Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | ₹9.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.1 LRejected-Finance | ₹11.1 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹11.2 LRejected-Finance 280 B NIZAMUDDINPURA POWER HOUSE ROAD MAU | MAU | MAU | UTTAR PRADESH | ₹11.2 L | L3 | Rejected-Finance Rejected |
Tender Value
₹15 L
EMD Value
₹1.5 L
Closing Date
26 Mar 2026, 12:00 pmClosed
EE PD PWD Bulandshahr
EE PD PWD Bulandshahr
Repair and protective work of the small bridge located on the Neem river at km 10 of Jirauli Sorla Sorkha Nagla Jagat Kheliya Kheliya road in District Bulandshahr
2026_CEMRT_1128659_4
1553/1A Dt. 20.03.2026
Open Tender
Civil Works - Bridges
90 days
Bulandshahr
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹1.5 L
Yes
EE PD PWD Bulandshahr
18 Apr 2026
21 Mar 2026
26 Mar 2026
21 Mar 2026
26 Mar 2026
21 Mar 2026
21 Mar 2026 - 23 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 2Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 3Brick masonry work in cement mortar (1:3) in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 4Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 5Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical Specification Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 6Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 110 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications MORTH 13.08 (2706 & 2200) Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
| 7Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat preparation of surface etc. complete. (For Concrete work) Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | |||||
stage.html
html • 0.04 MB
techsummary_2105080.pdf
BOQ Comparative Chart
xlsx
finsummary_2105080.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
T1.pdf
Tender Documents • 1.42 MB
BOQ_2105080.xls
BOQ • 0.80 MB
Download all tender documents and submit your bid