Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹7.1 Cr
EMD Value
₹7.1 L
Closing Date
3 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
C.C.E, Northern R AND B Circle, SAMBALPUR
O/O THE C.C.E, Northern R AND B Circle, SAMBALPUR
Construction of Court Building for JMFC and Civil Judge at Barkote Buildings.
2026_EICCL_146485_1
CCENC (R AND B)/06/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
330 days
Debagarh
4 documents required · 4 mandatory
₹10,000
₹7.1 L
Yes
18 Nov 2026
18 Nov 2026
4 Dec 2026
18 Nov 2026
3 Dec 2026
18 Nov 2026
18 Nov 2026 - 25 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation trenches in All kinds of soil including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site with all leads and lifts, including shoring, shuttering and dewatering (if required) with cost of labour, hire & running charges of water pumps sundries & T&P required for the work complete as directed by the Engineer-in-charge. | 3,050.87 | cum | 311.53 | ₹9,50,437.53 |
| 2 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-in-charge. | 1,909.43 | cum | 207.69 | ₹3,96,569.52 |
| 3 | Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. In depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. (Measurement will be taken on finished compacted section only). | 1,799.61 | cum | 640.64 | ₹11,52,902.15 |
| 4 | Supplying, diluting and preparing chemical emulsion like imidacloprid 30.5% SC or other chemicals approved by central insecticides board of as directed by the manufactured and spraying the mixture uniformly by sprayers as pre- constructional Anti-termite treatment confirming to IS 6313 (part-ll) and creating a chemical barrier under and around the column pits, wall trenches basement excavation joints, surrounding the pipes and conduits etc. at the rate of 7.5 liters per sqm on vertical surface and 5.0 liters per sqm on horizontal surfaces, 50% of the emulsion to be filled in the holes made in trenches at 150mm center ( or as directed by the manufactured ) including the cost of all materials cost of all labour, conveyance loading unloading , T&P. etc. all complete as per the direction of engineer-in-charge. | 1,627.31 | sqm | 127.77 | ₹2,07,921.4 |
| 5 | Providing and lying plain cement concrete of proportion (1:3:6) in foundation and floors using Portland slag cement (PSC) with 40 mm. Size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm thick in each layer including cost, conveyance, loading, unloading, royalties and taxes all materials and cost all labours, sundries, T & P required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump complete as per the instruction of the Engineer-in-Charge. | 293.09 | cum | 6,504.94 | ₹19,06,532.86 |
| 6 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. Ground FLoor
a)Footing | 222.52 | cum | 7,206.32 | ₹16,03,550.33 |
| 7 | b)Column up to Pl Lvl :- | 18.2 | cum | 16,600.95 | ₹3,02,137.29 |
| 8 | c)Tie/Plinth Beam :- | 96.67 | cum | 8,082.37 | ₹7,81,322.71 |
| 9 | d)Column up to roof lvl :- | 44.8 | cum | 16,600.95 | ₹7,43,722.56 |
| 10 | e)Lintel :- | 15.55 | cum | 14,937.01 | ₹2,32,270.51 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.58 MB
Tendernotice_3.pdf
PDF • 0.41 MB
Tendernotice_1.pdf
PDF • 2.96 MB
BOQ_621690.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .