 days
JALAUN
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,200
₹15.6 L
7 Dec 2023
18 Oct 2023
26 Oct 2023
18 Oct 2023
26 Oct 2023
18 Oct 2023
Amount
Filling empty cement bags with transported earth upto lead of 60M . , machine sewing, placing in position including cost of carriage of earth, labour , t&p etc
Earth work in Mar, Rankar and Kankar mixed soil in correcting Internal section and structuer foundatin of canal i/c lead 30.0 m and lift 2.0 m with manual compaction and dressing.
Earth work in Mar, Rankar and Kankar mixed soil in filling for Strengthening of Bank & Service Road i/c extra for lead up to 195 mtr.
Earth work in Mar, Rankar and Kankar mixed soil in filling for Strengthening of Bank & Service Road i/c extra for lead up to 395 mtr.
C.C. 1:3:6 with stone grit (20-40mm) size in foundation of wall i/c all cost of labour and T&P etc.
Brick work (M-150) with 1:4 cement motar including all cost material labour and T&P etc.
Struck pointing 1:2 cement mortat including all cost of material, labour and T&P etc.
12.5 mm Cement plaster in 1:4 cement mortat including all cost of material, labour and T&P etc.
Centering & shuttring for R.C.C. & C.C. work in bed block,slab & foundation C.C. including cost of all material and T&P etc.
Reinforcement for R.C.C. work i/c cutting , bending,& binding& placing in position including cost of material, labour, T& P etc.
R.C.C. 1:1.5:3 with stone grit (10-20mm) size i/c all cost of labour and T & P etc.
Painting canal gauges in three colours of enamel paints including figures with cost of labour and enamel paint.
Fabrication and fixing of canal gate shutter including all cost of material labour T&P etc for proper completion of work as directed by Engineer-in-charge.
Supply and fixing of canal gate threaded shoft including all cost of material labour T&P etc for proper completion of work as directed by Engineer-in-charge.
Painting on old rusted steel surface of gates and appurtenances after preparation of surface properly by sand blasting process and applying two coat of Zinc Rich primer and two coat of solvent less epoxy paint including cost of all material, labour T&P and scaffolding required for proper completion of work.
Providing and laying C.C. (1:2:4) in coping with coarse sand cement and 10 mm to 20 mm crushed stone grite including cost of material, labour, T&P etc. proper completion of work as per dire ction of Engineer-in-charge.
Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 160 mm PE 100 pipe PN6, IS-4984.
Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 110 mm PE 100 pipe PN4, IS-4984
AJAY ASSOCIATES
ARUN CONSTRUCTION
Durga Engineers and Earth Movers
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
04SEIVNIT2023-24PDF.pdf
Tender Notice • 2.34 MB
BOQ_1429258.xls
BOQ Document • 0.34 MB
131792717.pdf
Tender Document • 1.30 MB
131792719.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .