Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance R O RAMBAN GARHI | Admitted-Finance |
Tender Value
₹5.7 L
Closing Date
1 Oct 2021, 6:00 pmClosed
Executive Engineer, REW, Doda.
Office of the Executive Engineer, REW, Doda.
Constt of Foot Bridge (Culvert) at Kholi Nallah Panchayat Sarak Block Marmat (PRIs GRANT)
2021_RDPR_139784_9
e-NIT No 21/Capex of REW Doda 2021-22 DT 14-09-21
Open Tender
Civil Works
Item Rate
45 days
DODA
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer, REW, Doda.
Exempted
18 Oct 2021
16 Sept 2021
2 Oct 2021
16 Sept 2021
1 Oct 2021
16 Sept 2021
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) including carriage of material all complete
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including carriage of material all complete
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including carriages of material all complete
Providing and dumping of stones including carriage of material all complete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level (Vertical and Horozontial) including carriage of material all complete
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) including carriage of material all complete
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns including carriage of material all complete
Centering and shuttering including strutting, propping etc. and removal of form for:Lintel, beams, plinth beams, girders, bressumers and cantilevers. Including carriage of material all complete
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. Including carriage of material all complete
Centering and shuttering including strutting, propping etc. and removal of form for: Under 20 cm wide Including carriage of material all complete
Centering and shuttering including strutting, propping etc. and removal of form for: edges slab Including carriage of material all complete
CIB (citizen information Board ) size 4'00"x5'00"x0'9" (above plinth level) with tepered top having 20 degree slope in Brick Masonary(1:4) including plaster , paint, lettering and logos as per instruction of Engineer -in-charge including carriage of material. ( complete job)
KABIR AHMED
NASRIAN BEGUM
ABDUL RASHID WANI
MIR CONSTRUCTION
NASEER AHMED
MOHD AMIN
NAZIR AHMED MIR
TARIQ AHMED
NAZIR AHMED
MOHAMMAD ASHRAF
Tufail Ahmed
Sh Mohd Iqbal Dar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .