Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 CrAccepted-AOC | ₹7.1 Cr Quoted ₹8.4 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹8.5 Cr+₹15.9 L (1.90%)Rejected-Finance | ₹8.5 Cr+₹15.9 L (1.90%) | L2 | Rejected-Finance High Quoted |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.0 Cr
EMD Value
₹4.1 L
Closing Date
10 Oct 2019, 3:00 pmClosed
SE Highways C and M Tirunelveli
office of the superintending engineer highways Tirunelveli
Impts impts to Riding qty Widng from SL to ILWidening of Curve Portion Providing Jun Impts and Widening of RCC Slab Cult and Recon of Pipe culvert to ODR in Sattur HCM Sub Division incl upkeg for a period of 60m
2019_HWAY_136972_1
TN No 5 2019 20 D1 dated 30 08 2019
Open Tender
Civil Works - Highways
Percentage
240 days
Sattur
Average Annual Turnover
Completed Contracts
Minimum quantities of works completed in one year during the last five years
Personnel capabilities
Equipmance sheet for the last five years
Litigation history
7 documents required · 7 mandatory
₹0
₹4.1 L
25 Mar 2022
7 Sept 2019
14 Oct 2019
8 Sept 2019
10 Oct 2019
20 Sept 2019
9 Sept 2019 - 16 Sept 2019
eProcurement System Government of Tamil Nadu Created By: Amutha Ram Created Date/Time: 23-Oct-2019 02:56 PM Tender Title: Impts impts to Riding qty Widng from SL to ILWidening of Curve Portion Providing Jun Impts and Widening of RCC Slab Cult and Recon of Pipe culvert to ODR in Sattur HCM Sub Division incl upkeg for a period of 60m Tender ID: 2019_HWAY_136972_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Tirunelveli Circle
PACKAGE 2 - Improvements, Improvements to Riding quality, Widening from Single Lane to Intermediate lane , Widening of Curve Portion, Providing Junction Improvements and Widening of RCC Slab Culvert and Reconstruction of Pipe culvert to Other District Road in Sattur (H) C&M, Sub –Division including upkeeping for a period of 60 months 1 Improvements of Sattur -Travellers Bangalow -Ramalingapuram Road -Ammapatti (v) Kathalampatti at km 1/4 - 3/4 including upkeeping for a period of 60 months 2 Improvements of Koppureddiapatti - Ravoothanpatti Road ( Via) Nallamuthanpatti Road at km 0/0 - 1/0 and 2/700 - 3/0 including upkeeping for a period of 60 months 3 Improvements of Chinna Kollapatti- Ayyampatti Road at km 9/0 - 10/0 including upkeeping for a period of 60 months 4 Improvements of Nenmeni - Kosugundu Road -P.Lakshmiyapuram Road (Via) Mutharpatti at km 2/100 - 3/500 including reconstruction of pipe culvert at Km 3/5 including upkeeping for a period of 60 months 5 Widening from Single lane to Intermediate lane and Improvements of Elayirampannai - E.L.Reddiapatty Road at km 0/4 - 1/2 including upkeeping for a period of 60 months 6 Widening the curve at km 0/0-0/4 of Elayirampannai - E.L.Reddiapatty Road including upkeeping for a period of 60 months 7 Providing Junction improvement at km 0/2 of Koppureddiapatti - Ravoothanpatti Road (Via) Nallamuthanpatti Road including upkeeping for a period of 60 months 8 Widening of RCC Slab Culverts across odai at km 0/6, 1/2 of Elayirampannai - E.L.Reddiapatty Road including upkeeping for a period of 60 months 9 Improvements of Madurai - Kanniyakumari Road to Neeravipatti Road at km 0/0 - 2/0 including upkeeping for a period of 60 months 01 Improvements to Riding Quality at km 2/0 - 4/0 of Thulukkankuruchi - District limit Road (via) Sevalpatti including upkeeping for a period of 60 months 02 Improvements to Riding Quality at km 5/0 - 6/460 of Thulukkankuruchi - District limit Road (via) Sevalpatti including upkeeping for a period of 60 months 03 Improvements to Riding Quality at km 0/0 - 1/8 of Chinna Kollapatti- Ayyampatti Road including upkeeping for a period of 60 months 04 Improvements to Riding Quality at km 8/0 - 9/0 of Chinna Kollapatti- Ayyampatti Road including upkeeping for a period of 60 months 05 Improvements to Riding Quality at km 10/0 - 11/6 of Chinna Kollapatti- Ayyampatti Road including upkeeping for a period of 60 months 06 Improvements to Riding Quality at km 0/0 - 2/0 of Thulukkankuruchi - District limit Road (via) Sevalpatti including upkeeping for a period of 60 months 07 Improvements to Riding Quality at km 0/0 - 2/8 of Elayairampannai-District Limit Road (via) Madathupatti (Using plastic waste) including upkeeping for a period of 60 months 08 Improvements to Riding Quality at km 0/0 - 2/0 of Sattur -Elayirampannai Road to P.Lakshmiyapuram Road including upkeeping for a period of 60 months
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 S. ARUNACHALAM 71022916.207 7.000 85113862.000 Eight Crore Fifty One Lakh Thirteen Thousand Eight Hundred and Sixty Two
2.00 A Kamaraj 71022916.207 5.000 83522949.000 Eight Crore Thirty Five Lakh Twenty Two Thousand Nine Hundred and Fourty Nine
Lowest Amount Quoted BY: A Kamaraj(83522949.000)
BOQ Summary Details Tender Title: Impts impts to Riding qty Widng from SL to ILWidening of Curve Portion Providing Jun Impts and Widening of RCC Slab Cult and Recon of Pipe culvert to ODR in Sattur HCM Sub Division incl upkeg for a period of 60m Tender ID: 2019_HWAY_136972_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 A Kamaraj 83522949.000 L1
2 S. ARUNACHALAM 85113862.000 L2
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .