Loading…
Loading…
Tender Value
₹7.6 L
EMD Value
₹18,879
Closing Date
25 Jun 2026, 9:30 pm6d left
Similar tender results from the same govt authority in the past 3 years.
Karnataka Forest Department
Raising of Monsoon plantation work at Megaravalli to Ranjadakatte Extent 2.395 Km Agumbe Range under AOA Budget Head
307208
KFD/2026-27/OW/WORK_INDENT39395/CALL-2
Open
Other Works
KFD ACF Territorial Sub Division Office Ayanur
4 documents required · 0 mandatory · 4 optional
Department Registration Details
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing work
List of works for which tenders already submitted
Banker Details
Upload all documents as per tender documents
₹500
₹18,879
17 Jun 2026
17 Jun 2026
29 Jun 2026
24 Jun 2026
MODEL -14(A) - LINEAR PLANTATION (ROADSIDE / CANAL BANK PLANTATION)]
DATASHEET NO - 95 - RAISING OF MONSOON PLANTATION DURING 2026-27
No of pits 300 / Km + 30 = 330 PBs
14"x20" - 330 plants Espacement :- 7M x 7M
Sl. No. CSSR Item No. Particulars of the Work Qnty. Rate Per Amount
1 32(a) Aligning in the planting area and marking for pit (without staking) (Aligning of pit in Staggered design) 300 Pits 544.16 1,000 163.25 163.248
2 38(i) Excavation of pits by mechanical of size by 1m x 1m x 1m with vertically cut edges to make an uniform cube and heaping the excavated soil (1/3rd top soil on the upper side & 2/3rd on the lower side) 300 Pits 155.91 1 46,773.00 46773
3 32 (c) Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% of the pit with the excavated soil, duly breaking the clods & formation of saucer shaped mound on the lower side of the pit 225 Cmtr 32.89 Cmtr 7,400.25 7400.25
4 23 Loading of polythene / HDPE bagged seedlings into vehicle at the nursery site and unloading at the site nearest to the planting site - 330 Pbs 13,568.87 1000 4,477.73 4477.7271
(f) Seedlings raised in 14" x 20" size bags
5 24 (f) Transportation: Transportation of polythene / HDPE bagged seedlings in vehicle from nursery site to planting site.
(iv) Seedlings raised in 14"x20" size bags: Distance from 21 to 30 Kms. 330 Pbs 12,472.34 1000 4,115.87 4115.8722
6 26(d) Watering by dipping: Watering polythene / HDPE bagged seedlings at planting site by dipping in water (including carrying of water) only in dry conditions of weather. (14"x20") 330 pbs 1,320.14 1000 435.65 435.6462
Sl. No. CSSR Item No. Particulars of the Work Qnty. Rate Per Amount
7 32(f) Conveyance of tall seedlings raised in HDPE bags of size 14"x20" from the dumping point to the planting site near each pit on head load, fixing the supporting stake firmly in the pit, planting the tall seedling in the pit tying the seedling to the supporting stake at 3 points (excluding cost of supporting stake) (14"x20" planting ) 330 Plant 73.24 each 24,169.20 24169.2
8 RQ Purchase of NPK / DAP (100+100=200 gms per plant) 2 times 60 KG 35.98 KG 2,158.80 2158.8
9 38 (e) Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses. 300 Plants 586.52 1000 351.91 351.912
10 32 (l) Saucer Bharav: Scraping out of grass and weeds to a radius of 50 cms around the plant, earthening up of soil in the form of a semi-circular slanting saucer shape slope, loosening of boulders if any with soil by using pickaxe and arranging the loosened boulders and soil in semi-circular fashion at the lower side of the plant (Dimension 80 cms diameter and 25 cms depth at deepest point) 300 Plants 15,956.21 1,000 4,786.86 4786.863
11 32 (j) First Weeding around the plants (pit) to radius of 60 cm (Aug) 300 Plants 1,833.43 1000 550.03 550.029
12 32 (o) Scraping of grass and other growth around the plant to a radius of 1 m. 300 plants 12,637.26 1000 3,791.18 3791.178
13 32 (m) Hoeing & soil working with pickaxe around the plant to a depth of 15cm. & to a radius of 60 cm. so as to loosen the soil around the plants (pits only). 300 plants 7,334.34 1000 2,200.30 2200.302
14 41(j)(ii) Watering to the seedlings along roadside and in the city limits at 50 liters/plants 6 times (One watering if planted in May, 5 watering in Jan, Feb & March) (Nos are Flexi) 300 plants 56.23 Each 101,214.00 101214
15 wage Protection of plantation as per the standard norms (for 3 km as a unit during the year and pro-rata for different extent for the actual period) 274 days 620.66 3 km 56,686.95 56686.9466666667
16 RQ Procurement & transportation of 10' feet length & 10-15 cm girth Marihala Bamboo / wooden Stakes / Debarked Eucalyptus stakes. Each of the sticks is to be dipped in hot liquid coal tar to a minimum length of 5 feet. 300 plants 51.87 each 15,561.00 15561
17 32(g) Cutting & collection of Prosopis juliflora (PJ) branches loading the same into the lorry & unloading at the planting site (10 branches per tall plant) 300 Plant 44.07 each 13,221.00 13221
18 32(h) Conveyance of P.J. branches to individual pit, tying P.J.branches around the supporting stake properly covering the tall plant with P.J.thorny branches to a height of more than 2m and tying the P.J.branches with G.I.wire at 3 places (10 P.J.branches to be used for tying the fall seedling). Alternately phoenix leaves could be used depending on availability. 300 Plant 51.51 each 15,453.00 15453
19 LS / RQ Providing & fixing quality plantation board (48"x27"x18" including painting, writing, trasportation & fixing) 1 No 4,065.72 each 4,065.72 4,065.72
20 Sub estimate Raising of 14"x20" pb seedlings during 2026-27 for 10% Casuality Replacement 30 Pbs 102.676 Each 3,080.28 3221.4
21 Maintenance of 14"x20 seedlings. 330 Pbs 13.873 Each 4,578.09 4578.09
22 Miscellaneous & rounding off 65.940 24.816
Note Item of Works can be modified by the DCF based on the field requirement with the concurrence of CCFs with in same cost norm.
Assistant Conservator of Forests,
Ayanur Sub Division, Shimoga
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Noitification AOA Call-2.pdf
Tender Document • 9.38 MB
Annexure -1 AOA Call-2.pdf
Tender Document • 0.51 MB
315300.xlsx
Tender Document • 0.02 MB
Download all tender documents and submit your bid