| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC | ₹2.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.0 Cr+₹49.4 L (19.8%)Rejected-AOC 00 SHIVPURI BRIJRAJ NAGAR MARTHNA ETAWAH | ETAWAH | ETAWAH | UTTAR PRADESH | ₹3.0 Cr+₹49.4 L (19.8%) | L2 | Rejected-AOC L2 |
| 3 | L3₹3.2 Cr+₹71.6 L (28.8%)Rejected-AOC | ₹3.2 Cr+₹71.6 L (28.8%) | L3 | Rejected-AOC L3 |
| 4 | L4₹3.7 Cr+₹1.2 Cr (46.9%)Rejected-AOC GANDHI NAGAR DISTRICT MAHOBA UTTAR PRADESH | MAHOBA | UTTAR PRADESH | 210421 | ₹3.7 Cr+₹1.2 Cr (46.9%) | L4 | Rejected-AOC L4 |
| 5 | L5₹3.7 Cr+₹1.2 Cr (47.7%)Rejected-AOC | ₹3.7 Cr+₹1.2 Cr (47.7%) | L5 | Rejected-AOC L5 |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
27 Dec 2023, 11:00 amClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC MAHOBA
Construction of Canal C.C. Lining of Kabrai main canal at km 1.900, 2.900, 3.000, 19.700 to 20.100, 20.250, 29.800 to 30.000, 34.000, 34.300 and 40.400
2023_UPIDC_871916_1
10/SE/2023-24
Open Tender
Civil Works
Item Rate
120 days
MAHOBA
as per nit and tender document
2 documents required · 2 mandatory
₹7,058
₹7.4 L
27 Feb 2024
19 Dec 2023
27 Dec 2023
19 Dec 2023
27 Dec 2023
19 Dec 2023
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
Excavation of foundation in all type of strata excluding hard rock including disposal with all leads, lifts & T&P etc for proper completion of Job as per direction of Engineer-In-Charge.
Prepation of Sub grade for lining work including materail & labour & T&P etc for proper completion of Job as per direction of Engineer-In-Charge.
Supplying and laying corsand in foundation including all lead and lift labour material T&P etc for proper completion of work as per direction of Engineer-In-Charge.
Laying A-20 M-20 R.C.C. 1:1.5:3 by mechanical mixing and mechanical vibration with 10 mtr interwell, cement consumption of 7.90 bags per cum including cost of all material, labour and T&P etc for proper completion of Job as per direction of Engineer-In-Charge.
Laying A-20 M-15 lean C.C. 1:2:4 by mechanical mixing and mechanical vibration with 10 mtr interwell, cement consumption of 7.90 bags Per cum including cost of all material, labour and T&P etc for proper completion of Job as per direction of Engineer-In-Charge.
Bitumen paiting top of sleeper including cost of all material, labour and T&P etc for proper completion of Job as per direction of Engineer-In-Charge.
Laying LDEP flim 200 mircorn including cost of material, labour, T&P etc for proper completion of Job as per direction of Engineer-In-Charge.
Providing & Laying steel reinforcement for R.C.C. work including cost of steel cutting, bending, placing in position binding with G.I. wire and welding etc including cost of all material T&P and all leads and lifts for proper completion of Job as per direction of Engineer-In-Charge.
Centering & shuttering for R.C.C. work including cost of material, labour, T&P etc for proper completion of Job as per direction of Engineer-In-Charge.
Supplying & fixing joint filler board 20 mm including cost of material, labour, T&P etc with all lead & lifts etc for proper completion of Job as per direction of Engineer-In-Charge.
Filing 15 X 75 mm joints of C.C lining with bitumen sealing compound including cost of material, labour, T&P etc with all lead & lifts for proper completion of Job as per direction of Engineer-In-Charge.
Laying 10 mm dia perforated Pvc pipe below lining including cost of material, labour, T&P etc with all lead & lifts etc for proper completion of Job as per direction of Engineer-In-Charge.
Plaster In 1:2 cm on top of sand filling including cost of material, labour, T&P etc with all Lead & Lifts etc for proper completion of Job as per direction of Engineer-In-Charge.
M/S Yuraj construction
M/S KASON CONSTRUCTION
M/s Trivedi Associates
M/S VIVEK KUMAR SINGH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .