Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC | ₹2.9 Cr | L1 | Accepted-AOC QUALIFIED |
| 2 | L2₹3.0 Cr+₹5.7 L (1.94%)Rejected-AOC | ₹3.0 Cr+₹5.7 L (1.94%) | L2 | Rejected-AOC QUALIFIED |
Tender Value
₹3.0 Cr
EMD Value
₹6.1 L
Closing Date
28 Jul 2021, 5:00 pmClosed
SECRETARY MC RANIA
RANIA
CONSTRUCTION OF PARK NEAR GOVT. COLLEGE AT MC RANIA
2021_HRY_179794_1
CONSTRUCTION OF PARK MC RANIA01
Open Tender
Civil Works
Works
270 days
RANIA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Yes
₹6.1 L
Yes
26 Aug 2021
14 Jul 2021
30 Jul 2021
14 Jul 2021
28 Jul 2021
14 Jul 2021
Amount
High Density Composite Polymer (HDCP) fly Twin Dustbin Heat specification- high density Composite polymer (HDCP) fly twin dustbin
Recycled High Density E Composite Polymer (HDCP) heat and corrosion resistance, anti-skidding, acid-proof tile of approx. 25 MM thickness factory made waste plastic polymer (PP, HDPE, LDPE) with fillers and fly ash interlocking paver block
LED Street Lights With Lense- (Back Opening) SSK-SLF-BO 60W (50W)
LED Garden Lights (6000K / 3000K) SSK-013541-16W
LED Garden Lights (6000K / 3000K) SSK-3746-9W
LED Bollard Lights (6000K / 3000K) SSK-3281-12W
LED Mounting Track Lights SSK-TRE-16W
LED Lamps ( Dualite Series ) - B22 Base (6500K~3000K) 310 SSK-PAG-12W-2 IN 1
Bidder Name
Amount
Tilak Rai Contractors(GSTN-NA)
Nirmal Singh contractor(GSTN-NA)
Tilak Rai Contractors
Tilak Rai Contractors
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .