Loading…
Loading…
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
5 Oct 2026, 3:00 pm
The Block Development Officer (BP), Vembakottai
The Block Development Officer (BP), Vembakottai
Construction of Passengers Shelter at Mela Kothainachiyapuram village in Vijayarengapuram Panchayat
2026_RDTN_705294_1
A3/2043/2026 date.17.09.2026
Open Tender
Civil Works
Item Wise
The Block Development Officer (BP), Vembakottai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,000
Yes
17 Sept 2026
17 Sept 2026
5 Oct 2026
17 Sept 2026
5 Oct 2026
17 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Passengers Shelter @ Mela Kothainachiyapuram village in Vijayarengapuram Panchayat. | |||||
| 1.1 | Earth work excavating and deposition on bank with intial lead and lift all clauses of soil such as hard stiff clay soil , as per SS 20 B for foundation etc., | 10.77 | Cum | - | - |
| 1.2 | Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 4.76 | Cum | - | - |
| 1.3 | Brick work in CM 1:5 mix using country bricks including all cost and conveyance of labour charges etc., | 15.76 | Cum | - | - |
| 1.4 | Supplying and fabrication of steel for RCC works including all cost and covneyacne of labour charges etc | 14.98 | Qtl | - | - |
| 1.5 | RCC 1:1/2:3 mix using 20 mm metal including all cost and conveyacne of labour charges etc., | 11.01 | Cum | - | - |
| 1.6 | Cetering charges for RCC works including all cost and conveyance of labour charges etc., | 91.96 | Sq.m | - | - |
| 1.7 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 34.06 | Sq.m | - | - |
| 1.8 | Plastering with CM 1:5 mix 12 mm thick including all cost and conveyance of labour charges etc., | 129.5 | Sq.m | - | - |
| 1.9 | Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete | 1.23 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
Vijayarengapurampid.pdf
Tender Documents • 0.78 MB
BOQ_847757.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .