Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | ₹9.9 L | L1 | Accepted-AOC Qualified in AOC |
| 2 | L2₹10.2 LRejected-AOC | ₹10.2 L | L2 | Rejected-AOC Qualified in AOC |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
| Sl No | Description | Qty | Unit | sriramulu L2 | M.Nagarajan L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth as per SS 20B | 27.96 | CUM | 150 ₹4,194 | 132 ₹3,690.72 |
| 2.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering including all labour charges etc.complete. | 47.18 | CUM | 5,400 ₹2.5 L | 5,337 ₹2.5 L |
| 3.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method including all etc., | 37.86 | CUM | 2,400 ₹90,864 | 2,325 ₹88,024.50 |
| 4.00 | Centering Materials for Concrete works using mild steel sheets with supports including all cost and conveyance of all materials etc.complete | 250.48 | SQM | 400 ₹1.0 L | 330 ₹82,658.40 |
| 5.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering including all labour charges etc.complete. | 61.9 | CUM | 6,650 ₹4.1 L | 6,626 ₹4.1 L |
| 6.00 | Providing and Laying of Bituminous Pad including cost and conveyance of all labourcharges etc.complete | 5.91 | SQM | 220 ₹1,300.20 | 220 ₹1,300.20 |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 1,55,332.3 ₹1.6 L | 1,50,772.12 ₹1.5 L |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
24 Feb 2026, 3:00 pmClosed
The President Lathur Panchayat.
Panchayat office Building, Lathur Panchayat
Providing Cement Concrete Pavement in Samathuvam buriyal Ground at Lathur Panchayat in Lathur Panchayat Union.Estimate.10.00 Lakhs,ADWF/2025-26
2026_RDTN_659608_1
Tender ref No. 3977/2025/A4ADP Date.08.01.2026
Open Tender
Civil Works
Providing Cement Concrete Pavement in Samathuvam b
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
28 Feb 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth as per SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering including all labour charges etc.complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method including all etc.,
Centering Materials for Concrete works using mild steel sheets with supports including all cost and conveyance of all materials etc.complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering including all labour charges etc.complete.
Providing and Laying of Bituminous Pad including cost and conveyance of all labourcharges etc.complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Technical.pdf
Tender Documents • 0.85 MB
BOQ_791404.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid