| 1 | L1₹22.1 LAccepted-AOC | ₹22.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹22.6 L+₹55,244.32 (2.50%)Rejected-Finance | ₹22.6 L+₹55,244.32 (2.50%) | L2 | Rejected-Finance L2 |
| 3 | L3₹23.2 L+₹1.2 L (5.32%)Rejected-Finance BANSAL NIWAS RAM NAGAR SHIMLA 171004 HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171004 | ₹23.2 L+₹1.2 L (5.32%) | L3 | Rejected-Finance L3 |
| 4 | L4₹23.3 L+₹1.2 L (5.66%)Rejected-Finance | ₹23.3 L+₹1.2 L (5.66%) | L4 | Rejected-Finance L4 |
| 5 | L5₹23.5 L+₹1.4 L (6.56%)Rejected-Finance R O VILL KHANAR P O MUNDU TEH THEOG DISTT SHIMLA 171226 | SHIMLA | HIMACHAL PRADESH | 171226 | ₹23.5 L+₹1.4 L (6.56%) | L5 | Rejected-Finance L5 |
Tender Value
₹28.4 L
EMD Value
₹56,740
Closing Date
30 Aug 2022, 6:00 pmClosed
E. E. SHIMLA DIVISION NO. III, HPPWD, Shimla-3
E. E. SHIMLA DIVISION NO. III, HPPWD, Shimla-3
Construction of Parking at Balquali Parking near Chaura Maidan Shimla-04.(SH- Construction of parking etc.).
2022_PWD_64034_1
SD-III-T-14255-76dt.18-8-2022
Open Tender
Civil Works - Buildings
Item Rate
60 days
VidhanSabhaShimla
As per SBD
10 documents required · 10 mandatory
₹1,500
₹56,740
20 Dec 2024
24 Aug 2022
31 Aug 2022
24 Aug 2022
30 Aug 2022
24 Aug 2022
Amount
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within all leadand lifts as per direction of Engineer-in-charge :
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all leads.
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. complete.including carriage of materials within all leads and lifts.including carriage of materials all leads and lifts as per direction of Engineer- in - Charge.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing :1:5:10 (1 cement : 5 coarse sand) : 10 graded stone aggregate 40 mm nominal size).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor all level, excluding the cost of centering, shuttering and finishing :1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, alconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses/ Framed work etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
Providing and fixing 8 mm thick chequered steel plates including cutting welding complete in flooring over steel frame work to be paid seperatly). including carriage of materials in all leads and lifts. As per direction of Engineer-in charge.
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm of approved brand and manufacture
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
AV Constructions
Sandeep Kumar
ASHWANI VIJ
Narender Singh
Ramesh Chand Rana
RAMESH VIJ
Kuldeep Sharma
M Pandit
mukul thakur
Siddharth kanwar
Mitter Dev Sharma
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .