| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | ₹8.0 L | L1 | Accepted-AOC Lowest Price |
| 2 | L2₹8.1 LRejected-Finance | ₹8.1 L | L2 | Rejected-Finance Highest Price |
| Sl No | Description | Qty | Unit | MUTHUKUMARAN L1 | NITHYANADHAM L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and to full depth as may be directed,except in hard rock,requiring blasting including shoring and shuttering and bailing out of water wherever necessary,refilling the sides of foundation with excavated earth or sand in layer of not more than 15cm thick.well rammed and consolidated and depositing on bank with initial lead and lift of 10m & initial lift of 2m and depositing the surplusr earth within the compound in places shown by the departmental officers with iniital lead and lifts,clearing and levelling the site etc., complete as per SS20B and as directed by departmental Engineers(TNBP No.17,23,24). | 154 | m3 | 120 ₹18,480 | 130 ₹20,020 |
| 2.00 | Supplying and filling in foundation and basement with Stone Dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 22 | m3 | 265 ₹5,830 | 270 ₹5,940 |
| 3.00 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 22 | m3 | 5,400 ₹1.2 L | 5,410 ₹1.2 L |
| 4.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 396 | m2 | 464 ₹1.8 L | 470 ₹1.9 L |
| 5.00 | Plain Cement Concrete 1:2:4 mix (One Cement, Two Sand and Four Coarse Aggregate) Using 20mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 47 | m3 | 6,796 ₹3.2 L | 6,800 ₹3.2 L |
| 6.00 | Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 99 | m2 | 160 ₹15,840 | 168 ₹16,632 |
| 7.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 1 | m3 | 8,510 ₹8,510 | 8,515 ₹8,515 |
| 8.00 | Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 93 | m3 | 67 ₹6,231 | 70 ₹6,510 |
| 9.00 | GST 18% | 1 | No | 1,21,836 ₹1.2 L | 1,22,824 ₹1.2 L |
Tender Value
₹8.1 L
EMD Value
₹16,201
Closing Date
13 Oct 2025, 3:00 pmClosed
Commissioner
Infantary Road, Vellore Corporation, Vellore-632001
Construction of Strom Water Drain at Anna Nagar 3rd West Main Road in Ward No . 50 at Zone - III Vellore Corporation.
2025_MAWS_611525_1
3211/2025/E1-Z-3/GF-25-26/P1
Open Tender
Civil Works
90 days
Vellore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,201
16 Feb 2026
4 Oct 2025
13 Oct 2025
4 Oct 2025
13 Oct 2025
4 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_730713.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid